5120 279th Ave NE, Wilton, ND 58579Plant Summary Information
Baldwin Wind LLC is ranked #27 out of 57 power plants in North Dakota in terms of total annual net electricity generation.
Baldwin Wind LLC generated 108.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Baldwin Wind LLC |
---|---|
Utility Name | Baldwin Wind LLC |
Location | Burleigh County, ND |
Initial Operation Date | December 2010 |
Last Update | Dec 2023 |
Annual Generation | 360.4 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,654 out of 11,979 Power Plants Nationwide | |
Ranked #489 out of 1,359 Wind Power Plants Nationwide | |
Ranked #27 out of 57 North Dakota Power Plants | |
Ranked #19 out of 40 North Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of Baldwin Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Baldwin Wind LLC.
Monthly Net Generation for Baldwin Wind LLC
Baldwin Wind LLC Details
Summary Information | |
---|---|
Plant Name | Baldwin Wind LLC (57347) |
Plant Address | 5120 279th Ave NE, Wilton, ND 58579 |
Utility | Baldwin Wind LLC (56688) |
Latitude, Longitude | 47.1133, -100.7086 |
Generation Dates on File | Nov 2010 to Dec 2023 |
Initial Operation Date | December 2010 |
Annual Generation | 360.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Basin Electric Power Coop (1307) ND |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GE1 Details Operating December 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 102.4 MW |
Summer Capacity | 102.4 MW |
Winter Capacity | 102.4 MW |
Minimum Load | 5.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 64 |
Turbine Details | |
Number Of Turbines | 64 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.6 XLE |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Baldwin Wind LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#479 | Redbed Plains Wind Farm | Tuttle, OK | 372.8 GWh |
#480 | Tyler Bluff Wind Project, LLC | Muenster, TX | 372.7 GWh |
#481 | Tuscola Bay Wind | Reese, MI | 370.6 GWh |
#482 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 370.6 GWh |
#483 | White Rock West Wind Project | Anadarko, OK | 368.1 GWh |
#484 | Breckinridge Wind Project LLC | Enid, OK | 364.9 GWh |
#485 | Rocky Ridge Wind Project | Hobart, OK | 364.4 GWh |
#486 | Camp Grove Wind Farm | Wyoming, IL | 363.5 GWh |
#487 | Roscoe Wind Farm LLC | Roscoe, TX | 362.3 GWh |
#488 | Alta Wind Energy Center I | Mojave, CA | 361.0 GWh |
#490 | Buckthorn Wind | Mingus, TX | 358.5 GWh |
#491 | Trimont Area Wind Farm | Trimont, MN | 356.4 GWh |
#492 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 354.6 GWh |
#493 | Oakfield Wind Project | City of Oakfield, ME | 353.8 GWh |
#494 | Seiling Wind II | Seiling, OK | 353.5 GWh |
#495 | Black Rock Wind | Elk Garden, WV | 353.4 GWh |
#496 | Pine River Wind Park | Shepherd, MI | 352.7 GWh |
#497 | Lorenzo Wind | Lorenzo, TX | 352.7 GWh |
#498 | Hackberry Wind Farm | Albany, TX | 352.4 GWh |
#499 | Ivester Wind Farm | Wellsburg, IA | 352.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Baldwin Wind LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bison 2 Wind Energy Center | New Salem, ND | 236.8 GWh | 40.9 mi |
Bison 3 Wind Energy Center | New Salem, ND | 242.1 GWh | 40.9 mi |
Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh | 40.9 mi |
Bison I Wind Energy Center | New Salem, ND | 181.7 GWh | 40.9 mi |
Coal Creek | Underwood, ND | 8.3 TWh | 27.9 mi |
Coyote | Beulah, ND | 2.1 TWh | 52.5 mi |
FPL Energy Burleigh County Wind | Wilton, ND | 175.4 GWh | 1.2 mi |
FPL Energy Oliver Wind I LLC | Center, ND | 171.5 GWh | 23.2 mi |
FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh | 23.2 mi |
Garrison | Riverside, ND | 2.1 TWh | 42.2 mi |
Glen Ullin Energy Center | Glen Ullin, ND | 453.2 GWh | 53.2 mi |
Glen Ullin Station 6 | Glen Ullin, ND | 38.0 GWh | 53.4 mi |
Leland Olds | Stanton, ND | 3.0 TWh | 31 mi |
Milton R Young | Center, ND | 4.4 TWh | 24 mi |
New Frontier Wind | Ruso, ND | 399.8 GWh | 52.9 mi |
Oliver Wind III, LLC | Mandan, ND | 435.6 GWh | 24.2 mi |
Oliver Wind IV | Hannover, ND | 132.2 GWh | 42.5 mi |
R M Heskett | Mandan, ND | 26.9 GWh | 18.9 mi |
Tesoro Mandan Cogeneration Plant | Mandan, ND | 44.5 GWh | 20 mi |
Wilton Wind II LLC | Wilton, ND | 187.0 GWh | 1.4 mi |