Beaver Ridge Wind
End of Sibley Road, Freedom, ME 4941Plant Summary Information
Beaver Ridge Wind is ranked #19 out of 20 wind farms in Maine in terms of total annual net electricity generation.
Beaver Ridge Wind generated 2.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Beaver Ridge Wind |
---|---|
Utility Name | CPV Beaver Ridge Wind LLC |
Location | Waldo County, ME |
Initial Operation Date | November 2008 |
Last Update | Dec 2023 |
Annual Generation | 10.3 GWh |
Annual Consumption | 39.7 k MMBtu |
Ranked #5,859 out of 11,852 Power Plants Nationwide | |
Ranked #1,116 out of 1,345 Wind Power Plants Nationwide | |
Ranked #82 out of 161 Maine Power Plants | |
Ranked #19 out of 20 Maine Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Beaver Ridge Wind LLC (2013 to 2022) CPV Beaver Ridge Wind LLC (2023 to 2023) |
Map of Beaver Ridge Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Beaver Ridge Wind.
Monthly Net Generation for Beaver Ridge Wind
Beaver Ridge Wind Details
Summary Information | |
---|---|
Plant Name | Beaver Ridge Wind (57130) |
Plant Address | End of Sibley Road, Freedom, ME 4941 |
Utility | CPV Beaver Ridge Wind LLC (56439) |
Latitude, Longitude | 44.4967, -69.35 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | November 2008 |
Annual Generation | 10.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-879-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Central Maine Power Co (3266) ME |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BR1 Details Operating November 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 3 |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 3 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Beaver Ridge Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1106 | Leonardo Wind 1 LLC | Alden, IA | 11.2 GWh |
#1107 | LafargeHolcim - Paulding Wind Project | Paulding, OH | 11.2 GWh |
#1108 | Ralls Wind Farm | Ralls, TX | 11.0 GWh |
#1109 | Medicine Bow | Medicine Bow, WY | 10.9 GWh |
#1110 | Madison Windpower LLC | Madison, NY | 10.8 GWh |
#1111 | Edom Hills Project 1 LLC | Cathedral City, CA | 10.8 GWh |
#1112 | Lincoln Heights II | Lake Benton, MN | 10.6 GWh |
#1113 | Porterhouse Wind (4) LLC | Gruver, TX | 10.5 GWh |
#1114 | Zephyr Wind Project - 2.0 | Findlay, OH | 10.4 GWh |
#1115 | RoxWind | Roxbury, ME | 10.4 GWh |
#1117 | Whirlpool Corp-Greenville Wind Farm | Greenville, OH | 10.3 GWh |
#1118 | Butter Creek Power LLC | Echo, OR | 10.2 GWh |
#1119 | Optimum Wind 7 LLC | Nevada, IA | 10.1 GWh |
#1120 | Zephyr Wind | Findlay, OH | 10.1 GWh |
#1121 | Cashton Greens Wind Farm | Cashton, WI | 10.0 GWh |
#1122 | Wind Colebrook South | Colebrook, CT | 10.0 GWh |
#1123 | Prescott Wind Farm | Prescott, IA | 10.0 GWh |
#1124 | Cuming County Renewables, LLC | Wisner, NE | 10.0 GWh |
#1125 | South Louisburg Solar | Louisburg, NC | 9.8 GWh |
#1126 | Worthington | Worthington, MN | 9.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Beaver Ridge Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Solar | Fairfiled, ME | 4.1 GWh | 14.3 mi |
Benton Falls Associates | Benton, ME | 17.3 GWh | 11.6 mi |
Cenergy - Richards (CSG) | Fairfield, ME | 220.0 MWh | 16.2 mi |
Cenergy - Waterville (CSG) | Waterville, ME | 1.8 GWh | 16 mi |
Fairfield PV - BD Solar Fairfield LLC | Fairfield, ME | 8.2 GWh | 15.4 mi |
Georges River Energy | Searsmont, ME | 40.3 GWh | 13.5 mi |
Hydro Kennebec Project | Winslow, ME | 69.6 GWh | 14 mi |
Lockwood Hydroelectric Facility | Waterville, ME | 23.7 GWh | 14.2 mi |
Messalonskee 3 | Oakland, ME | 7.3 GWh | 17.1 mi |
Messalonskee 5 | Waterville, ME | 5.1 GWh | 15.1 mi |
Oakland | Oakland, ME | 8.0 GWh | 17.6 mi |
Pittsfield Hydro | Burnham, ME | 5.7 GWh | 15.8 mi |
Robbins Lumber | Searsmont, ME | 97.0 MWh | 13.5 mi |
Shawmut | Shawmut, ME | 36.7 GWh | 14.7 mi |
Solar Mule, LLC | Oakland, ME | 2.0 GWh | 16.4 mi |
Three Corners Solar | Unity, ME | 69.3 GWh | 9.4 mi |
Unity Solar | Unity, ME | 7.3 GWh | 7 mi |
Washington WS01 | Washington, ME | 5.5 GWh | 18.1 mi |
Webb Road Solar | Waterville, ME | 4.7 GWh | 17.3 mi |
Winslow PV - BD Solar 2 LLC | Winslow, ME | 10.9 GWh | 12.6 mi |