Arlington Energy Center III
Dracker Drive, Blythe, CA 92225Plant Summary Information
Arlington Energy Center III is ranked #59 out of 799 solar farms in California in terms of total annual net electricity generation.
Arlington Energy Center III generated 101.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Arlington Energy Center III |
---|---|
Utility Name | Arlington Energy Center III |
Location | Riverside County, CA |
Initial Operation Date | August 2022 |
Last Update | Aug 2024 |
Annual Generation | 263.6 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,978 out of 11,835 Power Plants Nationwide | |
Ranked #171 out of 5,643 Solar Power Plants Nationwide | |
Ranked #202 out of 1,569 California Power Plants | |
Ranked #59 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Arlington Energy Center III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arlington Energy Center III.
Monthly Net Generation for Arlington Energy Center III
Arlington Energy Center III Details
Summary Information | |
---|---|
Plant Name | Arlington Energy Center III (64564) |
Plant Address | Dracker Drive, Blythe, CA 92225 |
Utility | Arlington Energy Center III (64199) |
Latitude, Longitude | 33.69088, -114.77494 |
Generation Dates on File | Aug 2022 to Aug 2024 |
Initial Operation Date | August 2022 |
Annual Generation | 263.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator AEC3 Details Operating August 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 131 MW |
Summer Capacity | 131 MW |
Winter Capacity | 131 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 164 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator AEC3B Details Operating August 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 110 MW |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 440 |
---|---|
Maximum Charge Rate | 110 MW |
Maximum Discharge Rate | 110 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 36.2 |
Storage Enclosure Type | CT |
Frequency Regulation | P |
Ramping Spinning Reserve | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Direct Support Plant Id | 64564 |
Direct Support Gen Id | AEC3 |
Support T D Asset | No |
Arlington Energy Center III Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#161 | Wistaria Ranch Solar | Calexico, CA | 295.2 GWh |
#162 | Concho Valley Solar, LLC | San Angelo, TX | 293.4 GWh |
#163 | Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh |
#164 | Montague Solar | Arlington, OR | 292.3 GWh |
#165 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#166 | Ganado Solar | Gail, TX | 288.0 GWh |
#167 | Umbriel Solar | Livington, TX | 289.8 GWh |
#168 | Harry Allen Solar Energy LLC | Apex, NV | 287.9 GWh |
#169 | Upton County Solar | McCamey, TX | 287.4 GWh |
#170 | Elm Branch Solar 1 | Bardwell, TX | 287.2 GWh |
#172 | Hardin Solar Energy LLC | Alger, OH | 285.7 GWh |
#173 | Tres Bahias | Port Lavaca, TX | 284.6 GWh |
#174 | East Blackland Solar Project 1 | Manor, TX | 283.4 GWh |
#175 | Colonial Trail West | Spring Grove, VA | 282.3 GWh |
#176 | BPL Files Solar | Itasca, TX | 282.2 GWh |
#177 | Valentine Solar, LLC | Rosamond, CA | 282.1 GWh |
#178 | Emerald Grove | Crane, TX | 281.6 GWh |
#179 | Mesquite Solar 2, LLC | Tonopah, AZ | 281.1 GWh |
#180 | Chestnut | Lemoore, CA | 287.1 GWh |
#181 | Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arlington Energy Center III.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 31.1 mi |
Arlington Energy Center II | Blythe, CA | 596.9 GWh | 0 mi |
Blythe Energy Inc | Blythe, CA | 1.1 TWh | 7.3 mi |
Blythe Mesa Solar II | Blythe, CA | 541.3 GWh | 6.5 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 2 mi |
Blythe Solar II, LLC | Blythe, CA | 329.3 GWh | 2.7 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 340.1 GWh | 3.1 mi |
Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh | 0.7 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 11.8 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 11.4 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 13 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 12 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 2 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 7.4 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 6.7 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 7.1 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 11.9 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 13.3 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 13.4 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 31.1 mi |