Archer Daniels Midland Southport
1730 E Moore St SE, Southport, NC 28461Plant Summary Information
Archer Daniels Midland Southport is ranked #27 out of 30 natural gas power plants in North Carolina in terms of total annual net electricity generation.
Archer Daniels Midland Southport is comprised of 3 generators and generated 430.7 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Archer Daniels Midland Southport |
---|---|
Utility Name | Archer Daniels Midland Co |
Location | Brunswick County, NC |
Initial Operation Date | September 1992 |
Last Update | Dec 2022 |
Annual Generation | 1.3 GWh |
Annual Consumption | 34.0 k MMBtu |
Ranked #10,652 out of 11,835 Power Plants Nationwide | |
Ranked #1,894 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #829 out of 862 North Carolina Power Plants | |
Ranked #27 out of 30 North Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas : 73.3% Distillate Fuel Oil : 26.7% |
Map of Archer Daniels Midland Southport
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Archer Daniels Midland Southport.
Monthly Net Generation for Archer Daniels Midland Southport
Archer Daniels Midland Southport Details
Summary Information | |
---|---|
Plant Name | Archer Daniels Midland Southport (54316) |
Plant Address | 1730 E Moore St SE, Southport, NC 28461 |
Utility | Archer Daniels Midland Co (772) |
Latitude, Longitude | 33.9397, -77.9905 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | September 1992 |
Annual Generation | 1.3 GWh |
Fuel Types | Natural Gas : 73.3% Distillate Fuel Oil : 26.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Food Manufacturing (311) |
Sector | Industrial CHP (7) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 13.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PIEDMONT NATURAL GAS |
Natural Gas Storage | No |
Generator GEN2 Details Standby October 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 17.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 15 MW |
Winter Capacity | 17.5 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | October 1992 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 12 MW |
Net Winter Capacity With Natural Gas | 15 MW |
Net Summer Capacity With Oil | 12 MW |
Net Winter Capacity With Oil | 15 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator GEN1 Details Standby September 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | No Sales |
RTO ISO Location Designation For Reporting Wholesale Sales Data | No sales |
Nameplate Capacity | 18 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 15 MW |
Winter Capacity | 18 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | September 1992 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 12 MW |
Net Winter Capacity With Natural Gas | 15 MW |
Net Summer Capacity With Oil | 12 MW |
Net Winter Capacity With Oil | 15 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator GEN3 Details Standby April 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 17 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 15 MW |
Winter Capacity | 17 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | April 1995 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 12 MW |
Net Winter Capacity With Natural Gas | 15 MW |
Net Summer Capacity With Oil | 12 MW |
Net Winter Capacity With Oil | 15 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Archer Daniels Midland Southport Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1884 | West 14th Street | Winfield, KS | 1.1 GWh |
#1885 | Jameson Energy Center | Garden City, KS | 1.1 GWh |
#1886 | New Ulm | New Ulm, MN | 1.3 GWh |
#1887 | Wygen 1 | Gillette, WY | 535.0 GWh |
#1888 | HEBCCBakery | Corpus Christi, TX | 1.0 GWh |
#1889 | Coralville GT | Coralville, IA | 1.0 GWh |
#1890 | Princeton (IL) | Princeton, IL | 1.0 GWh |
#1891 | One Market Plaza | San Francisco, CA | 993.0 MWh |
#1892 | Holton | City of Holton, KS | 1.0 GWh |
#1893 | CSUCI Site Authority | Camarillo, CA | 956.0 MWh |
#1895 | Rariton OMP | Raritan, NJ | 2.5 GWh |
#1896 | Dillard Complex | Dillard, OR | 114.0 GWh |
#1897 | Crisp Plant | Warwick, GA | 882.0 MWh |
#1898 | NE Renewable Fitchburg, LLC | Westminster, MA | 36.4 GWh |
#1899 | Pasco Cnty Solid Waste Resource Recovery | Spring Hill, FL | 183.2 GWh |
#1900 | Red Wing | Red Wing, MN | 121.4 GWh |
#1901 | Bryan (OH) | Bryan, OH | 916.8 MWh |
#1902 | Iola | Iola, KS | 909.0 MWh |
#1903 | Onondaga County Resource Recovery | Jamesville, NY | 208.8 GWh |
#1904 | Regional Waste Systems | Portland, ME | 80.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Archer Daniels Midland Southport.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AGA TAG Solar IV LLC | Leland, NC | 3.3 GWh | 23.5 mi |
ATOOD Solar IV, LLC | Leland, NC | 7.5 GWh | 23.5 mi |
Bearford Farm Solar Project | Willard, NC | 9.1 GWh | 46.5 mi |
Bearford Solar II | Burgaw, NC | 8.4 GWh | 46.6 mi |
Brunswick Nuclear | Southport, NC | 15.9 TWh | 1.8 mi |
Burgaw Solar, LLC | Burgaw, NC | 7.9 GWh | 41.4 mi |
Chauncey Farm LLC | Lake Waccamaw, NC | 9.2 GWh | 41 mi |
Delco Farm | Riegelwood, NC | 8.7 GWh | 29 mi |
Heedeh Solar | Delco, NC | 7.0 GWh | 28.7 mi |
Innovative Solar 43, LLC | Ivanhoe, NC | 65.4 GWh | 44.6 mi |
Innovative Solar 67 | Willard, NC | 67.7 GWh | 47.2 mi |
International Paper Riegelwood Mill | Riegelwood, NC | 334.9 GWh | 31.3 mi |
L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh | 23.7 mi |
McKenzie Farm | Whiteville, NC | 9.2 GWh | 48.1 mi |
Mill Pond Solar Farm, LLC | Whiteville, NC | 9.0 GWh | 47.9 mi |
Quarter Horse Solar | Hampstead, NC | 9.4 GWh | 39.7 mi |
Scotch Bonnet Solar, LLC | St Helena, NC | 6.3 GWh | 41.6 mi |
South Atlantic Services Solar Farm I | Wilmington, NC | 2.6 GWh | 24.2 mi |
SunEdison LV Sutton Plant Site | Wilmington, NC | 1.2 GWh | 24 mi |
Trojan Solar, LLC | Delco, NC | 10.1 GWh | 28.5 mi |