AT&T - Hayward
221 West Winton Avenue, Hayward, CA 94544Plant Summary Information
AT&T - Hayward is ranked #251 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
AT&T - Hayward is comprised of 1 generator and generated 7.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | AT&T - Hayward |
---|---|
Utility Name | Bloom Energy |
Location | Alameda County, CA |
Initial Operation Date | November 2016 |
Last Update | Dec 2023 |
Annual Generation | 7.1 GWh |
Annual Consumption | 53.4 k MMBtu |
Ranked #6,938 out of 11,852 Power Plants Nationwide | |
Ranked #1,669 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #959 out of 1,570 California Power Plants | |
Ranked #251 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of AT&T - Hayward
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AT&T - Hayward.
Monthly Net Generation for AT&T - Hayward
AT&T - Hayward Details
Summary Information | |
---|---|
Plant Name | AT&T - Hayward (65208) |
Plant Address | 221 West Winton Avenue, Hayward, CA 94544 |
Utility | Bloom Energy (57128) |
Latitude, Longitude | 37.65988, -122.09685 |
Generation Dates on File | Jan 2021 to Dec 2023 |
Initial Operation Date | November 2016 |
Annual Generation | 7.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PACIFIC GAS |
Natural Gas Storage | No |
Generator ATA17 Details Operating November 2016
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | OVER |
AT&T - Hayward Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1659 | Streeter Station | Cedar Falls, IA | 7.5 GWh |
#1660 | ATT Van Nyus | Van Nuys, CA | 7.2 GWh |
#1661 | CalPeak Power Vaca Dixon Peaker Plant | Vacaville, CA | 7.2 GWh |
#1662 | AT&T Holger | San Jose, CA | 7.2 GWh |
#1663 | FDX010.0 FedEx Fuel Cell | Middletown, CT | 7.1 GWh |
#1664 | Weleetka | Weleetka, OK | 7.1 GWh |
#1665 | Provo Power Plant | Provo, UT | 7.1 GWh |
#1666 | MMSD South Shore Wastewater | Oak Creek, WI | 30.2 GWh |
#1667 | Signal Hill Generating LLC | Wichita Falls, TX | 7.1 GWh |
#1668 | Herrema Dairy | Fair Oaks, IN | 7.1 GWh |
#1670 | Pixar - Emeryville | Emeryville, CA | 7.1 GWh |
#1671 | SCC - San Jose | San Jose, CA | 7.0 GWh |
#1672 | Sierra Nevada Brewing Co Hybrid | Chico, CA | 9.3 GWh |
#1673 | ATT Kelvin | Irvine, CA | 7.0 GWh |
#1674 | DirecTV - Los Angeles | Los Angeles, CA | 7.0 GWh |
#1675 | AT&T - Redwood City | Redwood City, CA | 7.0 GWh |
#1676 | Orrville | Orrville, OH | 20.8 GWh |
#1677 | Southern Minnesota Beet Sugar | Renville, MN | 25.6 GWh |
#1678 | Waste Management Eco Vista LFGTE | Springdale, AR | 6.9 GWh |
#1679 | Bos Dairy, LLC | Fair Oaks, IN | 6.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding AT&T - Hayward.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alameda | Alameda, CA | 3.9 GWh | 13.8 mi |
AT&T - Redwood City | Redwood City, CA | 7.0 GWh | 13.6 mi |
Bishop Ranch - BR 1-Y | San Ramon, CA | 1.6 GWh | 10.4 mi |
City of Hayward WWTP | Hayward, CA | 10.3 GWh | 3 mi |
City of Palo Alto | Palo Alta, CA | 20.6 MWh | 15.3 mi |
Dynegy Oakland Power Plant | Oakland, CA | 9.3 GWh | 13.8 mi |
Franklin Templeton San Mateo | San Mateo, CA | 3.8 GWh | 13.4 mi |
Fremont CA AutoFactory | Fremont, CA | 532.0 MWh | 14.3 mi |
Gilead Foster City Solar Project | Foster City, CA | 1.5 GWh | 11.7 mi |
Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.6 GWh | 11.4 mi |
KSR028 Merced Fuel Cell | San Leandro, CA | 14.4 GWh | 4.9 mi |
Life Technologies - Fremont | Fremont, CA | 9.9 GWh | 14.7 mi |
Life Technologies - Pleasanton | Pleasanton, CA | 8.0 GWh | 11.7 mi |
Pleasanton - Amador Valley High School | Pleasanton, CA | 1.5 GWh | 12.2 mi |
Preferred Freezer San Leandro | San Leandro, CA | 3.2 GWh | 4.7 mi |
Russell City Energy Center | Hayward, CA | 1.7 TWh | 2.7 mi |
Santa Rita Jail Fuel Cell | Dublin, CA | 11.1 GWh | 12.2 mi |
Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh | 12.2 mi |
Silicon Valley Clean Water | Redwood City, CA | 4.7 GWh | 10.9 mi |
SRI International Cogen Project | Menlo Park, CA | 26.1 GWh | 14.7 mi |