Bearford Farm Solar Project
4155 U.S. 117, Willard, NC 28478Plant Summary Information
Bearford Farm Solar Project is ranked #268 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Bearford Farm Solar Project generated 2.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Bearford Farm Solar Project |
---|---|
Utility Name | Strata Manager, LLC |
Location | Pender County, NC |
Initial Operation Date | March 2017 |
Last Update | Dec 2023 |
Annual Generation | 9.1 GWh |
Annual Consumption | 32.5 k MMBtu |
Ranked #6,176 out of 11,852 Power Plants Nationwide | |
Ranked #1,724 out of 5,655 Solar Power Plants Nationwide | |
Ranked #342 out of 863 North Carolina Power Plants | |
Ranked #268 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Bearford Farm, LLC (2014 to 2020) Strata Manager, LLC (2021 to 2023) |
Map of Bearford Farm Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bearford Farm Solar Project.
Monthly Net Generation for Bearford Farm Solar Project
Bearford Farm Solar Project Details
Summary Information | |
---|---|
Plant Name | Bearford Farm Solar Project (59567) |
Plant Address | 4155 U.S. 117, Willard, NC 28478 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 34.61, -77.92417 |
Generation Dates on File | Mar 2017 to Dec 2023 |
Initial Operation Date | March 2017 |
Annual Generation | 9.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-54-346 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 190 |
Tilt Angle | 20 |
DC Net Capacity | 6.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bearford Farm Solar Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Bearford Farm, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1714 | Scenic Hill Solar III | Clarksville, AR | 9.1 GWh |
#1715 | Creech Solar 2, LLC | Garner, NC | 9.1 GWh |
#1716 | Woodland Solar | Woodland, NC | 9.1 GWh |
#1717 | Walcott Solar CSG | Faribault, MN | 9.1 GWh |
#1718 | Long Farm 46 Solar, LLC | Garysburg, NC | 9.1 GWh |
#1719 | Owen Solar | Lincolnton, NC | 9.1 GWh |
#1720 | Richmond CSG | Richmond, MN | 9.1 GWh |
#1721 | Bordentown Solar | Burlington, NJ | 9.1 GWh |
#1722 | Route 19 #2 Community Solar Farm | Pike, NY | 9.1 GWh |
#1723 | Roxboro Farm | Roxboro, NC | 9.1 GWh |
#1725 | GKS Solar | Belvidere, NC | 9.1 GWh |
#1726 | Soluga Farms III | Godwin, NC | 9.1 GWh |
#1727 | Wright Kirby 1-5 CSG | Monticello, MN | 9.1 GWh |
#1728 | Statesville Solar | Cleveland, NC | 9.1 GWh |
#1729 | Warrenton I Solar | Warrenton, NC | 9.1 GWh |
#1730 | Mariposa Solar Center LLC | Stanley, NC | 9.1 GWh |
#1731 | Yanceyville Farm 2 LLC | Blanch, NC | 9.1 GWh |
#1732 | Johnson Solar CSG | Edgerton, MN | 9.1 GWh |
#1733 | Carter PV1 | Fayetteville, NC | 9.1 GWh |
#1734 | RE Ajo 1 LLC | Ajo, AZ | 9.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bearford Farm Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aspen Solar, LLC | Rose Hill, NC | 9.2 GWh | 13.5 mi |
Bearford Solar II | Burgaw, NC | 8.4 GWh | 0.3 mi |
Brick City Solar | Wallace, NC | 9.0 GWh | 8.7 mi |
Burgaw Solar, LLC | Burgaw, NC | 7.9 GWh | 5.2 mi |
Buttercup Solar, LLC | Rose Hill, NC | 10.9 GWh | 15 mi |
Crooked Run | Willard, NC | 139.3 GWh | 5.5 mi |
Hall Solar Energy Storage | Teachey, NC | 3.5 GWh | 13.1 mi |
Hickory | Rose Hill, NC | 10.4 GWh | 14.1 mi |
Innovative Solar 67 | Willard, NC | 66.7 GWh | 4.7 mi |
Lanier Solar | Beulaville, NC | 9.0 GWh | 21 mi |
Ludie Brown Solar Energy Storage | Chinquapin, NC | 3.5 GWh | 17.6 mi |
Nickelson Solar 2 | Wallace, NC | 8.2 GWh | 10.1 mi |
Nickelson Solar, LLC | Wallace, NC | 10.0 GWh | 10.1 mi |
Quarter Horse Solar | Hampstead, NC | 9.4 GWh | 20 mi |
Richlands Solar, LLC | Richlands, NC | 3.4 GWh | 20.2 mi |
Rose Hill | Rose Hill, NC | 3.0 GWh | 15 mi |
Scotch Bonnet Solar, LLC | St Helena, NC | 6.3 GWh | 5 mi |
South Cary WRF Solar Array | Apex, NC | 1.3 GWh | 15 mi |
Wallace | Wallace, NC | 3.1 GWh | 10.6 mi |
Willard Solar | Willard, NC | 8.7 GWh | 6.9 mi |