Bavarian LFGTE
12760 McCoy Fork Road, Walton, KY 41094Plant Summary Information
Bavarian LFGTE is ranked #31 out of 49 power plants in Kentucky in terms of total annual net electricity generation.
Bavarian LFGTE is comprised of 5 generators and generated 9.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Bavarian LFGTE |
---|---|
Utility Name | East Kentucky Power Coop, Inc |
Location | Boone County, KY |
Initial Operation Date | September 2003 |
Last Update | Dec 2022 |
Annual Generation | 33.0 GWh |
Annual Consumption | 402.3 k MMBtu |
Ranked #4,312 out of 11,249 Power Plants Nationwide | |
Ranked #95 out of 297 Landfill Gas Power Plants Nationwide | |
Ranked #31 out of 49 Kentucky Power Plants | |
Ranked #1 out of 9 Kentucky Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Bavarian LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bavarian LFGTE.
Monthly Net Generation for Bavarian LFGTE
Bavarian LFGTE Details
Summary Information | |
---|---|
Plant Name | Bavarian LFGTE (56277) |
Plant Address | 12760 McCoy Fork Road Walton, KY 41094 |
Utility | East Kentucky Power Coop, Inc (5580) |
Latitude, Longitude | 38.8608, -84.6556 |
Generation Dates on File | Jan 2004 to Dec 2022 |
Initial Operation Date | September 2003 |
Annual Generation | 33.0 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | East Kentucky Power Coop, Inc (5580) |
Grid Voltage | 14.40 kV |
Energy Storage | No |
Generator 1 Details Operating September 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating September 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating September 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating September 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating October 2016
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Bavarian LFGTE Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#85 | Sarasota County LFGTE Facility | Nokomis, FL | 35.7 GWh |
#86 | Springhill Gas Recovery Plant | Campbellton, FL | 35.6 GWh |
#87 | Trail Ridge Landfill Gas Recovery | Baldwin, FL | 35.2 GWh |
#88 | Altamont Gas Recovery | Livermore, CA | 35.1 GWh |
#89 | Ameresco Vasco Road | Livermore, CA | 34.4 GWh |
#90 | LRI LFGTE Facility | Graham, WA | 34.1 GWh |
#91 | Suburban Landfill Gas Recovery | Glenford, OH | 33.9 GWh |
#92 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 33.6 GWh |
#93 | Lennon Generating | Lennon, MI | 33.3 GWh |
#94 | Ameresco Delaware Central | Sandtown, DE | 33.3 GWh |
#96 | Sand Valley Power Station | Collinsville, AL | 32.5 GWh |
#97 | Brevard | Cocoa, FL | 32.2 GWh |
#98 | Model City Energy Facility | Youngstown, NY | 32.1 GWh |
#99 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 32.0 GWh |
#100 | Ameresco Forward | Manteca, CA | 31.5 GWh |
#101 | Austin Gas Recovery | Austin, TX | 31.2 GWh |
#102 | BMW Manufacturing Co | Greer, SC | 34.4 GWh |
#103 | Ameresco Delaware South | Georgetown, DE | 30.9 GWh |
#104 | Riverbend Landfill | McMinnville, OR | 29.4 GWh |
#105 | Mountain View | Greencastle, PA | 31.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bavarian LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brown County LFGTE Power Station | Georgetown, OH | 27.2 GWh | 40.5 mi |
Central Utility Plant Cincinnati | Cincinnati, OH | 250.3 GWh | 20.5 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.7 GWh | 7.9 mi |
East Bend | Union, KY | 2.7 TWh | 10.9 mi |
East Campus Utility Plant | Cincinnati, OH | 276.4 MWh | 20.8 mi |
Ghent | Ghent, KY | 10.7 TWh | 21.8 mi |
Green City Recovery, LLC | Georgetown, KY | 1.3 GWh | 36.1 mi |
Hamilton (OH) | Hamilton, OH | 812.2 MWh | 38.3 mi |
Hamilton Hydro | HAMILTON, OH | 6.7 GWh | 38.5 mi |
L'Oreal Solar - Florence | Florence, KY | 2.8 GWh | 9.1 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 9.4 TWh | 19.5 mi |
Markland | Florence, IN | 312.9 GWh | 17.5 mi |
Meldahl Hydroelectric Project | Foster, KY | 622.1 GWh | 26.4 mi |
Miami Fort | North Bend, OH | 3.3 TWh | 19.1 mi |
Nestlewood Solar | Hamersville, OH | 30.2 GWh | 34.6 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 20.9 mi |
Pendleton County LFGTE | Butler, KY | 22.1 GWh | 16 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 2.4 GWh | 23.2 mi |
Walton 1 Solar Facility | Walton, KY | 3.2 GWh | 3.5 mi |
Walton 2 Solar Facility | Walton, KY | 3.3 GWh | 3.5 mi |