Audrey Solar
920 Washburn Switch Rd, Shelby, NC 28150Plant Summary Information
Audrey Solar is ranked #584 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Audrey Solar generated 1.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Audrey Solar |
---|---|
Utility Name | Audrey Solar LLC |
Location | Cleveland County, NC |
Initial Operation Date | April 2016 |
Last Update | Dec 2023 |
Annual Generation | 4.9 GWh |
Annual Consumption | 17.4 k MMBtu |
Ranked #7,690 out of 11,835 Power Plants Nationwide | |
Ranked #2,810 out of 5,643 Solar Power Plants Nationwide | |
Ranked #668 out of 862 North Carolina Power Plants | |
Ranked #584 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Sunlight Partners (2013 to 2014) Audrey Solar LLC (2015 to 2023) |
Map of Audrey Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Audrey Solar.
Monthly Net Generation for Audrey Solar
Audrey Solar Details
Summary Information | |
---|---|
Plant Name | Audrey Solar (58732) |
Plant Address | 920 Washburn Switch Rd, Shelby, NC 28150 |
Utility | Audrey Solar LLC (59910) |
Latitude, Longitude | 35.32806, -81.62194 |
Generation Dates on File | Apr 2016 to Dec 2023 |
Initial Operation Date | April 2016 |
Annual Generation | 4.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF13-38-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator PV1 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 3.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Audrey Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2800 | Barnhill Road Solar, LLC | Elizabeth City, NC | 4.9 GWh |
#2801 | Blue Prairie Solar, LLC | Black River Falls, WI | 4.9 GWh |
#2802 | Sierra Pacific Chinese Camp | Chinese Camp, CA | 4.9 GWh |
#2803 | Vermillion River_MN_GRE DEA-GM | Farmington, MN | 4.9 GWh |
#2804 | Toys R Us- DE, Inc. at Mt. Olive, NJ | Mt. Olive, NJ | 4.9 GWh |
#2805 | Johnson Matthey, Inc. Solar | Paulsboro, NJ | 4.9 GWh |
#2806 | NY- CSG- Johnstown 2 | New York, NY | 4.9 GWh |
#2807 | Brockelman | Lancaster, MA | 4.9 GWh |
#2808 | 276 Federal Rd(CSG) | Carver, MA | 4.7 GWh |
#2809 | Antares Community Solar | Tracy, MN | 4.9 GWh |
#2811 | TES Rowtier | Westminster, MA | 4.9 GWh |
#2812 | Cohalan | Central Islip, NY | 4.9 GWh |
#2813 | Richardson Solar | Barnswell, SC | 4.9 GWh |
#2814 | SELCO Community Solar | Shrewsbury, MA | 4.9 GWh |
#2815 | Wilson Solar Farm 1 | Wilson, NC | 4.9 GWh |
#2816 | DGS Wasco State Prison | Wasco, CA | 4.8 GWh |
#2817 | SSI West Riverside Landfill LLC | Riverside, CA | 4.8 GWh |
#2818 | San Diego - EMDF at San Diego | San Diego, CA | 4.8 GWh |
#2819 | Tolland Solar NG LLC | Tolland, MA | 4.8 GWh |
#2820 | Green Acres Solar Facility 1 | Elk Grove, CA | 4.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Audrey Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.3 GWh | 7.5 mi |
233 Randolph 74 Solar I, LLC | Shelby, NC | 3.7 GWh | 2.1 mi |
Ayrshire | Shelby, NC | 35.4 GWh | 3.1 mi |
Beetle Solar | Mooresboro, NC | 6.0 GWh | 10.6 mi |
County Home Solar Center, LLC | Shelby, NC | 3.3 GWh | 7.8 mi |
Gamble Solar | Bostic, NC | 6.0 GWh | 11.1 mi |
Hutchinson Farm | Shelby, NC | 9.3 GWh | 7.6 mi |
Innovative Solar 15, LLC | Ellenboro, NC | 3.1 GWh | 8 mi |
Innovative Solar 18, LLC | Bostic, NC | 3.3 GWh | 10.4 mi |
James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh | 10.8 mi |
Lafayette Solar I, LLC | Shelby, NC | 3.2 GWh | 7.4 mi |
Neisler Street Solar | Shelby, NC | 3.9 GWh | 4 mi |
Old Caroleen Solar Farm | Forest City, NC | 3.8 GWh | 10.9 mi |
Ruff Solar LLC | Ellenboro, NC | 42.0 GWh | 8 mi |
Shelby Randolph Road Solar 1, LLC | Shelby, NC | 3.4 GWh | 2.3 mi |
Shelby Solar Energy Generation Facility | Shelby, NC | 1.1 GWh | 5.4 mi |
SID Solar I, LLC | Shelby, NC | 8.1 GWh | 8.1 mi |
Sophie Solar | Mooresboro, NC | 8.1 GWh | 4.5 mi |
Waco Farm | Waco, NC | 8.8 GWh | 11.2 mi |
Warbler Holdings | Shelby, NC | 7.6 GWh | 0.6 mi |