Baldwin City Plant No 2 is ranked #41 out of 58 natural gas power plants in Kansas in terms of total annual net electricity generation.
Baldwin City Plant No 2 is comprised of 2 generators and generated 34.4 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Baldwin City Plant No 2 |
---|---|
Utility Name | City of Baldwin City- (KS) |
Location | Douglas County, KS |
Initial Operation Date | August 2004 |
Last Update | Dec 2023 |
Annual Generation | 145.0 MWh |
Annual Consumption | 1.9 k MMBtu |
Ranked #11,359 out of 11,852 Power Plants Nationwide | |
Ranked #2,130 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #117 out of 152 Kansas Power Plants | |
Ranked #41 out of 58 Kansas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 80.0% Distillate Fuel Oil : 20.0% |
Map of Baldwin City Plant No 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Baldwin City Plant No 2.
Monthly Net Generation for Baldwin City Plant No 2
Baldwin City Plant No 2 Details
Summary Information | |
---|---|
Plant Name | Baldwin City Plant No 2 (8020) |
Plant Address | 1101 Orange Street, Baldwin City, KS 66006 |
Utility | City of Baldwin City- (KS) (1148) |
Latitude, Longitude | 38.76491, -95.19201 |
Generation Dates on File | Jan 2004 to Dec 2023 |
Initial Operation Date | August 2004 |
Annual Generation | 145.0 MWh |
Fuel Types | Natural Gas : 80.0% Distillate Fuel Oil : 20.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Kansas City Power & Light Co (10000) KS |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | KANSAS GAS SERVICE COMPANY |
Pipeline Name |
SOUTHERN STAR CENTRAL GAS PIPELINE SOUTHERN STAR CENTRAL GAS PIPELINE |
Natural Gas Storage | No |
Generator 7 Details Operating August 2004
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2004 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 3 MW |
Net Winter Capacity With Natural Gas | 3 MW |
Net Summer Capacity With Oil | 3 MW |
Net Winter Capacity With Oil | 3 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Other Limits | Yes |
Generator 8 Details Operating August 2004
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2004 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 3 MW |
Net Winter Capacity With Natural Gas | 3 MW |
Net Summer Capacity With Oil | 3 MW |
Net Winter Capacity With Oil | 3 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Other Limits | Yes |
Baldwin City Plant No 2 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2120 | Henry Station | Bay City, MI | 460.0 MWh |
#2121 | Sturgis City Diesel Plant | Sturgis, MI | 208.0 MWh |
#2122 | MMWAC Resource Recovery Facility | Auburn, ME | 10.5 GWh |
#2123 | Blossburg | Blossburg, PA | 136.0 MWh |
#2124 | Cholla | Joseph City, AZ | 1.6 TWh |
#2125 | HEB00048 | Beaumont, TX | 129.0 MWh |
#2126 | Substation 20 Plant | Orangeburg, SC | 122.0 MWh |
#2127 | International Paper Pine Hill Mill | Pine Hill, AL | 448.8 GWh |
#2128 | Genesee Power Station LP | Flint, MI | 114.8 GWh |
#2129 | Novo BioPower Plant | Snowflake, AZ | 175.6 GWh |
#2131 | Auburn | Auburn, NE | 155.0 MWh |
#2132 | Belleville | Belleville, KS | 178.0 MWh |
#2133 | Northeast (WA) | Spokane, WA | 112.0 MWh |
#2134 | Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh |
#2135 | Cherry Street | Hudson, MA | 417.0 MWh |
#2136 | Preston (MN) | Preston, MN | 130.0 MWh |
#2137 | Litchfield | Litchfield, MN | 185.0 MWh |
#2138 | OTHERBenEKDallas | Dallas, TX | 107.0 MWh |
#2139 | Waverly Municipal Electric North Plant | Waverly, IA | 224.0 MWh |
#2140 | Falls City | Falls City, NE | 161.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Baldwin City Plant No 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baldwin City Plant No 1 | Baldwin City, KS | 19.0 MWh | 0.7 mi |
BPU Solar Farm | Kansas City, KS | 1.8 GWh | 38.4 mi |
Burlingame | Burlingame, KS | 46.1 MWh | 34.7 mi |
East Kansas Agri-Energy, LLC | Garnett, KS | 5.0 GWh | 34.1 mi |
FreeState Crooked Post Solar I | Topeka, KS | 3.4 GWh | 37.1 mi |
FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh | 39.8 mi |
FreeState Stull Solar I | LeCompton, KS | 215.0 MWh | 20.1 mi |
Gardner Energy Center | Gardner, KS | 40.0 MWh | 16.9 mi |
Garnett Municipal | Garnett, KS | 9.0 MWh | 34.3 mi |
Kansas River Project | Lawrence, KS | 19.2 GWh | 14.6 mi |
Lawrence Energy Center | Lawrence, KS | 1.4 TWh | 17.2 mi |
Nearman Creek | Kansas, KS | 636.1 GWh | 38.5 mi |
Osawatomie | Miami, KS | 44.0 GWh | 22.4 mi |
Osawatomie City of | Osawatomie, KS | 10.0 MWh | 22.1 mi |
Osawatomie Power Plant North Sub | Osawatomie, KS | 5.0 MWh | 22.2 mi |
Osawatomie Power Plant South Sub | Osawatomie, KS | 6.0 MWh | 22.7 mi |
Ottawa | Ottawa, KS | 377.0 MWh | 11.4 mi |
Quindaro | Kansas, KS | 6.2 GWh | 39.9 mi |
South Harper | Kansas City, MO | 197.6 GWh | 38.7 mi |
West Gardner | Johnson, KS | 262.6 GWh | 11.2 mi |