Belleville
1819 L Street, Belleville, KS 66935Plant Summary Information
Belleville is ranked #42 out of 58 natural gas power plants in Kansas in terms of total annual net electricity generation.
Belleville is comprised of 5 generators and generated 42.7 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Belleville |
---|---|
Utility Name | City of Belleville - (KS) |
Location | Republic County, KS |
Initial Operation Date | January 1955 |
Last Update | Dec 2023 |
Annual Generation | 178.0 MWh |
Annual Consumption | 2.4 k MMBtu |
Ranked #11,317 out of 11,835 Power Plants Nationwide | |
Ranked #2,132 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #115 out of 152 Kansas Power Plants | |
Ranked #42 out of 58 Kansas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 63.2% Distillate Fuel Oil : 36.8% |
Map of Belleville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Belleville.
Monthly Net Generation for Belleville
Belleville Details
Summary Information | |
---|---|
Plant Name | Belleville (1263) |
Plant Address | 1819 L Street, Belleville, KS 66935 |
Utility | City of Belleville - (KS) (1512) |
Latitude, Longitude | 39.83277, -97.63204 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1955 |
Annual Generation | 178.0 MWh |
Fuel Types | Natural Gas : 63.2% Distillate Fuel Oil : 36.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | City Water |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Belleville - (KS) (1512) KS |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | KANSAS GAS SERVICE COMPANY |
Natural Gas Storage | No |
Generator 4 Details Operating January 1955
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1955 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 1 MW |
Net Winter Capacity With Natural Gas | 1 MW |
Net Summer Capacity With Oil | 1 MW |
Net Winter Capacity With Oil | 1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 5 Details Operating January 1961
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1961 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 1.7 MW |
Net Winter Capacity With Natural Gas | 1.7 MW |
Net Summer Capacity With Oil | 1.7 MW |
Net Winter Capacity With Oil | 1.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 6 Details Operating January 1966
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.7 MW |
Winter Capacity | 3.7 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1966 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 3.7 MW |
Net Winter Capacity With Natural Gas | 3.7 MW |
Net Summer Capacity With Oil | 3.7 MW |
Net Winter Capacity With Oil | 3.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 7 Details Operating January 1971
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 5.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5.1 MW |
Winter Capacity | 5.1 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 5.1 MW |
Net Winter Capacity With Natural Gas | 5.1 MW |
Net Summer Capacity With Oil | 5.1 MW |
Net Winter Capacity With Oil | 5.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 8 Details Operating January 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2005 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Belleville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2122 | Blossburg | Blossburg, PA | 136.0 MWh |
#2123 | Cholla | Joseph City, AZ | 1.5 TWh |
#2124 | MMWAC Resource Recovery Facility | Auburn, ME | 10.9 GWh |
#2125 | HEB00048 | Beaumont, TX | 129.0 MWh |
#2126 | Substation 20 Plant | Orangeburg, SC | 122.0 MWh |
#2127 | International Paper Pine Hill Mill | Pine Hill, AL | 448.8 GWh |
#2128 | Genesee Power Station LP | Flint, MI | 114.8 GWh |
#2129 | Novo BioPower Plant | Snowflake, AZ | 175.6 GWh |
#2130 | Baldwin City Plant No 2 | Baldwin City, KS | 145.0 MWh |
#2131 | Auburn | Auburn, NE | 155.0 MWh |
#2133 | Northeast (WA) | Spokane, WA | 112.0 MWh |
#2134 | Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh |
#2135 | Cherry Street | Hudson, MA | 417.0 MWh |
#2136 | Preston (MN) | Preston, MN | 130.0 MWh |
#2137 | US Magnesium | Rowley, UT | 107.8 MWh |
#2138 | Litchfield | Litchfield, MN | 185.0 MWh |
#2139 | OTHERBenEKDallas | Dallas, TX | 107.0 MWh |
#2140 | Waverly Municipal Electric North Plant | Waverly, IA | 224.0 MWh |
#2141 | Falls City | Falls City, NE | 161.0 MWh |
#2142 | Atlantic | Atlantic, IA | 115.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Belleville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beatrice | Beatrice, NE | 579.6 GWh | 55.5 mi |
Beloit | Beloit, KS | 114.0 MWh | 36.4 mi |
Beloit Solar LLC | Beloit, KS | 4.7 GWh | 36.5 mi |
City Light & Water | Blue Hill, NE | 6.0 MWh | 55.2 mi |
Clay Center | Clay Center, KS | 193.0 MWh | 41.6 mi |
Clifton | Clifton, KS | 11.0 GWh | 24.2 mi |
Cloud County Wind Farm | Concordia, KS | 334.4 GWh | 27.4 mi |
Cottonwood Wind Energy Center | Blue Hill, NE | 410.7 GWh | 49.7 mi |
Hebron | Hebron, NE | 4.5 GWh | 24.7 mi |
High Banks Wind, LLC | Cuba, KS | 2.0 TWh | 10.7 mi |
Lincoln | Lincoln, KS | 16.0 MWh | 61.6 mi |
Little Blue Wind Project, LLC | Blue Hill, NE | 960.5 GWh | 51.5 mi |
Milligan 1 Wind Farm | Western, NE | 1.1 TWh | 49.6 mi |
Minneapolis City of | Minneapolis, KS | 84.0 MWh | 49.5 mi |
Osborne | Osborne, KS | 7.8 MWh | 62.4 mi |
Perennial Windfarm | Fairmont, NE | 33.0 GWh | 55.2 mi |
Red Cloud | Red Cloud, NE | 37.0 MWh | 50.4 mi |
Steele Flats Wind Project LLC | Diller, NE | 243.1 GWh | 39 mi |
Washington | Washington, KS | 35.0 MWh | 35.4 mi |
Wilber | Wilber, NE | 33.0 MWh | 57.1 mi |