Bellingham Cogeneration Facility
92 Depot Street, Bellingham, MA 2019Plant Summary Information
Bellingham Cogeneration Facility is ranked #18 out of 573 power plants in Massachusetts in terms of total annual net electricity generation.
Bellingham Cogeneration Facility is comprised of 3 generators and generated 17.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Bellingham Cogeneration Facility |
---|---|
Utility Name | Northeast Energy Associates LP |
Location | Norfolk County, MA |
Initial Operation Date | September 1991 |
Last Update | Dec 2022 |
Annual Generation | 211.1 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #2,271 out of 11,249 Power Plants Nationwide | |
Ranked #737 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #18 out of 573 Massachusetts Power Plants | |
Ranked #12 out of 41 Massachusetts Natural Gas Power Plants | |
Fuel Types | Natural Gas : 97.7% Distillate Fuel Oil : 2.3% |
Map of Bellingham Cogeneration Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bellingham Cogeneration Facility.
Monthly Net Generation for Bellingham Cogeneration Facility
Bellingham Cogeneration Facility Details
Summary Information | |
---|---|
Plant Name | Bellingham Cogeneration Facility (10307) |
Plant Address | 92 Depot Street Bellingham, MA 2019 |
Utility | Northeast Energy Associates LP (21970) |
Latitude, Longitude | 42.0925, -71.4833 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | September 1991 |
Annual Generation | 211.1 GWh |
Fuel Types | Natural Gas : 97.7% Distillate Fuel Oil : 2.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Plant uses ACC |
Ash Impoundment | |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Spectra Energy (Enbridge). Also, Facility is no longer CHP, as they no longer sell steam to neighboring facility. |
Generator CT1 Details Operating September 1991
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 128.7 MW |
Nameplate Power Factor | 0.97 |
Summer Capacity | 102 MW |
Winter Capacity | 126 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 97 MW |
Net Winter Capacity With Natural Gas | 112 MW |
Net Summer Capacity With Oil | 78 MW |
Net Winter Capacity With Oil | 89.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator CT2 Details Operating September 1991
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 128.7 MW |
Nameplate Power Factor | 0.97 |
Summer Capacity | 102 MW |
Winter Capacity | 126 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 97 MW |
Net Winter Capacity With Natural Gas | 112 MW |
Net Summer Capacity With Oil | 78 MW |
Net Winter Capacity With Oil | 89.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator ST1 Details Operating September 1991
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 128.7 MW |
Nameplate Power Factor | 0.97 |
Summer Capacity | 60 MW |
Winter Capacity | 84 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Bellingham Cogeneration Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#727 | Marsh Landing Generating Station | Antioch, CA | 210.6 GWh |
#728 | Larsen Memorial | Lakeland, FL | 211.2 GWh |
#729 | Lake Catherine | Jones Mill, AR | 210.1 GWh |
#730 | Lake Charles Polymers | Westlake, LA | 210.0 GWh |
#731 | Midway Sunset Cogen | Fellows, CA | 209.7 GWh |
#732 | Saguaro Power | Henderson, NV | 209.1 GWh |
#733 | Los Angeles Refinery Wilmington | Wilmington, CA | 427.3 GWh |
#734 | Harry D Mattison Gas Plant | Tontitown, AR | 208.8 GWh |
#735 | Almond Power Plant | Modesto, CA | 207.5 GWh |
#736 | Concord | Watertown, WI | 207.5 GWh |
#738 | Georgetown | Indianapolis, IN | 206.1 GWh |
#739 | Henry County | New Castle, IN | 206.1 GWh |
#740 | Tropicana Products Bradent | Bradenton, FL | 205.7 GWh |
#741 | Chester Operations | Chester, PA | 203.5 GWh |
#742 | Bluegrass Generating Station | LaGrange, KY | 212.0 GWh |
#743 | Covington Facility | Covington, VA | 732.3 GWh |
#744 | Castleton Energy Center | Castleton, NY | 198.7 GWh |
#745 | Hamlet Generating Facility | Hamlet, NC | 205.4 GWh |
#746 | Woodsdale | Trenton, OH | 197.5 GWh |
#747 | Crossroads Energy Center | Clarksdale, MS | 196.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bellingham Cogeneration Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
126 Grove Solar LLC | Franklin, MA | 2.5 GWh | 3.3 mi |
ANP Bellingham Energy Project | Bellingham, MA | 3.3 TWh | 2 mi |
ANP Blackstone Energy Project | Blackstone, MA | 2.8 TWh | 2.8 mi |
Blackstone/Tupperware | North Smithfield, RI | 4.1 GWh | 6.2 mi |
Bourne (MA) - Holliston I | Holliston, MA | 3.6 GWh | 6.1 mi |
BWC Muddy Brook, LLC Hybrid | Mendon, MA | 1.9 GWh | 1.2 mi |
BWC Wading River One, Two, Three CSG | Mendon, MA | 5.4 GWh | 2.3 mi |
Exelon Medway LLC | Medway, MA | 3.3 GWh | 3.8 mi |
Exelon West Medway II LLC | Medway, MA | 158.5 GWh | 3.7 mi |
Franklin 1 | Wrentham, MA | 3.8 GWh | 5.8 mi |
Franklin 2 | Franklin, MA | 5.7 GWh | 5.4 mi |
Holliston Solar CSG | Holliston, MA | 1.8 GWh | 5.4 mi |
Hurteau Solar Project Hybrid | Uxbridge, MA | 3.3 GWh | 7.3 mi |
Kearsarge Bellingham PV | Bellingham, MA | 5.3 GWh | 1.9 mi |
Kearsarge Uxbridge | Uxbridge, MA | 3.6 GWh | 5.9 mi |
Kearsarge William Way | Bellingham, MA | 7.6 GWh | 0.9 mi |
MA Blackstone | Blackstone, MA | 2.0 GWh | 5.1 mi |
Mendon | Mendon, MA | 4.0 GWh | 1 mi |
Milford Power LP | Milford, MA | 147.3 GWh | 2.9 mi |
Thundermist Hydro | Providence, RI | 4.3 GWh | 6.7 mi |