Aragorn Solar Project
2535 (C) E KC Road, Van Horn, TX 79855Plant Summary Information
Aragorn Solar Project is ranked #46 out of 181 solar farms in Texas in terms of total annual net electricity generation.
Aragorn Solar Project generated 64.6 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Aragorn Solar Project |
---|---|
Utility Name | SE Aragorn, LLC |
Location | Culberson County, TX |
Initial Operation Date | December 2021 |
Last Update | Jan 2025 |
Annual Generation | 343.7 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,712 out of 11,979 Power Plants Nationwide | |
Ranked #145 out of 5,765 Solar Power Plants Nationwide | |
Ranked #328 out of 774 Texas Power Plants | |
Ranked #46 out of 181 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Aragorn Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Aragorn Solar Project.
Monthly Net Generation for Aragorn Solar Project
Aragorn Solar Project Details
Summary Information | |
---|---|
Plant Name | Aragorn Solar Project (63329) |
Plant Address | 2535 (C) E KC Road, Van Horn, TX 79855 |
Utility | SE Aragorn, LLC (63101) |
Latitude, Longitude | 31.71998, -104.44229 |
Generation Dates on File | Dec 2021 to Jan 2025 |
Initial Operation Date | December 2021 |
Annual Generation | 343.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator IPAGN Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 187.2 MW |
Summer Capacity | 180 MW |
Winter Capacity | 180 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
DC Net Capacity | 255 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Aragorn Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#135 | Lund Hill Solar | Bickleton, WA | 359.3 GWh |
#136 | Newport Solar Project | Newport, AR | 353.8 GWh |
#137 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 328.0 GWh |
#138 | Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh |
#139 | Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh |
#140 | Wright Solar Park | Los Banos, CA | 347.2 GWh |
#141 | Blythe Solar II, LLC | Blythe, CA | 337.5 GWh |
#142 | Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh |
#143 | Edwards Sanborn E1A | Mojave, CA | 329.9 GWh |
#144 | Skipjack Solar Center | Wayside, VA | 345.1 GWh |
#146 | BigBeau Solar, LLC | Rosamond, CA | 338.0 GWh |
#147 | Impact Solar 1 | Deport, TX | 335.8 GWh |
#148 | Big River Solar | Norris City, IL | 334.5 GWh |
#149 | Oxbow Solar 1 | New Roads, LA | 332.9 GWh |
#150 | Quitman Solar | Quitman, GA | 332.8 GWh |
#151 | Mockingbird Solar Center | Brookston, TX | 332.5 GWh |
#152 | Upton County Solar | McCamey, TX | 331.2 GWh |
#153 | American Kings Solar, LLC | Lemoore, CA | 330.6 GWh |
#154 | Ganado Solar | Gail, TX | 324.8 GWh |
#155 | CA Flats Solar 150, LLC | Shandon, CA | 328.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Aragorn Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anderson Wind II | Hagerman, NM | 35.2 GWh | 95.5 mi |
Barilla Solar | Fort Stockton, TX | 79.1 GWh | 83.1 mi |
Cunningham | Hobbs, NM | 1.8 TWh | 93.6 mi |
Hayhurst New Mexico Solar | Malaga, NM | 6.0 GWh | 29.3 mi |
Hayhurst Texas Solar | Orla, TX | 637.0 MWh | 22 mi |
Hobbs Generating Station | Hobbs, NM | 2.7 TWh | 96.1 mi |
Maddox | Hobbs, NM | 603.2 GWh | 95.7 mi |
Oso Grande Wind Farm | Maljamar, NM | 704.8 GWh | 95.2 mi |
Permian Basin | Monahans, TX | 344.7 GWh | 87.5 mi |
Phoebe Solar | Kermit, TX | 520.2 GWh | 92.8 mi |
RE Roserock | Fort Stockton, TX | 365.9 GWh | 85.1 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 81.5 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 80.5 mi |
SPS3 Lea | Eunice, NM | 23.0 GWh | 83.5 mi |
SPS4 Monument | Monument, NM | 22.3 GWh | 94.1 mi |
SPS5 Hopi | Carlsbad, NM | 19.9 GWh | 44.9 mi |
Taygete Energy Project LLC | Coyanosa, TX | 448.2 GWh | 86.5 mi |
Taygete II Energy Project | Coyanosa, TX | 499.2 GWh | 85.8 mi |
Titan Solar Project | Van Horn, TX | 593.9 GWh | 1.6 mi |
West of the Pecos Solar | TBD, TX | 233.7 GWh | 46.5 mi |