Bent Tree Wind Farm Phase 1

31072 State Highway 13, Hartland, MN 56042

Plant Summary Information

Bent Tree Wind Farm Phase 1 is ranked #29 out of 739 power plants in Minnesota in terms of total annual net electricity generation.

Bent Tree Wind Farm Phase 1 generated 100.4 GWh during the 3-month period between September 2023 to December 2023.

Plant NameBent Tree Wind Farm Phase 1
Utility NameWisconsin Power & Light Co
LocationFreeborn County, MN
Initial Operation DateFebruary 2011
Last Update Dec 2023
Annual Generation 341.6 GWh
Annual Consumption 1.3 M MMBtu
Ranked #1,725 out of 11,993 Power Plants Nationwide
Ranked #520 out of 1,361 Wind Power Plants Nationwide
Ranked #29 out of 739 Minnesota Power Plants
Ranked #16 out of 125 Minnesota Wind Power Plants
Fuel Types Wind

Map of Bent Tree Wind Farm Phase 1

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bent Tree Wind Farm Phase 1.

Create Your Account Today

Monthly Net Generation for Bent Tree Wind Farm Phase 1

Bent Tree Wind Farm Phase 1 Details

Summary Information
Plant NameBent Tree Wind Farm Phase 1 (57198)
Plant Address31072 State Highway 13, Hartland, MN 56042
UtilityWisconsin Power & Light Co (20856)
Latitude, Longitude43.7246, -93.45043
Generation Dates on FileFeb 2011 to Dec 2023
Initial Operation DateFebruary 2011
Annual Generation 341.6 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment
Transmission / Distribution OwnerITC Midwest LLC (56161)
Grid Voltage 161.00 kV
Energy StorageNo

Generator 1 Details Operating February 2011

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationALTW.BENT_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataALTW.BENT_TREE
Nameplate Capacity201.3 MW
Nameplate Power Factor0.9
Summer Capacity201.3 MW
Winter Capacity201.3 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2011
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys122
Time From Cold Shutdown To Full Load10M
Other Planned ModificationsNo
Multiple FuelsNo
Turbine Details
Number Of Turbines122
Predominant Turbine ManufacturerVestas
Predominant Turbine Model NumberV82-1.65
Design Wind Speed16.3 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet262

Bent Tree Wind Farm Phase 1 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#510Spinning Spur Wind LLCVegas, TX346.5 GWh
#511Cameron Wind 1 LLCRio Hondo, TX346.0 GWh
#512Roscoe Wind Farm LLCRoscoe, TX345.9 GWh
#513Turkey Track Wind Energy LLCBlackwell, TX345.7 GWh
#514Majestic 1 Wind FarmPanhandle, TX345.1 GWh
#515Minco Wind I, LLCMinco, OK343.9 GWh
#516Prairie Winds SD1Crow Lake, SD343.7 GWh
#517Mehoopany Wind Energy LLCNoxen, PA343.3 GWh
#518Baron Winds FarmCohocton, NY342.6 GWh
#519High PlainsRock River, WY342.1 GWh
#521Meadow Lake Wind Farm V LLCChalmers, IN341.6 GWh
#522Spring Valley Wind ProjectEly, NV339.3 GWh
#523Lorenzo WindLorenzo, TX338.7 GWh
#524Duran Mesa LLCDuran, NM337.2 GWh
#525Colorado Highlands WindFleming, CO337.2 GWh
#526Alta Wind XMojave, CA336.5 GWh
#527Ashtabula Wind II LLCLuverne, ND335.8 GWh
#528Contrail Wind FarmBedford, IA335.8 GWh
#529Midland WindKewane, IL334.6 GWh
#530Los Vientos V Wind PowerRio Grande City, TX334.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Bent Tree Wind Farm Phase 1.

Plant NamePlant LocationAnnual GenerationDistance
Altair Community Solar GardenNew Richmond, MN1.9 GWh14 mi
Blooming PrairieBlooming Prairie, MN167.0 MWh22.2 mi
Bolduan CSGNew Richland, MN1.7 GWh12.7 mi
Buffalo GardenWaseca, MN1.8 GWh19.2 mi
CF Novel Solar CSG Gardens Two, LLCMinnesota Lake, MN3.2 GWh21 mi
Clear Garden CSGWaseca, MN1.7 GWh21.6 mi
Freeborn Wind FarmGlenville, MN778.3 GWh19.6 mi
Goose Lake MN DPC-GMAlbert Lea, MN2.8 GWh8.8 mi
Lake MillsLake Mills, IA32.0 MWh21.6 mi
Novel David Solar LLC CSGWaseca, MN2.2 GWh19.2 mi
Novel Kanewischer Solar CSGWaseca, MN1.9 GWh22.6 mi
Oak Glen Wind FarmBlooming Prairie, MN95.7 GWh20.5 mi
Old Gold Energy Center, LLCJoice, IA106.8 GWh23.6 mi
REG Juhl Glenville Wind, LLCAlbert Lea, MN8.5 GWh12.2 mi
Severson GardenWaseca, MN1.8 GWh19.2 mi
Silver Lake GardenWaseca, MN3.6 GWh19.7 mi
USS All In Solar LLC CSGHartland, MN2.2 GWh8.3 mi
USS Solar Way LLC CSGHartland, MN2.1 GWh7 mi
WasecaSunWaseca, MN9.6 GWh22.8 mi
Wells ICWells, MN128.0 MWh13.7 mi