Ballenger Road Solar A
485 Ballenger Road, Inman, SC 29349Plant Summary Information
Ballenger Road Solar A is ranked #67 out of 111 solar farms in South Carolina in terms of total annual net electricity generation.
Ballenger Road Solar A generated 891.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ballenger Road Solar A |
---|---|
Utility Name | Ballenger Road Solar A |
Location | Spartanburg County, SC |
Initial Operation Date | December 2020 |
Last Update | Dec 2023 |
Annual Generation | 4.3 GWh |
Annual Consumption | 15.3 k MMBtu |
Ranked #7,944 out of 11,835 Power Plants Nationwide | |
Ranked #2,974 out of 5,643 Solar Power Plants Nationwide | |
Ranked #125 out of 190 South Carolina Power Plants | |
Ranked #67 out of 111 South Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Renewable Properties, LLC (2019 to 2019) Ballenger Road Solar A (2020 to 2023) |
Map of Ballenger Road Solar A
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ballenger Road Solar A.
Monthly Net Generation for Ballenger Road Solar A
Ballenger Road Solar A Details
Summary Information | |
---|---|
Plant Name | Ballenger Road Solar A (63759) |
Plant Address | 485 Ballenger Road, Inman, SC 29349 |
Utility | Ballenger Road Solar A (63673) |
Latitude, Longitude | 35.04354, -82.11284 |
Generation Dates on File | Jan 2021 to Dec 2023 |
Initial Operation Date | December 2020 |
Annual Generation | 4.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-92-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator BALGR Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Ballenger Road Solar A Plant Owners
Owner Name | Address | Ownership |
---|---|---|
RPSC Solar 5, LLC | 879 Sanchez Street, San Francisco, CA 94114 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2964 | Morgan Solar 1 CSG | Meredosia, IL | 4.4 GWh |
#2965 | Tank Farm 4 | Portsmouth, RI | 4.4 GWh |
#2966 | Gilcrest Sun CSG | Platteville, CO | 4.3 GWh |
#2967 | MA CS Uxbridge Community Solar | Uxbridge, MA | 4.3 GWh |
#2968 | Holly Swamp Solar, LLC | Lumberton, NC | 4.3 GWh |
#2969 | McDonough Solar 1, LLC CSG | Blandinsville, IL | 4.3 GWh |
#2970 | Harmony | Phillipsburg, NJ | 4.3 GWh |
#2971 | Groveland Solar | Groveland, MA | 4.3 GWh |
#2972 | Steel Sun | Lackawanna, NY | 4.3 GWh |
#2973 | Freight Line Solar, LLC | Pink Hill, NC | 4.3 GWh |
#2975 | C&B Graham Energy, LLC | Danville, IN | 4.3 GWh |
#2976 | Bani Solar | Olanta, SC | 4.3 GWh |
#2977 | Panda Solar NC 9, LLC | Hope Mills, NC | 4.3 GWh |
#2978 | Valencia 1 Solar CA | Westmorland, CA | 4.3 GWh |
#2979 | DRPA Ferry Ave Station Solar Project | City of Camden, NJ | 4.3 GWh |
#2980 | SEV NM Phase 2 | Roswell, NM | 4.3 GWh |
#2981 | Tower Road Solar, LLC CSG | Lee, IL | 4.3 GWh |
#2982 | Harris Shiloh | Shiloh, GA | 4.3 GWh |
#2983 | Rounseville Solar | Rochester, MA | 4.3 GWh |
#2984 | Soscol Ferry Solar | Napa, CA | 4.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ballenger Road Solar A.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AGA TAG Solar III LLC | Spartanburg, SC | 3.3 GWh | 5.2 mi |
Amethyst Solar | Forest City, NC | 5.9 GWh | 21.6 mi |
Atood II | Cowpens, SC | 3.9 GWh | 17.2 mi |
ATOOD Solar III LLC | Spartanburg, SC | 3.3 GWh | 5.2 mi |
BMW Manufacturing Co | Greer, SC | 31.7 GWh | 11 mi |
Broad River Solar, LLC | Mooresboro, NC | 91.9 GWh | 22.8 mi |
Bryant Road Solar | Spartanburg, SC | 2.3 GWh | 10.6 mi |
Charlotte Solar | Forest City, NC | 9.4 GWh | 22.3 mi |
Clifton Dam 3 Power Station | Converse, SC | 3.6 GWh | 16.1 mi |
Enoree Phase II Landfill Gas Recovery | Greer, SC | 283.0 MWh | 17.3 mi |
Limelight Solar I, LLC | Spartanburg, SC | 3.6 GWh | 9.7 mi |
Limelight Solar II LLC | Spartanburg, SC | 2.8 GWh | 13.7 mi |
Limelight Solar III, LLC | Spartanburg, SC | 5.6 GWh | 9.6 mi |
Pinson Solar Farm | Woodruff, SC | 39.1 GWh | 22.6 mi |
Rutherford Farm | Forest City, NC | 137.8 GWh | 21.8 mi |
Spartanburg Water System | Chesnee, SC | 2.0 GWh | 9.4 mi |
Turner Shoals | Mill Springs, NC | 10.8 GWh | 20.5 mi |
Tuxedo | Flat Rock, NC | 16.8 GWh | 20.9 mi |
Upper Pacolet Hydro | Pacolet, SC | 3.7 GWh | 22.4 mi |
Wellford Renewable Energy Plant | Spartanburg, SC | 79.0 MWh | 3.1 mi |