Astoria Energy II
17-10 Steinway Street, Astoria, NY 11105Plant Summary Information
Astoria Energy II is ranked #10 out of 748 power plants in New York in terms of total annual net electricity generation.
Astoria Energy II is comprised of 3 generators and generated 1.3 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | Astoria Energy II |
---|---|
Utility Name | Astoria Energy II LLC |
Location | Queens County, NY |
Initial Operation Date | July 2011 |
Last Update | Mar 2024 |
Annual Generation | 4.3 TWh |
Annual Consumption | 31.0 M MMBtu |
Ranked #274 out of 11,249 Power Plants Nationwide | |
Ranked #150 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #10 out of 748 New York Power Plants | |
Ranked #5 out of 110 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.7% |
Map of Astoria Energy II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Astoria Energy II.
Monthly Net Generation for Astoria Energy II
Astoria Energy II Details
Summary Information | |
---|---|
Plant Name | Astoria Energy II (57664) |
Plant Address | 17-10 Steinway Street Astoria, NY 11105 |
Utility | Astoria Energy II LLC (56991) |
Latitude, Longitude | 40.78132, -73.89662 |
Generation Dates on File | Jul 2011 to Mar 2024 |
Initial Operation Date | July 2011 |
Annual Generation | 4.3 TWh |
Fuel Types | Natural Gas : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-335-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | N/A Airr Cooled |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CT3 Details Operating July 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 323667 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323667 |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 156 MW |
Winter Capacity | 188 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 156 MW |
Net Winter Capacity With Natural Gas | 188 MW |
Net Summer Capacity With Oil | 156 MW |
Net Winter Capacity With Oil | 188 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT4 Details Operating July 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 323667 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323667 |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 156 MW |
Winter Capacity | 188 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 156 MW |
Net Winter Capacity With Natural Gas | 188 MW |
Net Summer Capacity With Oil | 156 MW |
Net Winter Capacity With Oil | 188 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ST2 Details Operating July 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | 323668 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 323668 |
Nameplate Capacity | 250 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 228 MW |
Winter Capacity | 236 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Astoria Energy II Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#140 | John Sevier | Rogersville, TN | 4.5 TWh |
#141 | Rio Nogales Power Project | Seguin, TX | 4.5 TWh |
#142 | Cane Island | Intercession City, FL | 4.5 TWh |
#143 | High Desert Power Plant | Victorville, CA | 4.5 TWh |
#144 | Dearborn Industrial Generation | Dearborn, MI | 5.9 TWh |
#145 | Tenaska Frontier Generation Station | Shiro, TX | 4.5 TWh |
#146 | Pastoria Energy Facility, LLC | Lebec, CA | 4.4 TWh |
#147 | Dresden Energy Facility | Dresden, OH | 4.4 TWh |
#148 | Woodbridge Energy Center | Keasbey, NJ | 4.3 TWh |
#149 | Green Country Energy LLC | Jenks, OK | 4.3 TWh |
#151 | Liberty Electric Power Plant | Eddystone, PA | 4.3 TWh |
#152 | Newark Energy Center | Newark, NJ | 4.3 TWh |
#153 | Hermiston Power Partnership | Hermiston, OR | 4.3 TWh |
#154 | Wildcat Point Generation Facility | Conowingo, MD | 4.3 TWh |
#155 | L V Sutton Combined Cycle | Wilmington, NC | 4.3 TWh |
#156 | CPV St Charles Energy Center | Waldorf, MD | 4.3 TWh |
#157 | Magnet Cove | Malvern, AR | 4.2 TWh |
#158 | Long Ridge Energy Generation | Hannibal, OH | 4.2 TWh |
#159 | Bethlehem Energy Center | Glenmont, NY | 4.2 TWh |
#160 | Lansing Smith | Southport, FL | 4.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Astoria Energy II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
500MW CC | Astoria, NY | 3.8 TWh | 0.8 mi |
74th Street | New York, NY | 308.7 MWh | 3 mi |
Astoria Energy | New York, NY | 4.6 TWh | 0.1 mi |
Astoria Gas Turbines | Astoria, NY | 51.2 GWh | 0.6 mi |
Astoria Generating Station | Astoria, NY | 828.8 GWh | 0.9 mi |
Bronx Zoo | New York, NY | 19.3 GWh | 4.5 mi |
Harlem River Yard | Bronx, NY | 121.1 GWh | 1.6 mi |
Hell Gate | Bronx, NY | 116.2 GWh | 1.4 mi |
Hilton NY Co Gen Plant | New York City, NY | 5.3 GWh | 4.5 mi |
MER Queens | Elmhurst, NY | 9.0 GWh | 3.5 mi |
Mount Sinai Hospital | New York, NY | 302.3 MWh | 3 mi |
New York Presbyterian Hospital-168th St | New York, NY | 90.0 MWh | 4.7 mi |
New York University Central Plant | New York, NY | 81.1 GWh | 1.5 mi |
NY - PANYNJ - LaGuardia - Rooftop | Queens, NY | 732.0 MWh | 1.3 mi |
NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 66.0 GWh | 3.2 mi |
NY Times Daily Production Facility | Flushing, NY | 88.2 MWh | 3.5 mi |
NYPH-Queens | Flushing, NY | 58.9 MWh | 4.3 mi |
NYU LANGONE HEALTH | New York, NY | 56.1 GWh | 4.6 mi |
Ravenswood | Long Island, NY | 2.9 TWh | 3 mi |
Vernon Boulevard | Long Island City, NY | 129.9 GWh | 3.4 mi |