Arthur 2 Solar
154199 US 701, Tabor City, NC 28463Plant Summary Information
Arthur 2 Solar is ranked #491 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Arthur 2 Solar generated 1.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Arthur 2 Solar |
---|---|
Utility Name | Arthur Solar 2, LLC |
Location | Columbus County, NC |
Initial Operation Date | March 2023 |
Last Update | Dec 2023 |
Annual Generation | 7.3 GWh |
Annual Consumption | 25.0 k MMBtu |
Ranked #6,836 out of 11,835 Power Plants Nationwide | |
Ranked #2,223 out of 5,643 Solar Power Plants Nationwide | |
Ranked #570 out of 862 North Carolina Power Plants | |
Ranked #491 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Arthur 2 Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arthur 2 Solar.
Monthly Net Generation for Arthur 2 Solar
Arthur 2 Solar Details
Summary Information | |
---|---|
Plant Name | Arthur 2 Solar (66605) |
Plant Address | 154199 US 701, Tabor City, NC 28463 |
Utility | Arthur Solar 2, LLC (65638) |
Latitude, Longitude | 34.17295, -78.89158 |
Generation Dates on File | Mar 2023 to Dec 2023 |
Initial Operation Date | March 2023 |
Annual Generation | 7.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-78-(000,001,002,003,004,005,006) |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 24.00 kV |
Energy Storage | No |
Generator ARTH2 Details Operating March 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 6.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Arthur 2 Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2213 | Rollingstone Holdco CSG | Rollingstone, MN | 7.4 GWh |
#2214 | East Nash PV2 | Spring Hope, NC | 7.4 GWh |
#2215 | Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.4 GWh |
#2216 | Iron Horse Solar 4, LLC | North Billerica, MA | 7.4 GWh |
#2217 | North Eagle Village Solar | Manilus, NY | 7.4 GWh |
#2218 | Quichapa 2 | Cedar City, UT | 7.4 GWh |
#2219 | Everetts Wildcat Solar, LLC | Williamston, NC | 7.4 GWh |
#2220 | Old Mill Solar | Bly, OR | 7.4 GWh |
#2221 | Venture 2 - 1B | Aurora, CO | 7.4 GWh |
#2222 | Bashaw Solar CSG 1, LLC | Newbury, MA | 7.3 GWh |
#2224 | Greenwich Solar 1, LLC CSG | Greenwich, NY | 7.3 GWh |
#2225 | Neal Energy Center Solar | Salix, IA | 7.3 GWh |
#2226 | Gloversville Landfill Solar | Johnstown, NY | 7.3 GWh |
#2227 | French King Solar LLC | Erving, MA | 7.3 GWh |
#2228 | Happy Solar | Four Oaks, NC | 7.3 GWh |
#2229 | Mass Midstate Solar 1 | Warren, MA | 7.3 GWh |
#2230 | SCS Harpswell 012903 Brunswick, LLC | Brunswick, ME | 7.3 GWh |
#2231 | Settlers Solar | Lunenberg, MA | 7.3 GWh |
#2232 | Quincy Solar | Fayetteville, NC | 7.3 GWh |
#2233 | Tanglewood Circle Solar 1 LLC | Becket, MA | 7.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arthur 2 Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acme Solar, LLC | Riegelwood, NC | 7.8 GWh | 12 mi |
Arthur Solar, LLC | Tabor City, NC | 10.1 GWh | 2.7 mi |
Beckwith Solar | Tabor City, NC | 9.4 GWh | 1.5 mi |
Broadway Solar Center, LLC | Chadbourn, NC | 7.7 GWh | 10 mi |
Cathcart Solar, LLC | Whiteville, NC | 5.5 GWh | 13.7 mi |
Chadbourn Farm | Whiteville, NC | 8.6 GWh | 12.7 mi |
Chauncey Farm LLC | Lake Waccamaw, NC | 9.2 GWh | 24 mi |
Dessie Solar Center LLC | Chadbourn, NC | 8.4 GWh | 9.5 mi |
Freedom Solar | Nichols, SC | 7.8 GWh | 16.6 mi |
Garrell Solar Farm | Chadbourn, NC | 7.2 GWh | 11.9 mi |
Graham Solar Center LLC | Fair Bluff, NC | 8.5 GWh | 11.8 mi |
Hubble Solar, LLC | Whiteville, NC | 2.3 GWh | 13.7 mi |
McKenzie Farm | Whiteville, NC | 9.2 GWh | 15.5 mi |
Mill Pond Solar Farm, LLC | Whiteville, NC | 9.0 GWh | 14.3 mi |
Panda Solar NC 1, LLC | Fairmont, NC | 1.8 GWh | 21.5 mi |
Panda Solar NC 2, LLC | Fairmont, NC | 3.3 GWh | 21.4 mi |
Panda Solar NC 6, LLC | Chadbourn, NC | 1.6 GWh | 13.8 mi |
Progress Solar II, LLC | Fairmont, NC | 5.4 GWh | 24 mi |
Sadiebrook NC Solar | Clarkton, NC | 9.0 GWh | 22.8 mi |
Washington Solar (SC) | Mullins, SC | 2.5 GWh | 21.1 mi |