Arlington Energy Center II
Dracker Drive, Blythe, CA 92225Plant Summary Information
Arlington Energy Center II is ranked #25 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Arlington Energy Center II generated 195.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Arlington Energy Center II |
---|---|
Utility Name | Arlington Energy Center II |
Location | Riverside County, CA |
Initial Operation Date | March 2022 |
Last Update | Aug 2024 |
Annual Generation | 596.9 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,096 out of 11,835 Power Plants Nationwide | |
Ranked #25 out of 5,643 Solar Power Plants Nationwide | |
Ranked #59 out of 1,569 California Power Plants | |
Ranked #7 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Arlington Energy Center II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arlington Energy Center II.
Monthly Net Generation for Arlington Energy Center II
Arlington Energy Center II Details
Summary Information | |
---|---|
Plant Name | Arlington Energy Center II (64481) |
Plant Address | Dracker Drive, Blythe, CA 92225 |
Utility | Arlington Energy Center II (64144) |
Latitude, Longitude | 33.69088, -114.77494 |
Generation Dates on File | Mar 2022 to Aug 2024 |
Initial Operation Date | March 2022 |
Annual Generation | 596.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator AEC1 Details Operating March 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 135.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator AEC2B Details Operating August 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 132 MW |
Summer Capacity | 132 MW |
Winter Capacity | 132 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 528 |
---|---|
Maximum Charge Rate | 132 MW |
Maximum Discharge Rate | 132 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 43.4 |
Storage Enclosure Type | CT |
Frequency Regulation | P |
Ramping Spinning Reserve | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Direct Support Plant Id | 64481 / 64481 |
Direct Support Gen Id | AEC1 / AEC2 |
Support T D Asset | No |
Generator AEC2 Details Operating October 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 133 MW |
Summer Capacity | 133 MW |
Winter Capacity | 133 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 182.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Arlington Energy Center II Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#15 | Solar Star 2 | Rosamond, CA | 701.3 GWh |
#16 | IP Radian, LLC | Brookesmith, TX | 687.2 GWh |
#17 | Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh |
#18 | Slate Hybrid | Stratford, CA | 656.4 GWh |
#19 | Prospero Solar II | Andrews, TX | 675.9 GWh |
#20 | Agua Caliente Solar Project | Dateland, AZ | 674.0 GWh |
#21 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
#22 | Silver State Solar Power South | Primm Valley, NV | 647.5 GWh |
#23 | Texas Solar Nova 1 | Spur, TX | 640.0 GWh |
#24 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 612.2 GWh |
#26 | Mojave Solar Project | Hinkley, CA | 624.3 GWh |
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh |
#29 | Stateline Solar | Nipton, CA | 618.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh |
#31 | Genesis Solar Energy Project | Blythe, CA | 609.1 GWh |
#32 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#33 | Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh |
#34 | Moapa Southern Paiute | Moapa, NV | 604.0 GWh |
#35 | Bighorn Solar 1 | Pueblo, CO | 600.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arlington Energy Center II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 31.1 mi |
Arlington Energy Center III | Blythe, CA | 263.6 GWh | 0 mi |
Blythe Energy Inc | Blythe, CA | 1.1 TWh | 7.3 mi |
Blythe Mesa Solar II | Blythe, CA | 541.3 GWh | 6.5 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 2 mi |
Blythe Solar II, LLC | Blythe, CA | 329.3 GWh | 2.7 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 340.1 GWh | 3.1 mi |
Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh | 0.7 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 11.8 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 11.4 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 13 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 12 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 2 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 7.4 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 6.7 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 7.1 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 11.9 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 13.3 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 13.4 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 31.1 mi |