Batesville Generation Facility
200 Industrial Drive, Batesville, MS 38606Plant Summary Information
Batesville Generation Facility is ranked #6 out of 54 power plants in Mississippi in terms of total annual net electricity generation.
Batesville Generation Facility is comprised of 6 generators and generated 1.4 TWh during the 3-month period between September 2024 to December 2024.
Plant Name | Batesville Generation Facility |
---|---|
Utility Name | Cooperative Energy |
Location | Panola County, MS |
Initial Operation Date | August 2000 |
Last Update | Dec 2024 |
Annual Generation | 4.9 TWh |
Annual Consumption | 39.4 M MMBtu |
Ranked #224 out of 11,949 Power Plants Nationwide | |
Ranked #113 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 54 Mississippi Power Plants | |
Ranked #5 out of 31 Mississippi Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
South Mississippi El Pwr Assn (2013 to 2015) Cooperative Energy (2016 to 2023) |
Map of Batesville Generation Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Batesville Generation Facility.
Monthly Net Generation for Batesville Generation Facility
Batesville Generation Facility Details
Summary Information | |
---|---|
Plant Name | Batesville Generation Facility (55063) |
Plant Address | 200 Industrial Drive, Batesville, MS 38606 |
Utility | Cooperative Energy (17568) |
Latitude, Longitude | 34.3356, -89.9275 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | August 2000 |
Annual Generation | 4.9 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 98-59-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Enid Lake |
Ash Impoundment | No |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
TENNESSEE GAS PIPELINE COMPANY TRUNKLINE GAS COMPANY ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator CTG1 Details Operating August 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | SME.BATESV_1 |
Nameplate Capacity | 184.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 176 MW |
Winter Capacity | 184.5 MW |
Minimum Load | 115 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CTG2 Details Operating August 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | SME.BATESV_2 |
Nameplate Capacity | 184.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 176 MW |
Winter Capacity | 184.5 MW |
Minimum Load | 115 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CTG3 Details Operating August 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | SME.BATESV_3 |
Nameplate Capacity | 184.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 176 MW |
Winter Capacity | 184.5 MW |
Minimum Load | 115 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG1 Details Operating August 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | SME.BATESV_1 |
Nameplate Capacity | 112.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Minimum Load | 40 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG2 Details Operating August 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC2 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | SME.BATESV_2 |
Nameplate Capacity | 112.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Minimum Load | 40 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG3 Details Operating August 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC3 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | SME.BATESV_3 |
Nameplate Capacity | 112.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Minimum Load | 40 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Batesville Generation Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#103 | Tenaska Virginia Generating Station | Scottsville, VA | 5.1 TWh |
#104 | Hill Top Energy Center, LLC | Carmichaels, PA | 5.1 TWh |
#105 | Baytown Energy Center | Baytown, TX | 5.1 TWh |
#106 | H L Culbreath Bayside Power Station | Tampa, FL | 5.1 TWh |
#107 | Rio Nogales Power Project | Seguin, TX | 5.0 TWh |
#108 | CPV Valley Energy Center | Wawayanda, NY | 5.0 TWh |
#109 | E B Harris Electric Generating Plant | Autaugaville, AL | 5.0 TWh |
#110 | West Riverside Energy Center | Beloit, WI | 5.0 TWh |
#111 | Pasadena Cogeneration | Pasadena, TX | 4.9 TWh |
#112 | Keys Energy Center | Brandywine, MD | 4.9 TWh |
#114 | Ouachita | Sterlington, LA | 4.9 TWh |
#115 | Taft Cogeneration Facility | Hahnville, LA | 4.9 TWh |
#116 | Potomac Energy Center, LLC | Leesburg, VA | 4.8 TWh |
#117 | Plaquemine Cogeneration Plant | Plaquemine, LA | 4.8 TWh |
#118 | PSEG Linden Generating Station | Linden, NJ | 4.8 TWh |
#119 | Dearborn Industrial Generation | Dearborn, MI | 5.7 TWh |
#120 | Kendall County Generation Facility | Minooka, IL | 4.6 TWh |
#121 | Dan River | Eden, NC | 4.6 TWh |
#122 | TVA Southaven Combined Cycle | Southaven, MS | 4.6 TWh |
#123 | Jasper | Hardeeville, SC | 4.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Batesville Generation Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allen | Memphis, TN | 6.4 TWh | 52.5 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 37.7 mi |
Delta Wind Farm (MS) | Dundee, MS | 346.7 GWh | 28.1 mi |
Delta's Edge Solar | Greenwood, MS | 207.4 GWh | 58.6 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh | 69.7 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 66.9 mi |
Harvest Gold Solar | Indianola, MS | 85.0 GWh | 70.3 mi |
IKEA Memphis 508 | Cordova, TN | 856.0 MWh | 59.5 mi |
L L Wilkins | Clarksdale, MS | 90.0 MWh | 37.7 mi |
Magnolia Power Plant | Ashland, MS | 6.7 TWh | 53.8 mi |
Prairie Bluff | Houston, MS | 7.8 GWh | 59.6 mi |
Somerville Solar | Somerville, TN | 3.2 GWh | 69.6 mi |
Sr Byhalia, LLC | Byhalia, MS | 670.0 MWh | 39.2 mi |
SR Houston | Houston, MS | 2.3 GWh | 60.2 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.5 GWh | 66.7 mi |
Sunflower County | Ruleville, MS | 107.1 GWh | 53 mi |
TVA Southaven Combined Cycle | Southaven, MS | 4.6 TWh | 45.9 mi |
West Memphis Solar, LLC | Crawfordsville, AR | 14.9 GWh | 60.8 mi |
Wildberry | Moscow, TN | 18.9 GWh | 59.2 mi |
Wildflower Solar, LLC (MS) | DeSoto, MS | 122.7 GWh | 45.7 mi |