Astoria Gas Turbines
31-01 20th Avenue, Astoria, NY 11105Plant Summary Information
Astoria Gas Turbines is ranked #64 out of 110 natural gas power plants in New York in terms of total annual net electricity generation.
Astoria Gas Turbines is comprised of 12 generators and generated 7.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Astoria Gas Turbines |
---|---|
Utility Name | NRG Astoria Gas Turbine Operations Inc |
Location | Queens County, NY |
Initial Operation Date | January 1970 |
Last Update | Dec 2022 |
Annual Generation | 51.2 GWh |
Annual Consumption | 739.5 k MMBtu |
Ranked #3,782 out of 11,249 Power Plants Nationwide | |
Ranked #1,151 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #142 out of 748 New York Power Plants | |
Ranked #64 out of 110 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 85.6% Kerosene : 14.4% |
Map of Astoria Gas Turbines
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Astoria Gas Turbines.
Monthly Net Generation for Astoria Gas Turbines
Astoria Gas Turbines Details
Summary Information | |
---|---|
Plant Name | Astoria Gas Turbines (55243) |
Plant Address | 31-01 20th Avenue Astoria, NY 11105 |
Utility | NRG Astoria Gas Turbine Operations Inc (13582) |
Latitude, Longitude | 40.787, -73.9048 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | January 1970 |
Annual Generation | 51.2 GWh |
Fuel Types | Natural Gas : 85.6% Kerosene : 14.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-167-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Consolidated Edison Co-NY Inc |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 2-1 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24094 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24094 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 34.9 MW |
Winter Capacity | 46.5 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 34.8 MW |
Net Winter Capacity With Natural Gas | 46.4 MW |
Net Summer Capacity With Oil | 34.8 MW |
Net Winter Capacity With Oil | 46.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2-2 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24095 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24095 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 34.3 MW |
Winter Capacity | 45.6 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 34.7 MW |
Net Winter Capacity With Natural Gas | 45.1 MW |
Net Summer Capacity With Oil | 34.7 MW |
Net Winter Capacity With Oil | 45.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2-3 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24096 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24096 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36.3 MW |
Winter Capacity | 46.7 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 36.7 MW |
Net Winter Capacity With Natural Gas | 46.5 MW |
Net Summer Capacity With Oil | 36.7 MW |
Net Winter Capacity With Oil | 46.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2-4 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24097 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24097 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 32.5 MW |
Winter Capacity | 45.4 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 35.4 MW |
Net Winter Capacity With Natural Gas | 45.7 MW |
Net Summer Capacity With Oil | 35.4 MW |
Net Winter Capacity With Oil | 45.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3-1 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24098 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24098 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 34.6 MW |
Winter Capacity | 45 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 35.5 MW |
Net Winter Capacity With Natural Gas | 45.8 MW |
Net Summer Capacity With Oil | 35.5 MW |
Net Winter Capacity With Oil | 45.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3-2 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24099 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24099 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 35.7 MW |
Winter Capacity | 45.3 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 35.7 MW |
Net Winter Capacity With Natural Gas | 45.7 MW |
Net Summer Capacity With Oil | 35.7 MW |
Net Winter Capacity With Oil | 45.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3-3 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24100 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24100 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 33.9 MW |
Winter Capacity | 44.6 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 34 MW |
Net Winter Capacity With Natural Gas | 45.2 MW |
Net Summer Capacity With Oil | 34 MW |
Net Winter Capacity With Oil | 45.2 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3-4 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24101 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24101 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 34.9 MW |
