Arlington Wind Power Project
72650 Rattlesnake Road, Arlington, OR 97812Plant Summary Information
Arlington Wind Power Project is ranked #42 out of 255 power plants in Oregon in terms of total annual net electricity generation.
Arlington Wind Power Project generated 20.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Arlington Wind Power Project |
---|---|
Utility Name | Arlington Wind Power Project LLC |
Location | Gilliam County, OR |
Initial Operation Date | December 2008 |
Last Update | Dec 2023 |
Annual Generation | 177.8 GWh |
Annual Consumption | 639.6 k MMBtu |
Ranked #2,440 out of 11,835 Power Plants Nationwide | |
Ranked #743 out of 1,343 Wind Power Plants Nationwide | |
Ranked #42 out of 255 Oregon Power Plants | |
Ranked #19 out of 49 Oregon Wind Power Plants | |
Fuel Types | Wind |
Map of Arlington Wind Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arlington Wind Power Project.
Monthly Net Generation for Arlington Wind Power Project
Arlington Wind Power Project Details
Summary Information | |
---|---|
Plant Name | Arlington Wind Power Project (56855) |
Plant Address | 72650 Rattlesnake Road, Arlington, OR 97812 |
Utility | Arlington Wind Power Project LLC (56074) |
Latitude, Longitude | 45.7167, -120.2008 |
Generation Dates on File | Dec 2008 to Dec 2023 |
Initial Operation Date | December 2008 |
Annual Generation | 177.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG08-2 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 102.9 MW |
Summer Capacity | 102.9 MW |
Winter Capacity | 102.9 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 49 |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 49 |
---|---|
Predominant Turbine Manufacturer | Suzlon |
Predominant Turbine Model Number | S88-2100 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Arlington Wind Power Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#733 | Peak View Wind Farm | Walsenburg, CO | 183.4 GWh |
#734 | Beebe 1A | Ithaca, MI | 182.9 GWh |
#735 | Los Vientos Wind 1B | Sebastian, TX | 182.1 GWh |
#736 | Bison I Wind Energy Center | New Salem, ND | 181.7 GWh |
#737 | Majestic II Wind | Panhandle, TX | 180.7 GWh |
#738 | Harvest 2 | Elkton, MI | 180.2 GWh |
#739 | FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh |
#740 | Busch Ranch II Wind Farm | Walsenburg, CO | 179.7 GWh |
#741 | Strauss Wind Farm | Lompoc, CA | 179.6 GWh |
#742 | Green Pastures Wind II | Seymour, TX | 178.7 GWh |
#744 | Painted Hills Wind Park | Whitewater, CA | 177.6 GWh |
#745 | Cerro Gordo Wind Farm | Union, IA | 176.4 GWh |
#746 | San Juan Mesa Wind Project LLC | Elida, NM | 176.3 GWh |
#747 | Granite Reliable Power | Dummer, NH | 176.0 GWh |
#748 | Wethersfield | Gainsville, NY | 176.0 GWh |
#749 | Woodward Mountain I | Girvin, TX | 175.7 GWh |
#750 | Flat Ridge Wind Energy LLC | Isabel, KS | 175.5 GWh |
#751 | Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh |
#752 | FPL Energy Burleigh County Wind | Wilton, ND | 175.4 GWh |
#753 | Mountain View IV | North Palm Springs, CA | 175.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arlington Wind Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Horn Wind II | Bickleton, WA | 111.0 GWh | 14.8 mi |
Big Horn Wind Project | Bickelton, WA | 477.7 GWh | 12.6 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 16.1 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 9.7 mi |
Horseshoe Bend Wind LLC | Arlington, OR | 584.2 GWh | 13 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 263.0 GWh | 14.2 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 4.5 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 5.4 mi |
Lund Hill Solar | Bickleton, WA | 342.2 GWh | 14 mi |
Montague Solar | Arlington, OR | 292.3 GWh | 12.3 mi |
Montague Wind Power Facility LLC | Arlington, OR | 485.7 GWh | 10.5 mi |
North Hurlburt Wind LLC | Arlington, OR | 574.5 GWh | 5.8 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 3.7 mi |
South Hurlburt Wind LLC | Arlington, OR | 583.7 GWh | 5.9 mi |
Threemile Canyon | Boardman, OR | 19.5 GWh | 13 mi |
Threemile Digester | Boardman, OR | 37.6 GWh | 14.5 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh | 10.9 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 6.3 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 9.6 mi |
Willow Creek Energy Center | Lone, OR | 140.0 GWh | 11 mi |