Beethoven Wind
29098 406th Avenue, Tripp, SD 57376Plant Summary Information
Beethoven Wind is ranked #23 out of 50 power plants in South Dakota in terms of total annual net electricity generation.
Beethoven Wind generated 79.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Beethoven Wind |
---|---|
Utility Name | NorthWestern Energy - (SD) |
Location | Bon Homme County, SD |
Initial Operation Date | May 2015 |
Last Update | Dec 2023 |
Annual Generation | 274.5 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,937 out of 11,852 Power Plants Nationwide | |
Ranked #583 out of 1,345 Wind Power Plants Nationwide | |
Ranked #23 out of 50 South Dakota Power Plants | |
Ranked #17 out of 25 South Dakota Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
B&H Wind LLC (2013 to 2013) BayWa r.e Wind LLC (2014 to 2014) NorthWestern Energy - (SD) (2015 to 2023) |
Map of Beethoven Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Beethoven Wind.
Monthly Net Generation for Beethoven Wind
Beethoven Wind Details
Summary Information | |
---|---|
Plant Name | Beethoven Wind (59187) |
Plant Address | 29098 406th Avenue, Tripp, SD 57376 |
Utility | NorthWestern Energy - (SD) (13809) |
Latitude, Longitude | 43.16, -98.08 |
Generation Dates on File | May 2015 to Dec 2023 |
Initial Operation Date | May 2015 |
Annual Generation | 274.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-1-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | NorthWestern Energy - (SD) (13809) SD |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator B&H80 Details Operating May 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.NWPS.BEETHOVEN |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2015 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 43 |
Other Combustion Technology | No |
Turbine Details | |
Number Of Turbines | 43 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.85-87 |
Design Wind Speed | 20.1 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 262.4 |
Beethoven Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#573 | Crane Creek Wind Energy Center | Riceville, IA | 282.2 GWh |
#574 | White Rock West Wind Project | Anadarko, OK | 280.7 GWh |
#575 | Northwest Ohio Wind | Haviland, OH | 283.9 GWh |
#576 | Wheatridge 1 | Lexington, OR | 278.3 GWh |
#577 | Penascal II Wind Project LLC | Sarita, TX | 277.6 GWh |
#578 | Mountain View I & II | North Palm Springs, CA | 277.3 GWh |
#579 | Campbell Hill Windpower | Glenrock, WY | 277.2 GWh |
#580 | Saratoga Wind Farm | Lime Springs, IA | 276.5 GWh |
#581 | Shiloh III Wind Project LLC | Birds Landing, CA | 275.6 GWh |
#582 | Top of the World Windpower Project | Glenrock, WY | 274.7 GWh |
#584 | Tatanka Wind Power LLC | Ashley, ND | 273.2 GWh |
#585 | Stillwater Wind, LLC | Reed Point, MT | 273.1 GWh |
#586 | Eight Point Wind | Rexville, NY | 272.5 GWh |
#587 | Sendero | Hebbronville, TX | 272.5 GWh |
#588 | Smoky Hills Wind Project Phase I | Lincoln, KS | 272.0 GWh |
#589 | Blue Canyon Windpower V LLC | Carnegie, OK | 272.0 GWh |
#590 | Prairie Breeze II | Elgin, NE | 270.4 GWh |
#591 | Broken Bow Wind II, LLC | Broken Bow, NE | 270.1 GWh |
#592 | Bull Creek Wind | O'Donnell, TX | 269.0 GWh |
#593 | Sunray Wind I | Sunray, TX | 268.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Beethoven Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aurora County Wind | White Lake, SD | 70.8 GWh | 52.3 mi |
Brule County Wind | Kimball, SD | 64.6 GWh | 57.1 mi |
Chamberlain Wind Project | Chamberlain, SD | 98.0 MWh | 75.4 mi |
Crofton Bluffs Wind LLC | Bloomfield, NE | 119.0 GWh | 40.7 mi |
Elkhorn Ridge Wind LLC | Bloomfield, NE | 157.2 GWh | 39.5 mi |
Fort Randall | Pickstown, SD | 1.5 TWh | 24.8 mi |
Gavins Point | Crofton, NE | 715.3 GWh | 37.1 mi |
Grande Prairie Wind Farm | O'Neill, NE | 1.2 TWh | 42 mi |
Haystack Wind Project, LLC | Carroll, NE | 811.7 GWh | 76.5 mi |
Laurel | Laurel, NE | 3.0 MWh | 71.1 mi |
POET Bioprocessing- Mitchell | Mitchell, SD | 17.6 GWh | 44.4 mi |
POET Biorefining - Chancellor | Chancellor, SD | 23.4 GWh | 58.2 mi |
Prairie Winds SD1 | Crow Lake, SD | 343.7 GWh | 61.4 mi |
Prevailing Wind Park | Lesterville, SD | 873.8 GWh | 29.2 mi |
Sholes Wind Energy Center | Randolph, NE | 721.6 GWh | 68.9 mi |
Spirit Mound | Vermillion, SD | 4.7 GWh | 57.9 mi |
Stuart (NE) | Stuart, NE | 6.0 MWh | 66.3 mi |
Thunderhead Wind Energy LLC | Boone, NE | 1.2 TWh | 76.3 mi |
Upstream Wind Energy LLC | Neligh, NE | 812.6 GWh | 67.7 mi |
Wessington Springs | Wessington Springs, SD | 228.5 GWh | 63.6 mi |