N. Byron Road, Venice Township, MI 48449Plant Summary Information
Assembly Solar Project is ranked #4 out of 43 solar farms in Michigan in terms of total annual net electricity generation.
Assembly Solar Project generated 18.7 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Assembly Solar Project |
---|---|
Utility Name | Assembly Solar I, LLC |
Location | Shiawassee County, MI |
Initial Operation Date | December 2020 |
Last Update | Mar 2024 |
Annual Generation | 107.7 GWh |
Annual Consumption | 367.6 k MMBtu |
Ranked #3,039 out of 11,249 Power Plants Nationwide | |
Ranked #495 out of 5,158 Solar Power Plants Nationwide | |
Ranked #78 out of 242 Michigan Power Plants | |
Ranked #4 out of 43 Michigan Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Assembly Solar, LLC (2018 to 2018) Assembly Solar I, LLC (2019 to 2022) |
Map of Assembly Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Assembly Solar Project.
Monthly Net Generation for Assembly Solar Project
Assembly Solar Project Details
Summary Information | |
---|---|
Plant Name | Assembly Solar Project (62422) |
Plant Address | N. Byron Road Venice Township, MI 48449 |
Utility | Assembly Solar I, LLC (61949) |
Latitude, Longitude | 43.02268, -83.94527 |
Generation Dates on File | Dec 2020 to Mar 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 107.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Michigan Electric Transmission Company (56163) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator ASP01 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 72 MW |
Crystalline Silicon | Yes |
Other Materials | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Assembly Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#485 | Airport Solar | Lakeview, OR | 111.6 GWh |
#486 | Hawtree Solar | Warrenton, NC | 111.2 GWh |
#487 | Brightside | Beeville, TX | 111.2 GWh |
#488 | Marshall Solar Energy Project | Marshall, MN | 111.2 GWh |
#489 | Monroe Solar Facility | Monroe, NC | 110.6 GWh |
#490 | Brantley Solar | Spring Hope, NC | 109.9 GWh |
#491 | Hooper Solar | Mosca, CO | 109.8 GWh |
#492 | Bullock Solar, LLC | Manson, NC | 109.1 GWh |
#493 | Titan Solar | Deer Trail, CO | 108.4 GWh |
#494 | RE Gaskell West 2 LLC | Rosamond, CA | 108.2 GWh |
#496 | Stanly Solar, LLC | Albemarle, NC | 107.7 GWh |
#497 | Kayenta Solar Project | Kayenta, AZ | 107.5 GWh |
#498 | Innovative Solar 54 | Kinston, NC | 107.4 GWh |
#499 | Pavant Solar, LLC | Fillmore, UT | 106.6 GWh |
#500 | Elevation Solar C | Lancaster, CA | 106.1 GWh |
#501 | Eastover Solar | Eastover, SC | 105.9 GWh |
#502 | Grange Hall Solar | Wimauma, FL | 105.7 GWh |
#503 | Edwards Sanborn S1 | Mojave, CA | 102.8 GWh |
#504 | Meherrin Solar | Skippers, VA | 105.5 GWh |
#505 | Pearl Solar | Fort Stockton, TX | 105.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Assembly Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar II LLC | Lennon, MI | 236.1 GWh | 1.6 mi |
Assembly Solar III | Lennon, MI | 163.8 GWh | 0.1 mi |
Bingham Solar, LLC | St. Johns, MI | 40.7 GWh | 29.4 mi |
Brent Run Generating Station | Montrose, MI | 49.3 GWh | 11.7 mi |
Captain Solar, LLC | Mt. Morris, MI | 4.0 GWh | 9.9 mi |
Coldwater Solar, LLC | Flint, MI | 3.8 GWh | 9.8 mi |
Colfax | Fowlerville, MI | 61.0 MWh | 26.3 mi |
Demille Solar Farm | Lapeer, MI | 38.5 GWh | 30.9 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.2 GWh | 29.7 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 4.2 GWh | 29.3 mi |
Genesee Power Station LP | Flint, MI | 169.4 GWh | 14.6 mi |
Grand Blanc Generating Station | Grand Blanc, MI | 57.0 GWh | 13.6 mi |
Interchange Solar, LLC | Mt. Morris, MI | 4.0 GWh | 10.3 mi |
Jack Francis Solar, LLC | Clio, MI | 4.1 GWh | 16 mi |
Lennon Generating | Lennon, MI | 33.3 GWh | 3.3 mi |
Lyons Road | Owosso, MI | 36.7 GWh | 10.7 mi |
May Shannon Solar, LLC | Clio, MI | 4.0 GWh | 15.6 mi |
Peoples Generating Station | Ann Arbor, MI | 26.4 GWh | 18.2 mi |
Turrill Solar Farm | Lapeer, MI | 23.7 GWh | 32.2 mi |
Venice Resources Gas Recovery | Lennon, MI | 10.9 GWh | 3 mi |