Winter Capacity | 45.5 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 35.3 MW |
Net Winter Capacity With Natural Gas | 46.1 MW |
Net Summer Capacity With Oil | 35.3 MW |
Net Winter Capacity With Oil | 46.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4-1 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24102 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24102 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 33.6 MW |
Winter Capacity | 43.8 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 33.8 MW |
Net Winter Capacity With Natural Gas | 43.9 MW |
Net Summer Capacity With Oil | 33.8 MW |
Net Winter Capacity With Oil | 43.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4-2 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24103 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24103 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 34.3 MW |
Winter Capacity | 44.3 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 34.3 MW |
Net Winter Capacity With Natural Gas | 44.9 MW |
Net Summer Capacity With Oil | 34.3 MW |
Net Winter Capacity With Oil | 44.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4-3 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24104 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24104 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 35.4 MW |
Winter Capacity | 46.4 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 35.3 MW |
Net Winter Capacity With Natural Gas | 46.3 MW |
Net Summer Capacity With Oil | 35.3 MW |
Net Winter Capacity With Oil | 46.3 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4-4 Details Operating January 1970
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24105 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24105 |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 35.2 MW |
Winter Capacity | 44.1 MW |
Minimum Load | 18.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Planned Retirement | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 34.9 MW |
Net Winter Capacity With Natural Gas | 45.2 MW |
Net Summer Capacity With Oil | 34.9 MW |
Net Winter Capacity With Oil | 45.2 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Astoria Gas Turbines Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1141 | Erving Paper Mills | Erving, MA | 46.2 GWh |
#1142 | South Energy Center | Gainesville, FL | 45.5 GWh |
#1143 | Cymric 6Z Cogen | McKittrick, CA | 45.1 GWh |
#1144 | Total Energy Facilities | Carson, CA | 172.2 GWh |
#1145 | High Sierra Limited | Bakersfield, CA | 44.9 GWh |
#1146 | Arizona State University CHP | Tempe, AZ | 44.6 GWh |
#1147 | Grand Ave Plant | Kansas City, MO | 44.4 GWh |
#1148 | Allegany Cogen | Fillmore, NY | 44.2 GWh |
#1149 | Bear Mountain Limited | Bakersfield, CA | 43.9 GWh |
#1150 | Indigo Energy Facility | North Palm Springs, CA | 43.9 GWh |
#1152 | Waterbury Generation | Waterbury, CT | 43.7 GWh |
#1153 | Cutrale Citrus Juices USA II | Auburndale, FL | 43.5 GWh |
#1154 | Tilton | Tilton, IL | 43.5 GWh |
#1155 | Double C Generation Limited Partnership | Bakersfield, CA | 43.4 GWh |
#1156 | Montclair State University Cogen | Little Falls, NJ | 43.4 GWh |
#1157 | UA Central Utility Plant | Fayetteville, AR | 43.0 GWh |
#1158 | Chalk Cliff Limited | Bakersfield, CA | 43.0 GWh |
#1159 | BYUI Central Energy Facility | Rexburg, ID | 43.0 GWh |
#1160 | Adkins Energy LLC | Lena, IL | 42.8 GWh |
#1161 | Kaiser Napa Valley Corporate Dr Fuel Cell | Napa, CA | 42.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Astoria Gas Turbines.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
500MW CC | Astoria, NY | 3.8 TWh | 0.2 mi |
59th Street | New York, NY | 309.8 MWh | 4.6 mi |
74th Street | New York, NY | 308.7 MWh | 2.8 mi |
Astoria Energy | New York, NY | 4.6 TWh | 0.5 mi |
Astoria Energy II | Astoria, NY | 4.3 TWh | 0.6 mi |
Astoria Generating Station | Astoria, NY | 828.8 GWh | 0.4 mi |
Bronx Zoo | New York, NY | 19.3 GWh | 4.2 mi |
Harlem River Yard | Bronx, NY | 121.1 GWh | 1 mi |
Hell Gate | Bronx, NY | 116.2 GWh | 0.9 mi |
Hilton NY Co Gen Plant | New York City, NY | 5.3 GWh | 4.2 mi |
MER Queens | Elmhurst, NY | 9.0 GWh | 4 mi |
Mount Sinai Hospital | New York, NY | 302.3 MWh | 2.6 mi |
New York Presbyterian Hospital-168th St | New York, NY | 90.0 MWh | 4.2 mi |
New York University Central Plant | New York, NY | 81.1 GWh | 1 mi |
NY - PANYNJ - LaGuardia - Rooftop | Queens, NY | 732.0 MWh | 1.8 mi |
NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 66.0 GWh | 3 mi |
NY Times Daily Production Facility | Flushing, NY | 88.2 MWh | 3.9 mi |
NYU LANGONE HEALTH | New York, NY | 56.1 GWh | 4.5 mi |
Ravenswood | Long Island, NY | 2.9 TWh | 2.9 mi |
Vernon Boulevard | Long Island City, NY | 129.9 GWh | 3.3 mi |