B.R. Sartell CSG
3401 Pinecone Road, Sartell, MN 56377Plant Summary Information
B.R. Sartell CSG is ranked #138 out of 443 solar farms in Minnesota in terms of total annual net electricity generation.
B.R. Sartell CSG generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | B.R. Sartell CSG |
---|---|
Utility Name | Minnesota Solar CSG 21, LLC |
Location | Stearns County, MN |
Initial Operation Date | November 2017 |
Last Update | Dec 2022 |
Annual Generation | 4.5 GWh |
Annual Consumption | 15.9 k MMBtu |
Ranked #7,699 out of 11,249 Power Plants Nationwide | |
Ranked #2,784 out of 5,158 Solar Power Plants Nationwide | |
Ranked #309 out of 695 Minnesota Power Plants | |
Ranked #138 out of 443 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of B.R. Sartell CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for B.R. Sartell CSG.
Monthly Net Generation for B.R. Sartell CSG
B.R. Sartell CSG Details
Summary Information | |
---|---|
Plant Name | B.R. Sartell CSG (61454) |
Plant Address | 3401 Pinecone Road Sartell, MN 56377 |
Utility | Minnesota Solar CSG 21, LLC (61074) |
Latitude, Longitude | 45.665, -94.2254 |
Generation Dates on File | Nov 2017 to Dec 2022 |
Initial Operation Date | November 2017 |
Annual Generation | 4.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-572, 16-573, 16-574 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 42286 Details Operating November 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Generator 42287 Details Operating November 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Generator 42288 Details Operating November 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
B.R. Sartell CSG Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2774 | Calverton | Calverton, NY | 4.5 GWh |
#2775 | Cuyahoga County Landfill | Brooklyn, OH | 4.5 GWh |
#2776 | Prophet CSG | Rock Falls, IL | 4.5 GWh |
#2777 | Rolla Solar Farm (MO) | Rolla, MO | 4.5 GWh |
#2778 | Carver Gladden CSG | Norwood Young America, MN | 4.5 GWh |
#2779 | Mission Solar LLC | Merced, CA | 4.5 GWh |
#2780 | Morgan Solar 2, LLC CSG | Murrayville, IL | 4.5 GWh |
#2781 | Linton | Linton, IN | 4.5 GWh |
#2782 | Gas City Solar Park | Gas City, IN | 4.5 GWh |
#2783 | Kern A Community Solar, LLC CSG | West Frankfort, IL | 4.5 GWh |
#2785 | Fountain Folkston | Folkston, GA | 4.4 GWh |
#2786 | Grand Valley Solar Gardens | Allendale, MI | 4.4 GWh |
#2787 | Olmstead II CSG | Lena, IL | 4.4 GWh |
#2788 | IL West Hallock Project1 | Edelstein, IL | 4.4 GWh |
#2789 | APG New Chesapeake | Aberdeen, MD | 4.4 GWh |
#2790 | Berkley | Berkley, MA | 4.4 GWh |
#2791 | Ridge Farm | Ridge Farm, IL | 4.4 GWh |
#2792 | Cicero Energy Storage 2 LLC | East Syracuse, NY | 4.4 GWh |
#2793 | Shrewsbury Solar | Shrewsbury, MA | 4.4 GWh |
#2794 | Next Generation Solar Farm | New Haven, VT | 4.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding B.R. Sartell CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
B.R. Sauk Rapids CSG | Sauk Rapids, MN | 7.9 GWh | 7.7 mi |
Delphinus Community Solar | Sauk Rapids, MN | 2.8 GWh | 7.3 mi |
GSPP Held LLC CSG | St. Cloud, MN | 4.3 GWh | 10 mi |
GSPP Imholte CSG | St. Cloud, MN | 1.7 GWh | 8 mi |
GSSP Schneider LLC | Waite Park, MN | 8.2 GWh | 10 mi |
Held Solar Project | Waite Park, MN | 6.2 GWh | 10 mi |
Marmas Solar CSG | St. Cloud, MN | 6.7 GWh | 9.2 mi |
Novel Pederson Solar CSG | Sauk Rapid, MN | 1.7 GWh | 8.8 mi |
Orion Community Solar | St. Joseph, MN | 4.6 GWh | 10 mi |
Sartell Dam | Sartell, MN | 32.4 GWh | 3.5 mi |
Sherburne Community Solar One LLC CSG | Saint Cloud, MN | 1.8 GWh | 10.2 mi |
St. Cloud Hydro | St Cloud, MN | 54.3 GWh | 8.9 mi |
Studenski Community Solar LLC CSG | Sauk Rapids, MN | 1.9 GWh | 8.8 mi |
USS Brockway Solar CSG | Sartell, MN | 2.0 GWh | 1.4 mi |
USS JJ Solar CSG | Sauk Rapids, MN | 2.1 GWh | 8.7 mi |
USS Kasch Solar CSG | Sauk Rapids, MN | 2.1 GWh | 8.5 mi |
USS Mayhew Solar LLC CSG | Sauk Rapids, MN | 1.9 GWh | 8.9 mi |
USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.1 GWh | 8.9 mi |
USS Solar Rapids CSG | Sauk Rapids, MN | 2.0 GWh | 6.6 mi |
USS White Cloud LLC CSG | St. Cloud, MN | 1.7 GWh | 11 mi |