Arcelormittal Cleveland Inc
3060 Eggers Road, Cleveland, OH 44105Plant Summary Information
Arcelormittal Cleveland Inc is ranked #6 out of 10 blast furnace gas power plants nationwide in terms of total annual net electricity generation.
Arcelormittal Cleveland Inc is comprised of 6 generators and generated 66.6 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Arcelormittal Cleveland Inc |
---|---|
Utility Name | ArcelorMittal Cleveland Inc |
Location | Cuyahoga County, OH |
Initial Operation Date | January 1950 |
Last Update | Mar 2024 |
Annual Generation | 186.9 GWh |
Annual Consumption | 5.2 M MMBtu |
Ranked #2,415 out of 11,249 Power Plants Nationwide | |
Ranked #6 out of 10 Blast Furnace Gas Power Plants Nationwide | |
Ranked #47 out of 170 Ohio Power Plants | |
Ranked #1 out of 1 Ohio Blast Furnace Gas Power Plants | |
Fuel Types | Blast Furnace Gas : 67.2% Natural Gas : 32.8% |
Map of Arcelormittal Cleveland Inc
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arcelormittal Cleveland Inc.
Monthly Net Generation for Arcelormittal Cleveland Inc
Arcelormittal Cleveland Inc Details
Summary Information | |
---|---|
Plant Name | Arcelormittal Cleveland Inc (10398) |
Plant Address | 3060 Eggers Road Cleveland, OH 44105 |
Utility | ArcelorMittal Cleveland Inc (9454) |
Latitude, Longitude | 41.4739, -81.6728 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | January 1950 |
Annual Generation | 186.9 GWh |
Fuel Types | Blast Furnace Gas : 67.2% Natural Gas : 32.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Iron and Steel Mills and Ferroalloy Manufacturing (3311) |
Sector | Industrial CHP (7) |
Water Source | Cuyahoga River |
Ash Impoundment | No |
Transmission / Distribution Owner | Cleveland Electric Illum Co (3755) OH |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | EAST OHIO GAS COMP DOMINION EAST OH |
Natural Gas Storage | No |
Generator GENA Details Operating January 1950
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 12 MW |
Winter Capacity | 14 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1950 |
Planned Retirement | March 2023 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas / Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|
Generator GEN3 Details Operating January 1965
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1965 |
Planned Retirement | March 2023 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Blast Furnace Gas / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|
Generator GEN5 Details Operating January 1965
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 8 MW |
Winter Capacity | 9 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1965 |
Planned Retirement | March 2023 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Blast Furnace Gas / Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|
Generator GENB Details Operating January 1965
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 8 MW |
Winter Capacity | 9 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1965 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas / Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|---|
Other Limits | Yes |
Generator GENC Details Operating February 2010
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 22 MW |
Winter Capacity | 22 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2010 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas / Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|---|
Air Permit Limits | Yes |
Other Limits | Yes |
Generator GENG Details Operating March 2022
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 70 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 69.3 MW |
Winter Capacity | 60 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2022 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas |
Startup Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Arcelormittal Cleveland Inc Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Blast Furnace Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Dearborn Industrial Generation | Dearborn, MI | 5.9 TWh |
#2 | Gary Works | Gary, IN | 1.3 TWh |
#3 | Indiana Harbor E 5 AC Station | East Chicago, IN | 594.3 GWh |
#4 | ArcelorMittal Burns Harbor | Burns Harbor, IN | 1.1 TWh |
#5 | Mon Valley Works | Dravosburg, PA | 458.3 GWh |
#7 | Granite City Works | Granite City, IL | 568.7 GWh |
#8 | Expander Turbine | East Chicago, IN | 41.9 GWh |
#9 | Indiana Harbor West | East Chicago, IN | 155.2 GWh |
#10 | Borger Plant | Borger, TX | 20.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arcelormittal Cleveland Inc.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 8.6 GWh | 22.8 mi |
Cleveland Peaking | Cleveland, OH | 106.0 MWh | 7.2 mi |
Cleveland Thermal | Cleveland, OH | 1.5 GWh | 2.5 mi |
Collinwood BioEnergy Facility | Cleveland, OH | 2.9 GWh | 7.1 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.5 GWh | 4.6 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 605.6 MWh | 25.1 mi |
DG AMP 1048 Wadsworth | Wadsworth, OH | 11.2 GWh | 32.2 mi |
DG AMP Rittman Rd | Wadsworth, OH | 3.5 GWh | 32.9 mi |
Euclid Farm, Stamco N-54 | Euclid, OH | 598.0 MWh | 12.7 mi |
LE Wind Turbine 1 | Euclid, OH | 5.5 GWh | 10.8 mi |
Loraine County Project | Oberlin, OH | 111.6 GWh | 28.9 mi |
MCCo Solar Generating Facility | Cleveland, OH | 448.0 MWh | 4.9 mi |
Morton Salt Rittman | Rittman, OH | 17.3 GWh | 35.3 mi |
Oberlin (OH) | Oberlin, OH | 346.0 MWh | 31.2 mi |
Painesville | Painesville, OH | 44.0 MWh | 27.8 mi |
Perry | Perry, OH | 10.2 TWh | 35.4 mi |
Seville | Seville, OH | 222.7 MWh | 32.2 mi |
Summit Street Power Plant | Kent, OH | 32.4 GWh | 28.6 mi |
Wadsworth HBS RTO BTM | Wadsworth, OH | 280.0 MWh | 30.6 mi |
West Lorain | Lorain, OH | 621.4 GWh | 30.8 mi |