Bacliff
5501 State Highway 146, Bacliff, TX 77518Plant Summary Information
Bacliff is ranked #132 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Bacliff is comprised of 6 generators and generated 41.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Bacliff |
---|---|
Utility Name | PHR Holdings LLC |
Location | Galveston County, TX |
Initial Operation Date | July 2018 |
Last Update | Aug 2024 |
Annual Generation | 126.9 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #2,880 out of 11,835 Power Plants Nationwide | |
Ranked #844 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #431 out of 749 Texas Power Plants | |
Ranked #132 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
PHR Holdings LLC (2015 to 2023) NRG Texas Power LLC (2016 to 2017) |
Map of Bacliff
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bacliff.
Monthly Net Generation for Bacliff
Bacliff Details
Summary Information | |
---|---|
Plant Name | Bacliff (60264) |
Plant Address | 5501 State Highway 146, Bacliff, TX 77518 |
Utility | PHR Holdings LLC (60048) |
Latitude, Longitude | 29.49233, -94.98483 |
Generation Dates on File | Jan 2017 to Aug 2024 |
Initial Operation Date | July 2018 |
Annual Generation | 126.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | None |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN TEXAS PIPELINE LLC |
Generator BCGT1 Details Operating July 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BAC_BAC_CTG1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG1 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 60 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BCGT2 Details Operating July 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BAC_BAC_CTG2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG2 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 60 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BCGT3 Details Operating July 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BAC_BAC_CTG3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG3 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 60 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BCGT4 Details Operating July 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BAC_BAC_CTG4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG4 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 60 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BCGT5 Details Operating July 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BAC_BAC_CTG5 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG5 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 60 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BCGT6 Details Operating July 2018
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BAC_BAC_CTG6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG6 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 60 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Bacliff Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#834 | PSEG Kearny Generating Station | Kearny, NJ | 132.3 GWh |
#835 | De Pere Energy Center | De Pere, WI | 144.4 GWh |
#836 | Escanaba Mill | Escanaba, MI | 411.8 GWh |
#837 | Algonquin Windsor Locks | Windsor Locks, CT | 130.4 GWh |
#838 | Pratt & Whitney | East Hartford, CT | 129.1 GWh |
#839 | Seminole Mill | Jacksonville, FL | 128.9 GWh |
#840 | Springdale 1 & 2 | Springdale, PA | 128.2 GWh |
#841 | Hardin County Peaking Facility | Kountze, TX | 128.1 GWh |
#842 | Brush Generation Facility | Brush, CO | 127.8 GWh |
#843 | Darbytown | Richmond, VA | 143.5 GWh |
#845 | Gans | Gans, PA | 126.1 GWh |
#846 | Comanche (CO) | Pueblo, CO | 5.7 TWh |
#847 | Silas Ray | Brownsville, TX | 125.1 GWh |
#848 | PPS Power Plant No 1 | Paducah, KY | 124.8 GWh |
#849 | UCONN Cogen Facility | Storrs, CT | 123.9 GWh |
#850 | Mid-Georgia Cogeneration Facility | Kathleen, GA | 123.4 GWh |
#851 | New Orleans Power | New Orleans, LA | 123.1 GWh |
#852 | Marshalltown | Marshalltown, IA | 122.1 GWh |
#853 | Central Utility Plant - Texas A&M | College Station, TX | 122.0 GWh |
#854 | Woodland Pulp, LLC | Baileyville, ME | 366.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bacliff.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayou Cogen Plant | Pasadena, TX | 2.3 TWh | 9.7 mi |
Exelon LaPorte Generating Station | LaPorte, TX | 189.8 GWh | 15.5 mi |
GCWA | Texas City, TX | 433.0 MWh | 8 mi |
Green Power 2 | Texas City, TX | 3.8 TWh | 8.5 mi |
HEB00028 | League City, TX | 338.0 MWh | 6.9 mi |
HEB00769 | Webster, TX | 289.0 MWh | 10.8 mi |
NASA Johnson Space Center CHP | Houston, TX | 84.5 GWh | 7.9 mi |
Power Station 4 | Texas City, TX | 629.1 GWh | 8.7 mi |
San Jacinto Steam Electric Station | La Porte, TX | 716.0 GWh | 14.4 mi |
Texas City Plant Union Carbide | Texas City, TX | 42.2 GWh | 8.4 mi |
Texas City Power Plant | Texas City, TX | 2.1 TWh | 8.2 mi |
Topaz Generating | Texas City, TX | 657.2 GWh | 4.6 mi |
WAL1062 | Friendswood, TX | 317.0 MWh | 11.3 mi |
WAL3298 | Kemah, TX | 298.0 MWh | 3.6 mi |
WAL3510 | Pearland, TX | 162.0 MWh | 15.5 mi |
WAL462 | Alvin, TX | 324.0 MWh | 15.6 mi |
WAL5116 | Deer Park, TX | 338.0 MWh | 13.7 mi |
WAL529 | La Marque, TX | 274.0 MWh | 8.3 mi |
WAL5388 | League City, TX | 315.0 MWh | 6.5 mi |
WAL752 | Pasadena, TX | 283.0 MWh | 15 mi |