Assembly Solar Project
N. Byron Road, Venice Township, MI 48449Plant Summary Information
Assembly Solar Project is ranked #5 out of 57 solar farms in Michigan in terms of total annual net electricity generation.
Assembly Solar Project generated 9.8 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Assembly Solar Project |
---|---|
Utility Name | Assembly Solar I, LLC |
Location | Shiawassee County, MI |
Initial Operation Date | December 2020 |
Last Update | Jan 2025 |
Annual Generation | 104.2 GWh |
Annual Consumption | 363.5 k MMBtu |
Ranked #3,200 out of 11,979 Power Plants Nationwide | |
Ranked #638 out of 5,765 Solar Power Plants Nationwide | |
Ranked #77 out of 258 Michigan Power Plants | |
Ranked #5 out of 57 Michigan Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Assembly Solar, LLC (2018 to 2018) Assembly Solar I, LLC (2019 to 2023) |
Map of Assembly Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Assembly Solar Project.
Monthly Net Generation for Assembly Solar Project
Assembly Solar Project Details
Summary Information | |
---|---|
Plant Name | Assembly Solar Project (62422) |
Plant Address | N. Byron Road, Venice Township, MI 48449 |
Utility | Assembly Solar I, LLC (61949) |
Latitude, Longitude | 43.02268, -83.94527 |
Generation Dates on File | Dec 2020 to Jan 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 104.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Michigan Electric Transmission Company (56163) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator ASP01 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 72 MW |
Crystalline Silicon | Yes |
Other Materials | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Assembly Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#628 | Pitts Dudik Solar | Hubbard, TX | 106.8 GWh |
#629 | Iris Solar LLC | Franklinton, LA | 106.7 GWh |
#630 | Three Corners Solar | Unity, ME | 106.3 GWh |
#631 | Sugar Solar, LLC | Yadkinville, NC | 106.2 GWh |
#632 | Salt City Solar Project - Hybrid | Circleville, OH | 106.0 GWh |
#633 | Grange Hall Solar | Wimauma, FL | 105.5 GWh |
#634 | Mountain View Solar (FL) | Dade City, FL | 105.3 GWh |
#635 | Bladen Solar | Fayetteville, NC | 104.3 GWh |
#636 | Riverside Solar | Ruskin, FL | 104.3 GWh |
#637 | Airport Solar | Lakeview, OR | 104.2 GWh |
#639 | Brittlebush Solar | Coolidge, AZ | 103.4 GWh |
#640 | Stampede Solar Hybrid | Saltillo, TX | 101.3 GWh |
#641 | Highest Power Solar, LLC | Louisburg, NC | 102.9 GWh |
#642 | Pavant Solar II LLC | Fillmore, UT | 102.4 GWh |
#643 | Bullock Solar, LLC | Manson, NC | 102.2 GWh |
#644 | Great Cove Solar II | Saint Thomas, PA | 102.2 GWh |
#645 | Five Points Solar Park | Five Points, CA | 102.0 GWh |
#646 | Pearl Solar | Fort Stockton, TX | 101.8 GWh |
#647 | Foothills Solar Plant Hybrid | Yuma, AZ | 101.5 GWh |
#648 | Brantley Solar | Spring Hope, NC | 101.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Assembly Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar II LLC | Lennon, MI | 227.8 GWh | 1.6 mi |
Assembly Solar III | Lennon, MI | 164.0 GWh | 0.1 mi |
Bingham Solar, LLC | St. Johns, MI | 38.4 GWh | 29.4 mi |
Blue Elk VII Solar, LLC | Flint, MI | 474.0 MWh | 19.6 mi |
Brent Run Generating Station | Montrose, MI | 43.4 GWh | 11.7 mi |
Captain Solar, LLC | Mt. Morris, MI | 3.7 GWh | 9.9 mi |
Coldwater Solar, LLC | Flint, MI | 3.4 GWh | 9.8 mi |
Demille Solar Farm | Lapeer, MI | 35.9 GWh | 30.9 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.0 GWh | 29.7 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 3.9 GWh | 29.3 mi |
Genesee Power Station LP | Flint, MI | 114.8 GWh | 14.6 mi |
Grand Blanc Generating Station | Grand Blanc, MI | 51.4 GWh | 13.6 mi |
Interchange Solar, LLC | Mt. Morris, MI | 3.6 GWh | 10.3 mi |
Jack Francis Solar, LLC | Clio, MI | 3.8 GWh | 16 mi |
Lennon Generating | Lennon, MI | 27.3 GWh | 3.3 mi |
Lyons Road | Owosso, MI | 36.9 GWh | 10.7 mi |
May Shannon Solar, LLC | Clio, MI | 3.8 GWh | 15.6 mi |
Midcontinent Solar, LLC | Owosso, MI | 795.0 MWh | 11.3 mi |
Peoples Generating Station | Ann Arbor, MI | 17.1 GWh | 18.2 mi |
Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh | 3 mi |