Bayonne Energy Center
401 Hook Rd, Bayonne, NJ 7002Plant Summary Information
Bayonne Energy Center is ranked #12 out of 378 power plants in New Jersey in terms of total annual net electricity generation.
Bayonne Energy Center is comprised of 10 generators and generated 214.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Bayonne Energy Center |
---|---|
Utility Name | Bayonne Energy Center LLC |
Location | Hudson County, NJ |
Initial Operation Date | June 2012 |
Last Update | Aug 2024 |
Annual Generation | 540.0 GWh |
Annual Consumption | 6.4 M MMBtu |
Ranked #1,212 out of 11,835 Power Plants Nationwide | |
Ranked #548 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #12 out of 378 New Jersey Power Plants | |
Ranked #10 out of 55 New Jersey Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of Bayonne Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bayonne Energy Center.
Monthly Net Generation for Bayonne Energy Center
Bayonne Energy Center Details
Summary Information | |
---|---|
Plant Name | Bayonne Energy Center (56964) |
Plant Address | 401 Hook Rd, Bayonne, NJ 7002 |
Utility | Bayonne Energy Center LLC (56267) |
Latitude, Longitude | 40.65283, -74.09155 |
Generation Dates on File | Jun 2012 to Aug 2024 |
Initial Operation Date | June 2012 |
Annual Generation | 540.0 GWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | ER11-3460-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
TRANSCONTINENTAL GAS PIPELINE TEXAS EASTERN TRANSMISSION LP |
Natural Gas Storage | No |
Generator GT1 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323682 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 61.9 MW |
Winter Capacity | 62.6 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 58.9 MW |
Net Winter Capacity With Natural Gas | 62.1 MW |
Net Summer Capacity With Oil | 57.5 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT2 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323683 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 57.5 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 58.5 MW |
Net Winter Capacity With Natural Gas | 61.5 MW |
Net Summer Capacity With Oil | 57.9 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT3 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323684 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 58 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 59.4 MW |
Net Winter Capacity With Natural Gas | 61.8 MW |
Net Summer Capacity With Oil | 58 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT4 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323685 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 61.1 MW |
Winter Capacity | 62.8 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 61.7 MW |
Net Winter Capacity With Natural Gas | 61.7 MW |
Net Summer Capacity With Oil | 56.5 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323686 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 58.5 MW |
Winter Capacity | 62.4 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 58.9 MW |
Net Winter Capacity With Natural Gas | 62.1 MW |
Net Summer Capacity With Oil | 56.5 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323687 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 59 MW |
Winter Capacity | 62.9 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 59.2 MW |
Net Winter Capacity With Natural Gas | 62.1 MW |
Net Summer Capacity With Oil | 57.7 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT7 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323688 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 59.6 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 60 MW |
Net Winter Capacity With Natural Gas | 62.9 MW |
Net Summer Capacity With Oil | 58 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT8 Details Operating June 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323689 |
Nameplate Capacity | 64 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 60 MW |
Winter Capacity | 63 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 60.6 MW |
Net Winter Capacity With Natural Gas | 63.1 MW |
Net Summer Capacity With Oil | 58 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT10 Details Operating May 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323750 |
Nameplate Capacity | 66 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 61.4 MW |
Winter Capacity | 64.9 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 61 MW |
Net Winter Capacity With Natural Gas | 64.5 MW |
Net Summer Capacity With Oil | 58 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT9 Details Operating May 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323749 |
Nameplate Capacity | 66 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 61.3 MW |
Winter Capacity | 65 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 61.9 MW |
Net Winter Capacity With Natural Gas | 65.4 MW |
Net Summer Capacity With Oil | 58 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Bayonne Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#538 | Hawk Road Facility | Franklin, GA | 569.4 GWh |
#539 | Vermillion Energy Facility | Cayuga, IN | 568.9 GWh |
#540 | Evander Andrews Power Complex | Mountain Home, ID | 566.7 GWh |
#541 | Shell Chemical | Geismar, LA | 560.4 GWh |
#542 | Darby Power, LLC | Mt Sterling, OH | 557.3 GWh |
#543 | Rio Bravo | Albuquerque, NM | 552.3 GWh |
#544 | Greenland Energy Center | Jacksonville, FL | 550.6 GWh |
#545 | Union Carbide Seadrift Cogen | Seadrift, TX | 574.6 GWh |
#546 | Sheboygan Falls | Sheboygan, WI | 546.5 GWh |
#547 | Brandywine Power Facility | Brandywine, MD | 548.5 GWh |
#549 | Lansing BWL REO Town Plant | Lansing, MI | 539.2 GWh |
#550 | Shute Creek Facility | Kemmerer, WY | 903.5 GWh |
#551 | R D Green | Robards, KY | 534.7 GWh |
#552 | Wabash Valley Power IGCC | Terre Haute, IN | 532.3 GWh |
#553 | JCO Oxides Olefins Plant | Port Neeches, TX | 531.3 GWh |
#554 | Blue Spruce Energy Center | Aurora, CO | 537.1 GWh |
#555 | Talbot County Energy | Box Springs, GA | 521.8 GWh |
#556 | Kennedy International Airport Cogen | Jamaica, NY | 521.7 GWh |
#557 | SABIC Innovative Plastics Mt. Vernon | Mount Vernon, IN | 516.4 GWh |
#558 | Indeck Corinth Energy Center | Corinth, NY | 514.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bayonne Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allied Beverages Elizabeth | Elizabeth, NJ | 5.4 GWh | 4.5 mi |
Amazon JFK8 Solar Project | Staten Island, NY | 460.0 MWh | 5.6 mi |
Bay Avenue CDG | Elizabeth, NJ | 56.0 MWh | 4.3 mi |
Elizabeth Seaport Bldg A Solar | Elizabeth, NJ | 2.0 GWh | 4 mi |
Essex County Correctional Facility Cogen | Newark, NJ | 22.5 GWh | 5 mi |
Gowanus Gas Turbines Generating | Brooklyn, NY | 11.3 GWh | 4.6 mi |
Hudson County Solar | Kearny, NJ | 2.0 GWh | 5.2 mi |
Jersey City DWP | Jersey City, NJ | 1.2 GWh | 2.6 mi |
Jersey Gardens Phase 1 | Elizabeth, NJ | 1.9 GWh | 4.3 mi |
Jersey Gardens Phase 2 | Elizabeth, NJ | 2.3 GWh | 4.3 mi |
Joseph J Seymour Power Project | Brooklyn, NY | 52.5 GWh | 4.9 mi |
Maimonides Medical Center | Brooklyn, NY | 31.0 MWh | 4.9 mi |
Narrows Gas Turbines Generating | Brooklyn, NY | 31.4 GWh | 3.7 mi |
Newark Energy Center | Newark, NJ | 3.5 TWh | 4.2 mi |
NYU Luthern Medical Center | New York City, NY | 105.0 MWh | 3.7 mi |
Port Richmond WWT Solar | Staten Island, NY | 1.5 GWh | 2.1 mi |
Pouch | Staten Island, NY | 42.1 GWh | 2.7 mi |
River Terminal Development Solar | Kearny, NJ | 3.4 GWh | 5.3 mi |
Royal Wine Corp Solar Power Plant | Bayonne, NJ | 2.6 GWh | 0.9 mi |
WEA Texas Bayonne | Bayonne, NJ | 2.1 GWh | 1.7 mi |