Bakke
1496 S US 385, Andrews, TX 79714Plant Summary Information
Bakke is ranked #18 out of 47 distillate fuel oil power plants in Texas in terms of total annual net electricity generation.
Bakke is comprised of 15 generators and generated 204.1 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Bakke |
---|---|
Utility Name | Power Depot Group A, LLC |
Location | Andrews County, TX |
Initial Operation Date | July 2013 |
Last Update | Dec 2023 |
Annual Generation | 877.0 MWh |
Annual Consumption | 8.7 k MMBtu |
Ranked #10,848 out of 11,852 Power Plants Nationwide | |
Ranked #430 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #610 out of 754 Texas Power Plants | |
Ranked #18 out of 47 Texas Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Bakke
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bakke.
Monthly Net Generation for Bakke
Bakke Details
Summary Information | |
---|---|
Plant Name | Bakke (65535) |
Plant Address | 1496 S US 385, Andrews, TX 79714 |
Utility | Power Depot Group A, LLC (64812) |
Latitude, Longitude | 32.29595, -102.54 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | July 2013 |
Annual Generation | 877.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator BAK1 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK10 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK11 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK12 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK13 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK14 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK15 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK2 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK3 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK4 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK5 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK6 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK7 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK8 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator BAK9 Details Operating July 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Bakke Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#420 | Backus Microgrid Project | Norwich, CT | 937.0 MWh |
#421 | Lauderdale | Ft. Lauderdale, FL | 262.3 GWh |
#422 | Sappi Cloquet Mill | Cloquet, MN | 475.1 GWh |
#423 | VPPSA Project 10 | Swanton, VT | 908.0 MWh |
#424 | Tumbleweed | Andrews, TX | 903.0 MWh |
#425 | Cope | Cope, SC | 1.6 TWh |
#426 | King Cove | King Cove, AK | 4.5 GWh |
#427 | Pleasant Valley (VA) | Harrisonburg, VA | 890.8 MWh |
#428 | Wrangell | Wrangell, AK | 890.0 MWh |
#429 | Cholla | Joseph City, AZ | 1.6 TWh |
#431 | TalenEnergy Martins Creek | Bangor, PA | 1.9 TWh |
#432 | Jamestown | Jamestown, ND | 869.0 MWh |
#433 | Quay County | Tucumcari, NM | 858.0 MWh |
#434 | Treasure Coast Energy Center | Ft. Pierce, FL | 1.9 TWh |
#435 | Arvah B Hopkins | Tallahassee, FL | 1.6 TWh |
#436 | Bluegrass Generating Station | LaGrange, KY | 36.5 GWh |
#437 | UNH 7.9 MW Plant | Durham, NH | 48.5 GWh |
#438 | Marsh Run Generation Facility | Remington, VA | 215.4 GWh |
#439 | Erving Paper Mills | Erving, MA | 42.5 GWh |
#440 | Louisa Generation Facility | Gordonsville, VA | 236.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bakke.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 898.9 GWh | 12.4 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 15.9 mi |
Frankel | Andrews, TX | 645.0 MWh | 15.4 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 22.8 mi |
Jumbo Hill Wind Project | Andrews, TX | 589.0 GWh | 24.7 mi |
Lapetus | Andrews, TX | 186.1 GWh | 13.7 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 26.6 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 232.8 GWh | 26.8 mi |
Oberon IA | Odessa, TX | 271.4 GWh | 42 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh | 33.9 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 21.1 mi |
Phoebe Solar | Kermit, TX | 514.1 GWh | 36.7 mi |
Prospero Solar | Andrews, TX | 747.8 GWh | 17.6 mi |
Prospero Solar II | Andrews, TX | 675.0 GWh | 17.9 mi |
Quail Run Energy Center | Odessa, TX | 2.3 TWh | 34.1 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 36.8 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 38.4 mi |
Stanton Wind Energy LLC | Lenorah, TX | 263.7 GWh | 41.3 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 4 mi |
Westover | Odessa, TX | 709.0 MWh | 32.2 mi |