Athos Solar Project
25250 Rice Rd., Desert Center, CA 92239Plant Summary Information
Athos Solar Project is ranked #38 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Athos Solar Project generated 241.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Athos Solar Project |
---|---|
Utility Name | SE Athos I, LLC |
Location | Riverside County, CA |
Initial Operation Date | June 2022 |
Last Update | Aug 2024 |
Annual Generation | 593.4 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,104 out of 11,835 Power Plants Nationwide | |
Ranked #38 out of 5,643 Solar Power Plants Nationwide | |
Ranked #60 out of 1,569 California Power Plants | |
Ranked #15 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Athos Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Athos Solar Project.
Monthly Net Generation for Athos Solar Project
Athos Solar Project Details
Summary Information | |
---|---|
Plant Name | Athos Solar Project (63300) |
Plant Address | 25250 Rice Rd., Desert Center, CA 92239 |
Utility | SE Athos I, LLC (62983) |
Latitude, Longitude | 33.75128, -115.35499 |
Generation Dates on File | Jun 2022 to Aug 2024 |
Initial Operation Date | June 2022 |
Annual Generation | 593.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator IPAT1 Details Operating June 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 250 MW |
Summer Capacity | 250 MW |
Winter Capacity | 250 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
DC Net Capacity | 365 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Athos Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#28 | Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh |
#29 | Stateline Solar | Nipton, CA | 618.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh |
#31 | Genesis Solar Energy Project | Blythe, CA | 609.1 GWh |
#32 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#33 | Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh |
#34 | Moapa Southern Paiute | Moapa, NV | 604.0 GWh |
#35 | Bighorn Solar 1 | Pueblo, CO | 600.1 GWh |
#36 | Titan Solar Project | Van Horn, TX | 597.8 GWh |
#37 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#39 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh |
#40 | Noble Solar | Krum, TX | 575.6 GWh |
#41 | AV Solar Ranch One | Lancaster, CA | 576.3 GWh |
#42 | Oberon II Solar Project | Desert Center, CA | 549.7 GWh |
#43 | Blythe Mesa Solar II | Blythe, CA | 541.3 GWh |
#44 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.3 GWh |
#45 | Oberon Solar Project | Desert Center, CA | 534.1 GWh |
#46 | Dodge Flat | Reno, NV | 540.8 GWh |
#47 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#48 | Five Wells Solar Center - Hybrid | Rogers, TX | 537.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Athos Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 4.1 mi |
Arlington Energy Center II | Blythe, CA | 596.9 GWh | 33.6 mi |
Arlington Energy Center III | Blythe, CA | 263.6 GWh | 33.6 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 28.1 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 29 mi |
Desert Harvest II LLC | Desert Center, CA | 133.8 GWh | 3.7 mi |
Desert Harvest, LLC | Desert Center, CA | 185.8 GWh | 3.7 mi |
Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh | 4.4 mi |
Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh | 5.4 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 21.4 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 28.2 mi |
Maverick Solar 4, LLC | Desert Center, CA | 231.3 GWh | 3.8 mi |
Maverick Solar 6, LLC | Desert Center, CA | 268.2 GWh | 3.8 mi |
Maverick Solar 7, LLC | Desert Center, CA | 312.8 GWh | 3.8 mi |
Maverick Solar, LLC | Desert Center, CA | 375.5 GWh | 3.8 mi |
Oberon II Solar Project | Desert Center, CA | 549.7 GWh | 2.2 mi |
Oberon Solar Project | Desert Center, CA | 534.1 GWh | 2.2 mi |
SE Athos II, LLC | Desert Center, CA | 473.9 GWh | 0 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 28.2 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 4.1 mi |