Asheville
200 CP&L Drive, Arden, NC 28704Plant Summary Information
Asheville is ranked #13 out of 863 power plants in North Carolina in terms of total annual net electricity generation.
Asheville is comprised of 6 generators and generated 1.0 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Asheville |
---|---|
Utility Name | Duke Energy Progress - (NC) |
Location | Buncombe County, NC |
Initial Operation Date | May 1964 |
Last Update | Sep 2024 |
Annual Generation | 4.0 TWh |
Annual Consumption | 29.5 M MMBtu |
Ranked #280 out of 11,852 Power Plants Nationwide | |
Ranked #156 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #13 out of 863 North Carolina Power Plants | |
Ranked #7 out of 30 North Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of Asheville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Asheville.
Monthly Net Generation for Asheville
Asheville Details
Summary Information | |
---|---|
Plant Name | Asheville (2706) |
Plant Address | 200 CP&L Drive, Arden, NC 28704 |
Utility | Duke Energy Progress - (NC) (3046) |
Latitude, Longitude | 35.4731, -82.5417 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | May 1964 |
Annual Generation | 4.0 TWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Julian (Powell Creek) |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PUBLIC SVC CO OF NORTH CAROLINA |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GT1 Details Operating June 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 211.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 160 MW |
Winter Capacity | 185 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 155 MW |
Net Summer Capacity With Oil | 160 MW |
Net Winter Capacity With Oil | 155 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator GT2 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 211.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 160 MW |
Winter Capacity | 185 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 185 MW |
Net Summer Capacity With Oil | 160 MW |
Net Winter Capacity With Oil | 185 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator CT5 Details Operating December 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 191.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 163 MW |
Winter Capacity | 190 MW |
Minimum Load | 158 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 153 MW |
Net Winter Capacity With Natural Gas | 190 MW |
Net Summer Capacity With Oil | 153 MW |
Net Winter Capacity With Oil | 190 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ST6 Details Operating December 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 102.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 85 MW |
Winter Capacity | 90 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 85 MW |
Net Winter Capacity With Natural Gas | 90 MW |
Net Summer Capacity With Oil | 85 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT7 Details Operating January 2020
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 191.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 161 MW |
Winter Capacity | 190 MW |
Minimum Load | 158 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 153 MW |
Net Winter Capacity With Natural Gas | 190 MW |
Net Summer Capacity With Oil | 153 MW |
Net Winter Capacity With Oil | 190 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ST8 Details Operating April 2020
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC2 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 102.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 85 MW |
Winter Capacity | 90 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 85 MW |
Net Winter Capacity With Natural Gas | 90 MW |
Net Summer Capacity With Oil | 85 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Asheville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#146 | Pastoria Energy Facility, LLC | Lebec, CA | 4.1 TWh |
#147 | Astoria Energy II | Astoria, NY | 4.1 TWh |
#148 | Woodbridge Energy Center | Keasbey, NJ | 4.1 TWh |
#149 | John S Rainey | Starr, SC | 4.1 TWh |
#150 | Green Country Energy LLC | Jenks, OK | 4.1 TWh |
#151 | Dell Power Station | Dell, AR | 4.1 TWh |
#152 | Delta Energy Center | Pittsburg, CA | 4.1 TWh |
#153 | Tenaska Frontier Generation Station | Shiro, TX | 4.0 TWh |
#154 | Tracy | Sparks, NV | 4.0 TWh |
#155 | L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh |
#157 | Hermiston Power Partnership | Hermiston, OR | 4.0 TWh |
#158 | John Sevier | Rogersville, TN | 4.0 TWh |
#159 | Perryville Power Station | Sterlington, LA | 3.9 TWh |
#160 | Zeltmann | Astoria, NY | 3.9 TWh |
#161 | Dan River | Eden, NC | 3.9 TWh |
#162 | CPV St Charles Energy Center | Waldorf, MD | 3.9 TWh |
#163 | Lansing Smith | Southport, FL | 3.9 TWh |
#164 | Green Power 2 | Texas City, TX | 3.8 TWh |
#165 | Wise County Power LLC | Poolville, TX | 3.8 TWh |
#166 | Bethlehem Energy Center | Glenmont, NY | 3.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Asheville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amethyst Solar | Forest City, NC | 5.9 GWh | 36.3 mi |
Ballenger Road Solar A | Inman, SC | 4.3 GWh | 38.3 mi |
Biltmore Solar Fields | Asheville, NC | 385.0 MWh | 6.6 mi |
Canton North Carolina | Canton, NC | 281.5 GWh | 17.4 mi |
Cedar Cliff | Tuckasegee, NC | 9.9 GWh | 34.9 mi |
Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 1.9 GWh | 32.9 mi |
Innovative Solar 10 | Canton, NC | 2.6 GWh | 19.6 mi |
Innovative Solar 14, LLC | Hendersonville, NC | 3.2 GWh | 12.6 mi |
Innovative Solar 16 | Hendersonville, NC | 3.3 GWh | 13.2 mi |
Innovative Solar 6 | Leicester, NC | 6.5 GWh | 15.9 mi |
Lake Lure | Lake Lure, NC | 3.2 GWh | 20.4 mi |
Metropolitan Sewerage District | Asheville, NC | 6.7 GWh | 12.6 mi |
Sawtell Solar | Hendersonville, NC | 5.9 GWh | 11.3 mi |
Tennessee Creek | Tuckasegee, NC | 24.8 GWh | 31.6 mi |
Thorpe | Tuckasegee, NC | 55.4 GWh | 36.8 mi |
Tuckasegee | Tuckasegee, NC | 4.8 GWh | 36.5 mi |
Turner Shoals | Mill Springs, NC | 11.0 GWh | 22.2 mi |
Tuxedo | Flat Rock, NC | 16.8 GWh | 17.9 mi |
Walters | Waterville, NC | 321.0 GWh | 32.4 mi |
Wellford Renewable Energy Plant | Spartanburg, SC | 79.0 MWh | 40 mi |