Ashtabula is ranked #48 out of 170 power plants in Ohio in terms of total annual net electricity generation.
Ashtabula is comprised of 7 generators and generated 58.6 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Ashtabula |
---|---|
Utility Name | DTE Ashtabula, LLC |
Location | Ashtabula County, OH |
Initial Operation Date | February 2001 |
Last Update | Mar 2024 |
Annual Generation | 185.5 GWh |
Annual Consumption | 3.3 M MMBtu |
Ranked #2,425 out of 11,249 Power Plants Nationwide | |
Ranked #763 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #48 out of 170 Ohio Power Plants | |
Ranked #24 out of 52 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Ashtabula
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ashtabula.
Monthly Net Generation for Ashtabula
Ashtabula Details
Summary Information | |
---|---|
Plant Name | Ashtabula (55990) |
Plant Address | 2700 Middle Road Ashtabula, OH 44004 |
Utility | DTE Ashtabula, LLC (58115) |
Latitude, Longitude | 41.89003, -80.7612 |
Generation Dates on File | Jan 2003 to Mar 2024 |
Initial Operation Date | February 2001 |
Annual Generation | 185.5 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 01-112-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Lake Erie |
Ash Impoundment | |
Transmission / Distribution Owner | Cleveland Electric Illum Co (3755) OH |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
Natural Gas Storage | No |
Generator 1 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 4.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 5.4 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 4.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 5.4 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 4.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 5.4 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 4.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 5.4 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 4.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 5.4 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating February 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ashtabula Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#753 | PE Berkeley | Berkeley, CA | 194.1 GWh |
#754 | Holden | Holden, MO | 195.9 GWh |
#755 | NIH Cogeneration Facility | Bethesda, MD | 192.4 GWh |
#756 | North Omaha | Omaha, NE | 1.6 TWh |
#757 | NAEA Ocean Peaking Power LLC | Lakewood, NJ | 190.9 GWh |
#758 | Belle River | China Twp, MI | 5.5 TWh |
#759 | Georgia-Pacific Monticello Paper | Monticello, MS | 473.3 GWh |
#760 | Exelon LaPorte Generating Station | LaPorte, TX | 188.8 GWh |
#761 | Culbertson Generation Station | Culbertson, MT | 187.6 GWh |
#762 | C R Wing Cogen Plant | Big Spring, TX | 186.9 GWh |
#764 | West Gardner | Johnson, KS | 181.6 GWh |
#765 | Kenilworth Energy Facility | Kenilworth, NJ | 179.9 GWh |
#766 | Groton Generation Station | Groton, SD | 179.4 GWh |
#767 | El Segundo Energy Center LLC | El Segundo, CA | 179.2 GWh |
#768 | Roquette America | Keokuk, IA | 180.5 GWh |
#769 | Celanese Acetate LLC | Narrows, VA | 175.5 GWh |
#770 | CF Industries Yazoo City Complex | Yazoo City, MS | 175.3 GWh |
#771 | Pinelawn Power LLC | West Babylon, NY | 174.2 GWh |
#772 | International Paper Prattville Mill | Prattville, AL | 684.2 GWh |
#773 | Valero Refinery Cogeneration Unit 1 | Benicia, CA | 250.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ashtabula.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arcelormittal Cleveland Inc | Cleveland, OH | 186.9 GWh | 55.1 mi |
Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.9 TWh | 51.4 mi |
Cleveland Peaking | Cleveland, OH | 106.0 MWh | 48.5 mi |
Cleveland Thermal | Cleveland, OH | 1.5 GWh | 54.3 mi |
Clevelandcliffs Warren | Warren, OH | 53.6 GWh | 46.9 mi |
Collinwood BioEnergy Facility | Cleveland, OH | 2.9 GWh | 48.6 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.5 GWh | 59.7 mi |
Euclid Farm, Stamco N-54 | Euclid, OH | 598.0 MWh | 42.8 mi |
General Electric Diesel Engine Plant | Grove City, PA | 4.1 GWh | 60.2 mi |
Geneva | Geneva, OH | 21.0 GWh | 10.1 mi |
Girard (PA) RTO BTM | Girard, PA | 84.0 MWh | 24 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 42.4 mi |
Lakeview Gas Recovery | Erie, PA | 38.5 GWh | 39.8 mi |
LE Wind Turbine 1 | Euclid, OH | 5.5 GWh | 44.7 mi |
Lordstown Motor Corp | Warren, OH | 1.8 GWh | 51.7 mi |
MCCo Solar Generating Facility | Cleveland, OH | 448.0 MWh | 50.3 mi |
Niles RTO BTM | Niles, OH | 308.0 MWh | 49.9 mi |
Painesville | Painesville, OH | 44.0 MWh | 27.8 mi |
Perry | Perry, OH | 10.2 TWh | 20.6 mi |
Summit Street Power Plant | Kent, OH | 32.4 GWh | 59.7 mi |