Bandera Electric Coop PV
352 Walter White Ranch Road, Leakey, TX 78873Plant Summary Information
Bandera Electric Coop PV is ranked #145 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Bandera Electric Coop PV generated 444.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Bandera Electric Coop PV |
---|---|
Utility Name | SoCore Energy LLC |
Location | Real County, TX |
Initial Operation Date | February 2017 |
Last Update | Dec 2023 |
Annual Generation | 3.4 GWh |
Annual Consumption | 12.0 k MMBtu |
Ranked #8,650 out of 11,835 Power Plants Nationwide | |
Ranked #3,561 out of 5,643 Solar Power Plants Nationwide | |
Ranked #581 out of 749 Texas Power Plants | |
Ranked #145 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Bandera Electric Coop PV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bandera Electric Coop PV.
Monthly Net Generation for Bandera Electric Coop PV
Bandera Electric Coop PV Details
Summary Information | |
---|---|
Plant Name | Bandera Electric Coop PV (61205) |
Plant Address | 352 Walter White Ranch Road, Leakey, TX 78873 |
Utility | SoCore Energy LLC (60520) |
Latitude, Longitude | 29.68103, -99.76221 |
Generation Dates on File | Feb 2017 to Dec 2023 |
Initial Operation Date | February 2017 |
Annual Generation | 3.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF17-345-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 24.94 kV |
Energy Storage | No |
Generator PV1 Details Operating February 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bandera Electric Coop PV Plant Owners
Owner Name | Address | Ownership |
---|---|---|
SoCore Bandera LLC | 225 W Hubbard St., Ste #200, Chicago, IL 60654 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3551 | Kings Park Solar II | Kings Park, NY | 3.4 GWh |
#3552 | Coldwater Solar, LLC | Flint, MI | 3.4 GWh |
#3553 | Long Plain Solar | Whatley, MA | 3.4 GWh |
#3554 | Bowden Solar LLC | Monson, MA | 3.4 GWh |
#3555 | Pittman Solar One LLC | Hancock, MD | 3.4 GWh |
#3556 | FLS Solar 170, LLC | Lumberton, NC | 3.4 GWh |
#3557 | Kings Park Solar I | Kings Park, NY | 3.4 GWh |
#3558 | IGS Stockton DG CSG | Stockton, IL | 3.4 GWh |
#3559 | Kearsarge Acushnet | Acushnet, MA | 3.4 GWh |
#3560 | Frog Hollow CSG | Ellenville, NY | 3.4 GWh |
#3562 | ENGIE 2020 ProjectCo-WI1 LLC | Fond Du Lac, WI | 3.4 GWh |
#3563 | Ramapo | Mahwah, NJ | 3.4 GWh |
#3564 | Peterman II | St. Anne, IL | 3.4 GWh |
#3565 | Adams Ave MS and HS | Egg Harbor Township, NJ | 3.4 GWh |
#3566 | Sacket Lake Rd #1 Community Solar Farm | Thompson, NY | 3.4 GWh |
#3567 | BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh |
#3568 | SulusSolar25 | Aurora, OR | 3.4 GWh |
#3569 | Indian Orchard PV Facility | Springfield, MA | 3.4 GWh |
#3570 | Duke Building 87 | Indianapolis, IN | 3.4 GWh |
#3571 | Hadley Solar NG, LLC | Hadley, MA | 3.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bandera Electric Coop PV.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amistad Dam & Power | Del Rio, TX | 87.6 GWh | 79.6 mi |
Anacacho Wind Farm, LLC | Brackettville, TX | 316.4 GWh | 40.9 mi |
AP Sunray LLC | Knippa, TX | 18.1 GWh | 28.4 mi |
Commerce Solar | San Antonio, TX | 8.6 GWh | 70.9 mi |
Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh | 70.5 mi |
Eagle Pass | Eagle Pass, TX | 40.3 GWh | 75.7 mi |
Elara Solar | Pearsall, TX | 252.4 GWh | 65.4 mi |
HEB_CPS00085 | San Antonio, TX | 422.0 MWh | 65.9 mi |
Horizon Solar | Pearsall, TX | 317.8 GWh | 64.8 mi |
Lampwick | Hext, TX | 12.3 GWh | 83.4 mi |
Leon Creek | San Antonio, TX | 223.2 GWh | 74.8 mi |
Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.5 GWh | 70.6 mi |
OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh | 32.2 mi |
OCI Alamo Solar I Hybrid | San Antonio, TX | 88.3 GWh | 84.1 mi |
Pearsall | Pearsall, TX | 395.1 GWh | 65.9 mi |
Rocksprings | Del Rio, TX | 467.8 GWh | 62 mi |
SunE CPS3 LLC | Somerset, TX | 10.3 GWh | 73 mi |
WAL447 | Del Rio, TX | 309.0 MWh | 71.2 mi |
WAL461 | Eagle Pass, TX | 299.0 MWh | 80.4 mi |
Zier Solar | Brackettville, TX | 168.8 GWh | 53.2 mi |