AVS Lancaster 1
8780 East Ave F, Lancaster, CA 93535Plant Summary Information
AVS Lancaster 1 is ranked #323 out of 799 solar farms in California in terms of total annual net electricity generation.
AVS Lancaster 1 generated 1.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | AVS Lancaster 1 |
---|---|
Utility Name | Tesla Inc. |
Location | Los Angeles County, CA |
Initial Operation Date | December 2016 |
Last Update | Dec 2023 |
Annual Generation | 8.2 GWh |
Annual Consumption | 29.3 k MMBtu |
Ranked #6,561 out of 11,852 Power Plants Nationwide | |
Ranked #2,020 out of 5,655 Solar Power Plants Nationwide | |
Ranked #905 out of 1,570 California Power Plants | |
Ranked #323 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
SolarCity Corporation (2015 to 2015) Tesla Inc. (2016 to 2023) |
Map of AVS Lancaster 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AVS Lancaster 1.
Monthly Net Generation for AVS Lancaster 1
AVS Lancaster 1 Details
Summary Information | |
---|---|
Plant Name | AVS Lancaster 1 (60085) |
Plant Address | 8780 East Ave F, Lancaster, CA 93535 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 34.74889, -117.97357 |
Generation Dates on File | Jan 2017 to Dec 2023 |
Initial Operation Date | December 2016 |
Annual Generation | 8.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 1.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3.7 MW |
Summer Capacity | 3.7 MW |
Winter Capacity | 3.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 5 MW |
Virtual Net Metering Agreement | No |
AVS Lancaster 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Mound Solar Owner X, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2010 | HMW Minster PV I | Village of Minster, OH | 8.2 GWh |
#2011 | Walt Disney World Solar Facility | Orlando, FL | 8.2 GWh |
#2012 | Samarcand Solar Farm, LLC | Biscoe, NC | 8.2 GWh |
#2013 | Nash 97 Solar 2 | Middlesex, NC | 8.2 GWh |
#2014 | Nickelson Solar 2 | Wallace, NC | 8.2 GWh |
#2015 | Main Rd Community Solar | Newstead, NY | 8.2 GWh |
#2016 | RCWD PV Project | Murrieta, CA | 8.2 GWh |
#2017 | Vasquez V CSG | Platteville, CO | 8.2 GWh |
#2018 | Carthage A | Carthage, NY | 8.2 GWh |
#2019 | Pamlico Partners Solar | Washington, NC | 8.2 GWh |
#2021 | Cafferty Hill Solar | Owego, NY | 8.2 GWh |
#2022 | North Bridgton | Oakland, ME | 8.2 GWh |
#2023 | Sugar Hill Solar 1 | Clifton Park, NY | 8.2 GWh |
#2024 | Syncarpha Taos | Taos, NM | 8.2 GWh |
#2025 | Randolph CSG PV1-5 | Randolph, MN | 8.2 GWh |
#2026 | Mohave Electric at Fort Mohave | Fort Mohave, AZ | 8.2 GWh |
#2027 | WaveSun Community Solar | Waverly, MN | 8.2 GWh |
#2028 | BG Stewart Solar Farm, LLC | Marshville, NC | 8.2 GWh |
#2029 | Princeton | Princeton, NC | 8.2 GWh |
#2030 | Fairfield PV - BD Solar Fairfield LLC | Fairfield, ME | 8.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding AVS Lancaster 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arrache 4006 | Palmdale, CA | 2.4 GWh | 7.8 mi |
Arrache 4013 | Palmdale, CA | 1.4 GWh | 8.1 mi |
Arrache 8083 | Palmdale, CA | 3.2 GWh | 8.6 mi |
Division 2 | Lancaster, CA | 1.2 GWh | 9.3 mi |
Division 3 | Lancaster, CA | 1.5 GWh | 9.3 mi |
Green Beanworks B PV | Lancaster, CA | 6.2 GWh | 4.3 mi |
Green Beanworks D PV | Palmdale, CA | 6.3 GWh | 9 mi |
Heliocentric | Palmdale, CA | 2.5 GWh | 6.5 mi |
Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 9.2 mi |
Kettering Solar 2 | Lancaster, CA | 1.7 GWh | 9.2 mi |
L-8 Solar Project | Palmdale, CA | 2.7 GWh | 6.5 mi |
Lancaster | Lancaster, CA | 8.5 GWh | 0.4 mi |
Lancaster Baptist Church | Lancaster, CA | 957.0 MWh | 6.1 mi |
Lancaster Solar 1 | Lancaster, CA | 1.7 GWh | 7.3 mi |
Ma | Lancaster, CA | 4.2 GWh | 6.3 mi |
Morgan Lancaster 1 | Lancaster, CA | 688.0 MWh | 8.7 mi |
SEPV 1 | Palmdale, CA | 3.0 GWh | 9.2 mi |
Solar Oasis LLC | Palmdale, CA | 51.3 GWh | 9.1 mi |
US-TOPCO (Soccer Center) | Lancaster, CA | 7.0 GWh | 8.6 mi |
Vinam | Lancaster, CA | 3.1 GWh | 7.4 mi |