Barre II Solar Project
Britton Road West, Barre, MA 1005Plant Summary Information
Barre II Solar Project is ranked #336 out of 463 solar farms in Massachusetts in terms of total annual net electricity generation.
Barre II Solar Project generated 612.6 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Barre II Solar Project |
---|---|
Utility Name | Kearsarge Solar LLC |
Location | Worcester County, MA |
Initial Operation Date | April 2014 |
Last Update | Dec 2022 |
Annual Generation | 2.5 GWh |
Annual Consumption | 9.0 k MMBtu |
Ranked #9,105 out of 11,249 Power Plants Nationwide | |
Ranked #3,952 out of 5,158 Solar Power Plants Nationwide | |
Ranked #427 out of 573 Massachusetts Power Plants | |
Ranked #336 out of 463 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Barre II Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Barre II Solar Project.
Monthly Net Generation for Barre II Solar Project
Barre II Solar Project Details
Summary Information | |
---|---|
Plant Name | Barre II Solar Project (59766) |
Plant Address | Britton Road West Barre, MA 1005 |
Utility | Kearsarge Solar LLC (59232) |
Latitude, Longitude | 42.362, -72.109 |
Generation Dates on File | Apr 2014 to Dec 2022 |
Initial Operation Date | April 2014 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-398-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 15.00 kV |
Energy Storage | No |
Generator BII Details Operating April 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.9 MW |
Barre II Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3942 | FELPS 2 - Calaveras | Floresville, TX | 2.5 GWh |
#3943 | Sierra Nevada Brewing Co Hybrid | Chico, CA | 9.5 GWh |
#3944 | Donaghy-Stockton | Stockton, CA | 2.5 GWh |
#3945 | 126 Grove Solar LLC | Franklin, MA | 2.5 GWh |
#3946 | Skidmore College | Saratoga Springs, NY | 2.5 GWh |
#3947 | FELPS 1 - Calaveras | Floresville, TX | 2.5 GWh |
#3948 | Fremont - Kato Rd | Fremont, CA | 2.5 GWh |
#3949 | FedEx Woodbridge | Keasbey, NJ | 2.5 GWh |
#3950 | Montgomery County Correctional Facility | Boyds, MD | 2.5 GWh |
#3951 | PSEG Hackettstown | Hackettstown, NJ | 2.5 GWh |
#3953 | 601 Doremus CDG | Newark, NJ | 2.5 GWh |
#3954 | Kearsarge Oppenheim CSG | St. Johnsville, NY | 2.5 GWh |
#3955 | 232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.5 GWh |
#3956 | Rockdale | Williamsport, MD | 2.5 GWh |
#3957 | Shuman Solar | Stoughton, MA | 2.5 GWh |
#3958 | Slidematic at Rockford | Rockford, IL | 2.5 GWh |
#3959 | Solar Photovoltaic Project #28 | San Bernardino, CA | 2.5 GWh |
#3960 | Wonderful Nursery | Wasco, CA | 2.5 GWh |
#3961 | Spruce - WCMD - Creek | Hagerstown, MD | 2.5 GWh |
#3962 | Whiskey Hill Solar | Walden, CO | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Barre II Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barre Solar III LLC | Barre, MA | 1.7 GWh | 4 mi |
Brookfield Solar 2013 LLC | North Brookfield, MA | 1.7 GWh | 7.6 mi |
BWC Lake Lashaway, LLC Hybrid | North Brookfield, MA | 9.1 GWh | 8.9 mi |
Golden Hills Solar | Rutland, MA | 8.3 GWh | 6.2 mi |
Hardwick-Athol & Eagle Hill | Hardwick, MA | 4.2 GWh | 5.5 mi |
JH Solar, LLC CSG | North Brookfield, MA | 1.7 GWh | 8.2 mi |
KS Solar Six LLC | Hubbardston, MA | 3.2 GWh | 8.2 mi |
Lane Ave Solar LLC | North Brookfield, MA | 2.4 GWh | 7 mi |
Ledeaux Solar, LLC CSG | North Brookfield, MA | 1.6 GWh | 8.4 mi |
North Brookfield | North Brookfield, MA | 4.6 GWh | 6.5 mi |
Pleasantdale Road Community Solar | Rutland, MA | 1.5 GWh | 6.8 mi |
RGS-Rutland VNM SREC II Project (MA) | Rutland, MA | 1.2 GWh | 8.2 mi |
Ryan Road Solar LLC Hybrid(CSG) | North Brookfield, MA | 4.1 GWh | 7.2 mi |
SJA Solar LLC-Solterra Monastery CSG | Spencer, MA | 75.2 GWh | 7.5 mi |
Spring Hill Road | Barre, MA | 2.7 GWh | 5.4 mi |
Stetson Road Solar - Barre I | Barre, MA | 3.1 GWh | 2.8 mi |
Upper Blackstone (MA) Treasure Valley | Rutland, MA | 7.3 GWh | 6.5 mi |
West Brookfield Solar - Gilbertsville Rd (CSG) | West Brookfield, MA | 6.9 GWh | 8.1 mi |
Williamsville Hybrid CSG | Hubbardston, MA | 8.6 GWh | 7.7 mi |
ZPD-PT Solar Project 2017-044 LLC CSG | Spencer, MA | 790.5 MWh | 7.8 mi |