Arborgate Solar
445 Dee Farrell Road, Pittsboro, NC 27530Plant Summary Information
Arborgate Solar is ranked #215 out of 738 solar farms in North Carolina in terms of total annual net electricity generation.
Arborgate Solar generated 2.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Arborgate Solar |
---|---|
Utility Name | Strata Manager, LLC |
Location | Chatham County, NC |
Initial Operation Date | February 2019 |
Last Update | Dec 2022 |
Annual Generation | 9.9 GWh |
Annual Consumption | 36.6 k MMBtu |
Ranked #5,895 out of 11,249 Power Plants Nationwide | |
Ranked #1,511 out of 5,158 Solar Power Plants Nationwide | |
Ranked #291 out of 858 North Carolina Power Plants | |
Ranked #215 out of 738 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Arborgate Farm, LLC (2018 to 2020) Strata Manager, LLC (2021 to 2022) |
Map of Arborgate Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arborgate Solar.
Monthly Net Generation for Arborgate Solar
Arborgate Solar Details
Summary Information | |
---|---|
Plant Name | Arborgate Solar (62623) |
Plant Address | 445 Dee Farrell Road Pittsboro, NC 27530 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 35.71739, -79.11946 |
Generation Dates on File | Feb 2019 to Dec 2022 |
Initial Operation Date | February 2019 |
Annual Generation | 9.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress West (CPLW) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 5.00 kV |
Energy Storage | No |
Generator ARBOR Details Operating February 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Arborgate Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Arborgate Farm, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1501 | Manway Solar Farm | Garland, NC | 10.0 GWh |
#1502 | Bo Biggs Solar | Lumberton, NC | 10.0 GWh |
#1503 | Floyd Solar, LLC | Fairmont, NC | 10.0 GWh |
#1504 | Elliana Solar | Burlington, NC | 10.0 GWh |
#1505 | Hector Farm | Troy, NC | 10.0 GWh |
#1506 | Trinity Solar | Trinity, NC | 10.0 GWh |
#1507 | ABD Farms | Asheboro, NC | 9.9 GWh |
#1508 | Spring Hope Solar 2, LLC | Spring Hope, NC | 9.9 GWh |
#1509 | RE Rio Grande Solar LLC | Mojave, CA | 9.9 GWh |
#1510 | G&S Wantage Solar LLC | Wantage, NJ | 9.9 GWh |
#1512 | Red Oak Solar Farm, LLC | Nashville, NC | 9.9 GWh |
#1513 | 1025 Traveller Solar, LLC | Sanford, NC | 9.9 GWh |
#1514 | Branch Solar Farm | Branch, AR | 9.9 GWh |
#1515 | Sonne Two | Newton, NC | 9.9 GWh |
#1516 | RCWD PV Project | Murrieta, CA | 9.9 GWh |
#1517 | Wadesboro Farm 2 | Wadesboro, NC | 9.9 GWh |
#1518 | Biscoe Solar LLC | Biscoe, NC | 9.9 GWh |
#1519 | Lanier Solar | Beulaville, NC | 9.9 GWh |
#1520 | Fisher Solar Farm - NC | Oakboro, NC | 9.9 GWh |
#1521 | ZV Solar 2, LLC | Red Springs, NC | 9.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arborgate Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Balsam | Sanford, NC | 9.1 GWh | 18.1 mi |
Boaz Farm Solar | Sanford, NC | 10.0 GWh | 17.3 mi |
Broadway Road Solar, LLC | Sanford, NC | 3.9 GWh | 18 mi |
Cohen Farm Solar, LLC | Sanford, NC | 10.4 GWh | 11.9 mi |
Cotten Farm, LLC | Sanford, NC | 10.0 GWh | 13.8 mi |
Cougar Solar, LLC | Sanford, NC | 3.8 GWh | 18 mi |
Elm Solar, LLC | Sanford, NC | 9.7 GWh | 18.6 mi |
Farrington Farm | Chapel Hill, NC | 1.4 GWh | 9.6 mi |
Flatwood Farm | Moncure, NC | 9.7 GWh | 10.2 mi |
Harris | New Hill, NC | 9.3 TWh | 10.9 mi |
Jordan Hydroelectric Project | Moncure, NC | 5.8 GWh | 5.2 mi |
Meadowlark Solar | Dunn, NC | 10.0 GWh | 12.6 mi |
Moncure Farm LLC | Moncure, NC | 6.4 GWh | 11.4 mi |
Siler 421 Farm, LLC | Siler City, NC | 10.3 GWh | 18.6 mi |
Sweetgum Solar | Sanford, NC | 9.5 GWh | 18.2 mi |
Tinker (NC) | Moncure, NC | 9.2 GWh | 2.2 mi |
Univ of NC Chapel Hill Cogen Facility | Chapel Hill, NC | 39.2 GWh | 13.5 mi |
Vickers | Chapel Hill, NC | 4.0 GWh | 7.6 mi |
Wake County LFG Facility | Apex, NC | 64.3 GWh | 15.2 mi |
White Cross Farm | Chapel Hill, NC | 8.8 GWh | 13.7 mi |