Archbald Power Station
170 Cogen Road, Archbald, PA 18403Plant Summary Information
Archbald Power Station is ranked #41 out of 78 natural gas power plants in Pennsylvania in terms of total annual net electricity generation.
Archbald Power Station is comprised of 4 generators and generated 15.1 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Archbald Power Station |
---|---|
Utility Name | PEI Power Corp |
Location | Lackawanna County, PA |
Initial Operation Date | September 1988 |
Last Update | Jan 2025 |
Annual Generation | 95.0 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #3,295 out of 11,979 Power Plants Nationwide | |
Ranked #1,000 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #86 out of 231 Pennsylvania Power Plants | |
Ranked #41 out of 78 Pennsylvania Natural Gas Power Plants | |
Fuel Types | Natural Gas : 72.2% Landfill Gas : 27.8% |
Map of Archbald Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Archbald Power Station.
Monthly Net Generation for Archbald Power Station
Archbald Power Station Details
Summary Information | |
---|---|
Plant Name | Archbald Power Station (50279) |
Plant Address | 170 Cogen Road, Archbald, PA 18403 |
Utility | PEI Power Corp (22174) |
Latitude, Longitude | 41.485, -75.5406 |
Generation Dates on File | Jan 2001 to Jan 2025 |
Initial Operation Date | September 1988 |
Annual Generation | 95.0 GWh |
Fuel Types | Natural Gas : 72.2% Landfill Gas : 27.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 98-60-000; 01-79-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | White Oak |
Ash Impoundment | No |
Transmission / Distribution Owner | PPL Electric Utilities Corp (14715) PA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | UGI UTILITIES |
Natural Gas Storage | No |
Generator GEN1 Details Operating September 1988
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 1048035 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ARCHTAP13 KV PEI 1 |
Nameplate Capacity | 23.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1988 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Landfill Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Other Combustion Technology | No |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | OG / NG |
---|
Generator Gen2 Details Operating May 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 1048036 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ARCHBTAP13 KV PEI 2 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 43.7 MW |
Winter Capacity | 50 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating February 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 87901559 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ARCHTAP 13 KV PEI 5 |
Nameplate Capacity | 4.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4 MW |
Winter Capacity | 4.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Startup Source | Other Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating February 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 87901561 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ARCHTAP 13 KV PEI 6 |
Nameplate Capacity | 4.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4 MW |
Winter Capacity | 4.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Startup Source | Other Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Combustion Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Archbald Power Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#990 | Western Michigan University Power Plant | Kalamazoo, MI | 71.3 GWh |
#991 | Whiting Refinery | Whiting, IN | 445.2 GWh |
#992 | Port Comfort Power LLC | Point Comfort, TX | 70.8 GWh |
#993 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 199.3 GWh |
#994 | F B Culley | Newburgh, IN | 1.8 TWh |
#995 | Rubart | Ulysses, KS | 70.3 GWh |
#996 | Berkshire Power | Agawam, MA | 70.1 GWh |
#997 | Anheuser-Busch Jacksonville | Jacksonville, FL | 69.5 GWh |
#998 | Parnassus Central Utility Plant | San Francisco, CA | 69.1 GWh |
#999 | New York University Central Plant | New York, NY | 74.2 GWh |
#1001 | Greenville Electric Generating Station | Greenville, OH | 68.5 GWh |
#1002 | Beaver Dam | Canton Township, PA | 68.1 GWh |
#1003 | International Paper Vicksburg Mill | Vicksburg, MS | 210.5 GWh |
#1004 | Mariposa Energy Project | Byron, CA | 68.0 GWh |
#1005 | Packaging Corp of America | Counce, TN | 412.5 GWh |
#1006 | La Luz Energy Center | Belen, NM | 67.7 GWh |
#1007 | Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh |
#1008 | Nippon Dynawave Packaging Longview WA | Longview, WA | 287.3 GWh |
#1009 | Lee Energy Facility | Dixon, IL | 67.0 GWh |
#1010 | Univ of Massachusetts Medical Center | Worcester, MA | 68.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Archbald Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baer Road CSG | New York, NY | 2.7 GWh | 32.6 mi |
Blakely (PA) RTO BTM | Peckville, PA | 128.0 MWh | 3.2 mi |
Hospital Rd Community Solar Farm CSG | Delaware, NY | 2.0 GWh | 32.9 mi |
Hunlock Power Station | Hunlok Creek, PA | 603.0 GWh | 33.8 mi |
Hunlock Unit 4 | Hunlock Green, PA | 50.3 GWh | 33.6 mi |
Lackawanna Energy Center | Jessup, PA | 9.7 TWh | 1 mi |
Mehoopany Wind Energy LLC | Noxen, PA | 343.3 GWh | 26.7 mi |
Oxbow Creek | Factoryville, PA | 62.4 GWh | 19.1 mi |
Pocono Solar Project | Long Pond, PA | 3.1 GWh | 29.3 mi |
Procter & Gamble Mehoopany Mill | Mehoopany, PA | 847.7 GWh | 26.7 mi |
Roundtop | Meshoppen, PA | 60.3 GWh | 28.9 mi |
State Highway 17B Solar | Bethel, NY | 7.2 GWh | 36.9 mi |
Villa Roma Rd #1 | Delaware, NY | 2.4 GWh | 35.4 mi |
Villa Roma Rd #2 | Delaware, NY | 2.7 GWh | 35.3 mi |
Villa Roma Rd #3 CSG | Delaware, NY | 2.4 GWh | 35.2 mi |
Villa Roma Rd #4 CSG | Delaware, NY | 2.4 GWh | 35.4 mi |
Wallenpaupack | Drumore, PA | 90.2 GWh | 21.2 mi |
Waymart Wind | Forest City, PA | 87.2 GWh | 6.5 mi |
Wind Park Bear Creek | Bear Creek, PA | 61.9 GWh | 20.5 mi |
Woodoak Drive Community Solar Farm CSG | Tusten, NY | 2.5 GWh | 27.6 mi |