Assembly Solar II LLC
10125 E Cronk Road, Lennon, MI 48449Plant Summary Information
Assembly Solar II LLC is ranked #2 out of 57 solar farms in Michigan in terms of total annual net electricity generation.
Assembly Solar II LLC generated 21.9 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Assembly Solar II LLC |
---|---|
Utility Name | Assembly Solar II LLC |
Location | Shiawassee County, MI |
Initial Operation Date | December 2021 |
Last Update | Jan 2025 |
Annual Generation | 227.8 GWh |
Annual Consumption | 796.4 k MMBtu |
Ranked #2,204 out of 11,979 Power Plants Nationwide | |
Ranked #258 out of 5,765 Solar Power Plants Nationwide | |
Ranked #51 out of 258 Michigan Power Plants | |
Ranked #2 out of 57 Michigan Solar Power Plants | |
Fuel Types | Solar |
Map of Assembly Solar II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Assembly Solar II LLC.
Monthly Net Generation for Assembly Solar II LLC
Assembly Solar II LLC Details
Summary Information | |
---|---|
Plant Name | Assembly Solar II LLC (63538) |
Plant Address | 10125 E Cronk Road, Lennon, MI 48449 |
Utility | Assembly Solar II LLC (63253) |
Latitude, Longitude | 43.04372, -83.95998 |
Generation Dates on File | Dec 2021 to Jan 2025 |
Initial Operation Date | December 2021 |
Annual Generation | 227.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Michigan Electric Transmission Company, (56163) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator AS2 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 110 MW |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 161.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Assembly Solar II LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#248 | SR Clay, LLC | Fort Gaines, GA | 235.6 GWh |
#249 | Henrietta Solar Project | Lemoore, CA | 234.2 GWh |
#250 | West of the Pecos Solar | TBD, TX | 233.7 GWh |
#251 | North Fork Solar Project | Snyder, OK | 233.2 GWh |
#252 | Enterprise Solar, LLC | Newcastle, UT | 232.3 GWh |
#253 | Dressor Plains Solar, LLC | Herrick, IL | 231.9 GWh |
#254 | Briar Creek Solar 1 | Corsicana, TX | 231.7 GWh |
#255 | CA Flats Solar 130, LLC | Shandon, CA | 231.4 GWh |
#256 | Galloway 2 Solar Farm | Paint Rock, TX | 231.0 GWh |
#257 | Rowland Solar II | Richmond, TX | 228.8 GWh |
#259 | Chesapeake Solar Project | Chesapeake, VA | 227.3 GWh |
#260 | Lockhart Solar PV, LLC | Hinkley, CA | 226.3 GWh |
#261 | SR Lumpkin | Lumpkin, GA | 225.9 GWh |
#262 | Wapello Solar LLC | Wapello, IA | 225.1 GWh |
#263 | OE_MS6 | St.Artesia, MS | 220.4 GWh |
#264 | RE Astoria | Rosamond, CA | 220.9 GWh |
#265 | Orion I Solar Project | Burlington, TX | 218.2 GWh |
#266 | Albemarle Beach Solar | Roper, NC | 217.7 GWh |
#267 | Greasewood II LLC | Girvin, TX | 217.4 GWh |
#268 | Black Bear Solar 1 | Montgomery, AL | 216.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Assembly Solar II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar III | Lennon, MI | 164.0 GWh | 1.7 mi |
Assembly Solar Project | Venice Township, MI | 104.2 GWh | 1.6 mi |
Beebe 1B | Ithaca, MI | 119.0 GWh | 30.9 mi |
Bingham Solar, LLC | St. Johns, MI | 38.4 GWh | 28.8 mi |
Blue Elk VII Solar, LLC | Flint, MI | 474.0 MWh | 20 mi |
Brent Run Generating Station | Montrose, MI | 43.4 GWh | 10.8 mi |
Captain Solar, LLC | Mt. Morris, MI | 3.7 GWh | 9.8 mi |
Coldwater Solar, LLC | Flint, MI | 3.4 GWh | 9.8 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.0 GWh | 28.1 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 3.9 GWh | 27.7 mi |
Genesee Power Station LP | Flint, MI | 114.8 GWh | 14.9 mi |
Grand Blanc Generating Station | Grand Blanc, MI | 51.4 GWh | 15.1 mi |
Interchange Solar, LLC | Mt. Morris, MI | 3.6 GWh | 10.3 mi |
Jack Francis Solar, LLC | Clio, MI | 3.8 GWh | 15.9 mi |
Lennon Generating | Lennon, MI | 27.3 GWh | 4.4 mi |
Lyons Road | Owosso, MI | 36.9 GWh | 10.7 mi |
May Shannon Solar, LLC | Clio, MI | 3.8 GWh | 15.5 mi |
Midcontinent Solar, LLC | Owosso, MI | 795.0 MWh | 11.2 mi |
Peoples Generating Station | Ann Arbor, MI | 17.1 GWh | 17 mi |
Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh | 4.1 mi |