Bay View Backup Power Facility
3900 N Summit Street, Bldg #1, Toledo, OH 43611Plant Summary Information
Bay View Backup Power Facility is ranked #36 out of 55 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
Bay View Backup Power Facility is comprised of 6 generators and generated 34.8 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Bay View Backup Power Facility |
---|---|
Utility Name | COT/Division of Water Reclamation |
Location | Lucas County, OH |
Initial Operation Date | January 2007 |
Last Update | Dec 2022 |
Annual Generation | 162.3 MWh |
Annual Consumption | 352 MMBtu |
Ranked #10,816 out of 11,249 Power Plants Nationwide | |
Ranked #793 out of 1,267 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #154 out of 170 Ohio Power Plants | |
Ranked #36 out of 55 Ohio Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil : 97.0% Natural Gas : 3.0% |
Map of Bay View Backup Power Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bay View Backup Power Facility.
Monthly Net Generation for Bay View Backup Power Facility
Bay View Backup Power Facility Details
Summary Information | |
---|---|
Plant Name | Bay View Backup Power Facility (58269) |
Plant Address | 3900 N Summit Street, Bldg #1 Toledo, OH 43611 |
Utility | COT/Division of Water Reclamation (58240) |
Latitude, Longitude | 41.68833, -83.48472 |
Generation Dates on File | Jan 2012 to Dec 2022 |
Initial Operation Date | January 2007 |
Annual Generation | 162.3 MWh |
Fuel Types | Distillate Fuel Oil : 97.0% Natural Gas : 3.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | City Water |
Ash Impoundment | No |
Transmission / Distribution Owner | The Toledo Edison Co (18997) OH |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | COLUMBIA GAS OF OHIO |
Natural Gas Storage | No |
Generator G1 Details Standby January 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator G2 Details Standby January 2007
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator G3 Details Standby January 2007
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator G4 Details Standby January 2007
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator G5 Details Standby January 2007
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Other Biomass Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator G6 Details Standby January 2007
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Other Biomass Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Bay View Backup Power Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#783 | Albemarle Prime Power Park | New London, NC | 162.9 MWh |
#784 | Seward (AK) | Seward, AK | 162.3 MWh |
#785 | Essex Junction 19 | Essex Junction, VT | 55.6 GWh |
#786 | Tom G Smith | Lake Worth, FL | 1.5 GWh |
#787 | Richland | Defiance, OH | 300.2 GWh |
#788 | Burlington (KS) | Burlington, KS | 169.1 MWh |
#789 | Glencoe | Glencoe, MN | 161.0 MWh |
#790 | Fairmont (MN) | Fairmont, MN | 12.4 GWh |
#791 | Crystal Mountain | Greenwater, WA | 158.0 MWh |
#792 | Brunner Island | York Haven, PA | 3.0 TWh |
#794 | Fernandina Plant | Fernandina Beach, FL | 244.2 GWh |
#795 | Tulsa | Tulsa, OK | 262.0 GWh |
#796 | Monterey Diesel Generation Facility | Monterey, VA | 154.0 MWh |
#797 | NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 66.0 GWh |
#798 | Red Bud | Red Bud, IL | 153.4 MWh |
#799 | Elk Mound | Elk Mound, WI | 39.3 GWh |
#800 | Waterloo Lundquist | Waterloo, IA | 151.7 MWh |
#801 | Seldovia | Seldovia, AK | 151.6 MWh |
#802 | Works 4 | Wichita Falls, TX | 150.2 MWh |
#803 | Woodhull Hospital | Brooklyn, NY | 150.2 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bay View Backup Power Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adrian Energy Associates LLC | Adrian, MI | 10.7 GWh | 29.7 mi |
Anthony Wayne Solar #1 | Toledo, OH | 1.7 GWh | 6.3 mi |
Bowling Green Generating Station | Bowling Green, OH | 1.7 GWh | 21.7 mi |
Bowling Green Wind | Bowling Green, OH | 5.9 GWh | 25.1 mi |
Davis Besse | Oak Harbor, OH | 8.1 TWh | 21.5 mi |
DG AMP Solar Bowling Green | Bowling Green, OH | 41.8 GWh | 20.8 mi |
Fermi | Frenchtown Twp, MI | 9.6 TWh | 22.3 mi |
FirstEnergy Bay Shore | Oregon, OH | 995.5 GWh | 2.4 mi |
Fremont Energy Center | Fremont, OH | 3.8 TWh | 27.2 mi |
Genoa Diesel Generating Station | Genoa, OH | 146.3 MWh | 13.9 mi |
Hendershot Solar, LLC | Tecumseh, MI | 4.2 GWh | 29.1 mi |
Monroe (MI) | Monroe, MI | 11.9 TWh | 15.7 mi |
Oregon Clean Energy Center | Oregon, OH | 7.1 TWh | 2.5 mi |
Owens Corning Headquarters | Toledo, OH | 1.6 GWh | 4 mi |
PNA Rossford Solar Array | Rossford, OH | 1.3 GWh | 6.3 mi |
Sumpter Energy Associates | Belleville, MI | 70.4 GWh | 28.8 mi |
Temperance Solar, LLC | Erie, MI | 42.1 GWh | 4.9 mi |
Toledo Ref Power Recovery Train | Oregon, OH | 1.4 GWh | 4 mi |
Troy Energy LLC | Luckey, OH | 1.1 TWh | 14.6 mi |
Woodville RTO BTM | Woodville, OH | 29.0 MWh | 17 mi |