Battle Mountain Solar Project

31400 Blue Flax Road, Battle Mountain, NV 89820

Plant Summary Information

Battle Mountain Solar Project is ranked #35 out of 109 power plants in Nevada in terms of total annual net electricity generation.

Battle Mountain Solar Project generated 95.4 GWh during the 3-month period between June 2024 to September 2024.

Plant NameBattle Mountain Solar Project
Utility NameConsolidated Edison Development Inc.
LocationHumboldt County, NV
Initial Operation DateMay 2021
Last Update Sep 2024
Annual Generation 276.4 GWh
Annual Consumption 1.0 M MMBtu
Ranked #1,931 out of 11,852 Power Plants Nationwide
Ranked #184 out of 5,655 Solar Power Plants Nationwide
Ranked #35 out of 109 Nevada Power Plants
Ranked #14 out of 60 Nevada Solar Power Plants
Fuel Types Solar
Previous Operators Battle Mountain SP, LLC (2016 to 2017)
Cypress Creek Renewables (2018 to 2018)
Consolidated Edison Development Inc. (2019 to 2023)

Map of Battle Mountain Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Battle Mountain Solar Project.

Create Your Account Today

Monthly Net Generation for Battle Mountain Solar Project

Battle Mountain Solar Project Details

Summary Information
Plant NameBattle Mountain Solar Project (61098)
Plant Address31400 Blue Flax Road, Battle Mountain, NV 89820
UtilityConsolidated Edison Development Inc. (56769)
Latitude, Longitude40.71843, -117.06143
Generation Dates on FileMay 2021 to Sep 2024
Initial Operation DateMay 2021
Annual Generation 276.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityNevada Power Company (NEVP)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSierra Pacific Power Co (17166) NV
Grid Voltage 120.00 kV
Energy StorageYes

Generator BMSP Details Operating May 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity101 MW
Summer Capacity101 MW
Winter Capacity101 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle358
DC Net Capacity122.9 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator BMBS Details Operating June 2021

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity25 MW
Summer Capacity25 MW
Winter Capacity25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH25
Maximum Charge Rate25 MW
Maximum Discharge Rate25 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.8
Storage Enclosure TypeCS
Load ManagementP
Voltage Or Reactive Power SupportYes
Backup PowerYes
Excess Wind And Solar GenerationYes
IndependentYes
Direct Support Of Another UnitNo
Support T D AssetNo

Battle Mountain Solar Project Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#174Arlington Energy Center IIIBlythe, CA266.5 GWh
#175Hardin Solar Energy LLCAlger, OH287.0 GWh
#176Upton County SolarMcCamey, TX285.5 GWh
#177Elm Branch Solar 1Bardwell, TX285.2 GWh
#178Valentine Solar, LLCRosamond, CA283.2 GWh
#179Mesquite Solar 2, LLCTonopah, AZ282.9 GWh
#180Samson Solar Energy III LLCCunningham, TX280.3 GWh
#181BPL Files SolarItasca, TX280.1 GWh
#182Colonial Trail WestSpring Grove, VA279.9 GWh
#183Storey Solar and StorageCoolidge, AZ268.9 GWh
#185Emerald GroveCrane, TX278.1 GWh
#186East Blackland Solar Project 1Manor, TX277.6 GWh
#187Imperial Solar Energy Center SouthCalexico, CA277.2 GWh
#188Wood CountyNekoosa, WI271.6 GWh
#189Boulder Solar Power, LLCBoulder City, NV271.6 GWh
#190Oberon IAOdessa, TX271.4 GWh
#191Hunter Solar LLC (UT)Clawson, UT270.1 GWh
#192Maverick Solar 6, LLCDesert Center, CA265.8 GWh
#193Ivanpah 3Nipton, CA278.0 GWh
#194West Line Solar, LLCCity of Eloy, AZ268.1 GWh

Nearby Power Plants

Below are closest 19 power plants surrounding Battle Mountain Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
BeowaweBeowawe, NV97.4 GWh25.9 mi
BradyFallon, NV95.0 GWh120.9 mi
Desert Peak Power PlantFernley, NV91.9 GWh120 mi
Dixie ValleyFallon, NV406.2 GWh66.7 mi
Don A Campbell 1 GeothermalGabbs, NV118.8 GWh146.3 mi
Don A Campbell 2 GeothermalLuning, NV99.5 GWh146.4 mi
EGP Stillwater Solar PV II, LLCFallon, NV32.4 GWh113.5 mi
ENEL Salt Wells LLCFallon, NV73.2 GWh126.8 mi
Jersey Valley Geothermal Power PlantImlay, NV66.7 GWh43 mi
McGinness HillsAustin, NV642.5 GWh78.3 mi
McGinness Hills 3Austin, NV530.9 GWh78 mi
NGP Blue Mountain I LLCWinnemucca, NV193.9 GWh59.6 mi
North ValmyValmy, NV1.2 TWh12.2 mi
Soda Lake 3Fallon, NV110.8 GWh124.1 mi
Star Peak Geothermal PlantImlay, NV51.8 GWh64.8 mi
Stillwater FacilityFallon, NV123.7 GWh113 mi
TS Power PlantBattle Mountain, NV1.4 TWh27.9 mi
Tungsten MountainFallon, NV349.2 GWh79.9 mi
Tuscarora Geothermal Power PlantTuscarora, NV125.8 GWh71 mi