B.R. Sauk Rapids CSG

4013 Golden Spike Road NE, Sauk Rapids, MN 56379

Plant Summary Information

B.R. Sauk Rapids CSG is ranked #78 out of 482 solar farms in Minnesota in terms of total annual net electricity generation.

B.R. Sauk Rapids CSG generated 1.2 GWh during the 3-month period between September 2023 to December 2023.

Plant NameB.R. Sauk Rapids CSG
Utility NameMinnesota Solar CSG 9, LLC
LocationBenton County, MN
Initial Operation DateNovember 2017
Last Update Dec 2023
Annual Generation 7.5 GWh
Annual Consumption 26.2 k MMBtu
Ranked #6,780 out of 11,852 Power Plants Nationwide
Ranked #2,176 out of 5,655 Solar Power Plants Nationwide
Ranked #210 out of 736 Minnesota Power Plants
Ranked #78 out of 482 Minnesota Solar Power Plants
Fuel Types Solar

Map of B.R. Sauk Rapids CSG

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for B.R. Sauk Rapids CSG.

Create Your Account Today

Monthly Net Generation for B.R. Sauk Rapids CSG

B.R. Sauk Rapids CSG Details

Summary Information
Plant NameB.R. Sauk Rapids CSG (61455)
Plant Address4013 Golden Spike Road NE, Sauk Rapids, MN 56379
UtilityMinnesota Solar CSG 9, LLC (61073)
Latitude, Longitude45.6236, -94.0782
Generation Dates on FileNov 2017 to Dec 2023
Initial Operation DateNovember 2017
Annual Generation 7.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number16-663, 16-664, 16-665, 16-666, 16-667
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerNorthern States Power Co - Minnesota (13781) MN
Grid Voltage 34.50 kV
Energy StorageNo

Generator 42292 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Generator 42294 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Generator 42295 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Generator 42296 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Generator 42297 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

B.R. Sauk Rapids CSG Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2166Warbler HoldingsShelby, NC7.6 GWh
#2167Held Solar ProjectWaite Park, MN7.6 GWh
#2168Shannon FarmShannon, NC7.6 GWh
#2169Selma Solar LLCSelma, NC7.6 GWh
#2170Town HouseChelsea, ME7.6 GWh
#2171Eagle CreekTaft, CA7.6 GWh
#2172Canal Energy S23, LLCHanford, CA7.6 GWh
#2173Henrietta SolarWest Henrietta, NY7.6 GWh
#2174Green Lakes SolarManilus, NY7.6 GWh
#2175HanoverWrightstown, NJ7.5 GWh
#2177Lepomis PV Energy LLCPlymouth, MA7.5 GWh
#2178ZPD-PT Solar Project 2017-038 Hybrid LLCLancaster, MA7.5 GWh
#2179PinesageWest End, NC7.5 GWh
#2180Carl Friedrich Gauss SolarHalifax, NC7.5 GWh
#2181Prairie FireTucson, AZ7.5 GWh
#2182Finchville Solar, LLC Hybrid CSGMt. Hope, NY7.6 GWh
#2183Highland Solar Center LLCGrifton, NC7.5 GWh
#2184Sunrise Community SolarNorth Branch, MN7.5 GWh
#2185GMP Solar - HartfordHartford, VT7.5 GWh
#2186MC1 SolarWilliamston, NC7.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding B.R. Sauk Rapids CSG.

Plant NamePlant LocationAnnual GenerationDistance
Caelum Community SolarFoley, MN2.9 GWh7.3 mi
Delphinus Community SolarSauk Rapids, MN3.0 GWh0.6 mi
GSPP Imholte CSGSt. Cloud, MN1.7 GWh6.1 mi
Haven Solar Project CSGSaint Cloud, MN4.7 GWh7.6 mi
Marmas Solar CSGSt. Cloud, MN6.5 GWh5 mi
Novel Novak Solar LLC CSGFoley, MN1.5 GWh7.5 mi
Novel Pederson Solar CSGSauk Rapids, MN1.7 GWh1.4 mi
Sartell DamSartell, MN20.3 GWh5.9 mi
Sherburne Community Solar One LLC CSGSaint Cloud, MN1.8 GWh6.9 mi
St. Cloud HydroSt Cloud, MN37.2 GWh6.3 mi
Stevens Community Solar LLCFoley, MN2.2 GWh7.1 mi
Studenski Community Solar LLC CSGSauk Rapids, MN1.8 GWh1.4 mi
USS Brockway Solar CSGSartell, MN2.0 GWh7.6 mi
USS Haven Solar LLC CSGSt. Cloud, MN2.0 GWh7.6 mi
USS JJ Solar CSGSauk Rapids, MN2.1 GWh1.6 mi
USS Kasch Solar CSGSauk Rapids, MN2.1 GWh0.9 mi
USS Mayhew Solar LLC CSGSauk Rapids, MN2.0 GWh1.4 mi
USS Reindeer Solar LLC CSGSauk Rapids, MN2.1 GWh2.2 mi
USS Solar Rapids CSGSauk Rapids, MN2.0 GWh3.7 mi
USS White Cloud LLC CSGSt. Cloud, MN1.9 GWh7.5 mi