Astra Wind Farm
41801 FM 168, Happy, TX 79042Plant Summary Information
Astra Wind Farm is ranked #83 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Astra Wind Farm generated 142.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Astra Wind Farm |
---|---|
Utility Name | Astra Wind LLC |
Location | Randall County, TX |
Initial Operation Date | May 2017 |
Last Update | Aug 2024 |
Annual Generation | 593.6 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,103 out of 11,835 Power Plants Nationwide | |
Ranked #254 out of 1,343 Wind Power Plants Nationwide | |
Ranked #203 out of 749 Texas Power Plants | |
Ranked #83 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Astra Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Astra Wind Farm.
Monthly Net Generation for Astra Wind Farm
Astra Wind Farm Details
Summary Information | |
---|---|
Plant Name | Astra Wind Farm (60856) |
Plant Address | 41801 FM 168, Happy, TX 79042 |
Utility | Astra Wind LLC (60515) |
Latitude, Longitude | 34.76954, -102.05242 |
Generation Dates on File | May 2017 to Aug 2024 |
Initial Operation Date | May 2017 |
Annual Generation | 593.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator ASTRA Details Operating May 2017
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | HERFWIND_ALL |
RTO ISO Location Designation For Reporting Wholesale Sales Data | HERFWIND_ALL |
Nameplate Capacity | 163 MW |
Summer Capacity | 163 MW |
Winter Capacity | 163 MW |
Minimum Load | 1.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 68 |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 68 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.4-107 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Astra Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#244 | South Plains Wind Phase I | Floydada, TX | 607.1 GWh |
#245 | Heart of Texas Wind Project | Brady, TX | 606.0 GWh |
#246 | Shamrock Wind | TBD, TX | 603.2 GWh |
#247 | NaturEner Rim Rock Energy | Kevin, MT | 601.5 GWh |
#248 | North Bend Wind Project, LLC | Highmore, SD | 599.5 GWh |
#249 | Maple Ridge Wind Farm | Lowville, NY | 599.2 GWh |
#250 | Limestone Wind Project | Coolidge, TX | 596.8 GWh |
#251 | Cedar Springs II | Douglas, WY | 596.2 GWh |
#252 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#255 | Wild Horse | Ellensburg, WA | 592.7 GWh |
#256 | Castle Gap Wind | Goldthwaite, TX | 591.0 GWh |
#257 | Cedar Creek II | New Raymer, CO | 589.5 GWh |
#258 | Jumbo Hill Wind Project | Andrews, TX | 588.6 GWh |
#259 | Kings Point Wind Energy Center | Golden City, MO | 587.8 GWh |
#260 | Langford Wind Power | Christoval, TX | 587.5 GWh |
#261 | Horseshoe Bend Wind LLC | Arlington, OR | 584.2 GWh |
#262 | Golden Hill Wind | Wasco, OR | 584.0 GWh |
#263 | Carousel Wind Farm LLC | Burlington, CO | 583.9 GWh |
#264 | Foxtail Wind, LLC | Forbes, ND | 583.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Astra Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bethel Wind Farm LLC | Dimmitt, TX | 1.1 TWh | 27.5 mi |
Briscoe Wind Farm | Silverton, TX | 414.6 GWh | 51.9 mi |
Canadian Breaks, LLC | Vega, TX | 841.7 GWh | 33.3 mi |
Golden Spread Panhandle Wnd Rch | Wilderado, TX | 192.5 GWh | 33.9 mi |
Goodnight | Claude, TX | 334.8 GWh | 46.8 mi |
Harrington | Amarillo, TX | 2.4 TWh | 40.4 mi |
Hecate Energy Frye Solar LLC | Kress, TX | 426.9 GWh | 36.1 mi |
Majestic II Wind | Panhandle, TX | 180.7 GWh | 50.3 mi |
Mariah del Norte | Friona, TX | 867.8 GWh | 30.7 mi |
Nichols | Amarillo, TX | 1.2 TWh | 39.5 mi |
Pantex | Amarillo, TX | 19.4 GWh | 48.2 mi |
Plant X | Earth, TX | 660.3 GWh | 46.4 mi |
Route 66 Wind Plant | Panhandle, TX | 614.8 GWh | 46.2 mi |
Spinning Spur Wind II | Adrian, TX | 543.9 GWh | 50 mi |
Spinning Spur Wind LLC | Vegas, TX | 346.5 GWh | 33.4 mi |
Tolk | Muleshoe, TX | 2.0 TWh | 49.9 mi |
TX Hereford Wind | Hereford, TX | 734.6 GWh | 7.1 mi |
TX Jumbo Road Wind | Hereford, TX | 935.0 GWh | 11.9 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 7.9 GWh | 20.4 mi |
Wildorado Wind LLC | Vega, TX | 643.2 GWh | 38.8 mi |