Assembly Solar III
10400 Cronk Rd., Lennon, MI 48449Plant Summary Information
Assembly Solar III is ranked #3 out of 43 solar farms in Michigan in terms of total annual net electricity generation.
Assembly Solar III generated 28.2 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Assembly Solar III |
---|---|
Utility Name | Assembly Solar III, LLC |
Location | Shiawassee County, MI |
Initial Operation Date | January 2022 |
Last Update | Mar 2024 |
Annual Generation | 163.8 GWh |
Annual Consumption | 558.9 k MMBtu |
Ranked #2,553 out of 11,249 Power Plants Nationwide | |
Ranked #314 out of 5,158 Solar Power Plants Nationwide | |
Ranked #65 out of 242 Michigan Power Plants | |
Ranked #3 out of 43 Michigan Solar Power Plants | |
Fuel Types | Solar |
Map of Assembly Solar III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Assembly Solar III.
Monthly Net Generation for Assembly Solar III
Assembly Solar III Details
Summary Information | |
---|---|
Plant Name | Assembly Solar III (64196) |
Plant Address | 10400 Cronk Rd. Lennon, MI 48449 |
Utility | Assembly Solar III, LLC (63813) |
Latitude, Longitude | 43.02271, -83.94273 |
Generation Dates on File | Jan 2022 to Mar 2024 |
Initial Operation Date | January 2022 |
Annual Generation | 163.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Michigan Electric Transmission Company, (56163) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator AS3 Details Operating January 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 79 MW |
Summer Capacity | 79 MW |
Winter Capacity | 79 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 114.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Assembly Solar III Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#304 | Bluefield Preserve Solar | Okeechobee, FL | 167.0 GWh |
#305 | River Bend Solar, LLC | Florence, AL | 166.9 GWh |
#306 | Huntley | Bowman, SC | 166.0 GWh |
#307 | Rodeo Solar Center | Arcadia, FL | 165.9 GWh |
#308 | Colgreen North Shore Solar Farm | Mecca, CA | 165.8 GWh |
#309 | Grove | Vero Beach, FL | 165.5 GWh |
#310 | Okeechobee Solar | Vero Beach, FL | 165.4 GWh |
#311 | Blue Heron Solar | Clewiston, FL | 165.3 GWh |
#312 | Sundew | Port St Lucie, FL | 164.9 GWh |
#313 | Regulus Solar Project | Bakersfield, CA | 164.7 GWh |
#315 | Apalachee | Marianna, FL | 163.2 GWh |
#316 | Babcock Preserve | Punta Gorda, FL | 162.7 GWh |
#317 | Indian River Solar Center | Vero Beach, FL | 162.5 GWh |
#318 | Union Springs Solar Center | Lake Butler, FL | 162.5 GWh |
#319 | Barefoot Bay Solar Energy Center | Sebastian, FL | 162.2 GWh |
#320 | Bay Tree | Harrells, NC | 162.0 GWh |
#321 | Magnolia Springs Solar Center | Green Cove Springs, FL | 161.6 GWh |
#322 | Gutenberg Solar | Garysburg, NC | 161.5 GWh |
#323 | Hibiscus Solar Energy Center | Westlake, FL | 161.3 GWh |
#324 | Hammock Solar | Labelle, FL | 160.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Assembly Solar III.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar II LLC | Lennon, MI | 236.1 GWh | 1.7 mi |
Assembly Solar Project | Venice Township, MI | 107.7 GWh | 0.1 mi |
Bingham Solar, LLC | St. Johns, MI | 40.7 GWh | 29.6 mi |
Brent Run Generating Station | Montrose, MI | 49.3 GWh | 11.6 mi |
Captain Solar, LLC | Mt. Morris, MI | 4.0 GWh | 9.7 mi |
Coldwater Solar, LLC | Flint, MI | 3.8 GWh | 9.7 mi |
Colfax | Fowlerville, MI | 61.0 MWh | 26.3 mi |
Demille Solar Farm | Lapeer, MI | 38.5 GWh | 30.8 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.2 GWh | 29.8 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 4.2 GWh | 29.4 mi |
Genesee Power Station LP | Flint, MI | 169.4 GWh | 14.5 mi |
Grand Blanc Generating Station | Grand Blanc, MI | 57.0 GWh | 13.5 mi |
Interchange Solar, LLC | Mt. Morris, MI | 4.0 GWh | 10.2 mi |
Jack Francis Solar, LLC | Clio, MI | 4.1 GWh | 15.9 mi |
Lennon Generating | Lennon, MI | 33.3 GWh | 3.4 mi |
Lyons Road | Owosso, MI | 36.7 GWh | 10.9 mi |
May Shannon Solar, LLC | Clio, MI | 4.0 GWh | 15.5 mi |
Peoples Generating Station | Ann Arbor, MI | 26.4 GWh | 18.2 mi |
Turrill Solar Farm | Lapeer, MI | 23.7 GWh | 32 mi |
Venice Resources Gas Recovery | Lennon, MI | 10.9 GWh | 3.1 mi |