Apex Generating Station
15555 Apex Power Parkway, Las Vegas, NV 89165Plant Summary Information
Apex Generating Station is ranked #5 out of 109 power plants in Nevada in terms of total annual net electricity generation.
Apex Generating Station is comprised of 3 generators and generated 731.1 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Apex Generating Station |
---|---|
Utility Name | Apex Generating Station |
Location | Clark County, NV |
Initial Operation Date | May 2003 |
Last Update | Aug 2024 |
Annual Generation | 2.4 TWh |
Annual Consumption | 19.5 M MMBtu |
Ranked #470 out of 11,835 Power Plants Nationwide | |
Ranked #288 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 109 Nevada Power Plants | |
Ranked #5 out of 17 Nevada Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operators |
Las Vegas Power Company LLC (2013 to 2013) Los Angeles Department of Water & Power (2014 to 2021) Apex Generating Station (2022 to 2023) |
Map of Apex Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Apex Generating Station.
Monthly Net Generation for Apex Generating Station
Apex Generating Station Details
Summary Information | |
---|---|
Plant Name | Apex Generating Station (55514) |
Plant Address | 15555 Apex Power Parkway, Las Vegas, NV 89165 |
Utility | Apex Generating Station (65371) |
Latitude, Longitude | 36.416, -114.96092 |
Generation Dates on File | May 2003 to Aug 2024 |
Initial Operation Date | May 2003 |
Annual Generation | 2.4 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Garnet Valley Well #3 |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KERN RIVER GAS TRANSMISSION CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG1 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 174 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 164.6 MW |
Winter Capacity | 181.6 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 174 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 164.6 MW |
Winter Capacity | 181.6 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 252.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 195.2 MW |
Winter Capacity | 213.4 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Apex Generating Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Los Angeles Department of Water & Power | P O Box 51111, JFB Rm 445, Los Angeles, CA 90051 | Generator CTG1 | 100.00% |
Los Angeles Department of Water & Power | P O Box 51111, JFB Rm 445, Los Angeles, CA 90051 | Generator CTG2 | 100.00% |
Los Angeles Department of Water & Power | P O Box 51111, JFB Rm 445, Los Angeles, CA 90051 | Generator STG1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#278 | McClain Energy Facility | Newcastle, OK | 2.5 TWh |
#279 | Haynes | Long Beach, CA | 2.5 TWh |
#280 | C D McIntosh Jr | Lakeland, FL | 2.5 TWh |
#281 | Magic Valley Generating Station | Edinburg, TX | 2.4 TWh |
#282 | Chehalis Generating Facility | Chehalis, WA | 2.4 TWh |
#283 | Otay Mesa Generating Project | San Diego, CA | 2.4 TWh |
#284 | Sabine River Operations | Orange, TX | 2.4 TWh |
#285 | Bergen Generating Station | Ridgefield, NJ | 2.4 TWh |
#286 | Harry Allen | Las Vegas, NV | 2.4 TWh |
#287 | RS Cogen | Lake Charles, LA | 2.4 TWh |
#289 | Coyote Springs II | Boardman, OR | 2.4 TWh |
#290 | Pleasants Energy LLC | St Mary's, WV | 2.3 TWh |
#291 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 2.3 TWh |
#292 | Dogwood Energy Facility | Pleasant Hill, MO | 2.3 TWh |
#293 | Chesterfield | Chester, VA | 2.3 TWh |
#294 | Elk Hills Power LLC | Tupman, CA | 2.3 TWh |
#295 | La Paloma Generating Plant | McKittrick, CA | 2.3 TWh |
#296 | Quail Run Energy Center | Odessa, TX | 2.3 TWh |
#297 | Rolling Hills Generating | Wilkesville, OH | 2.3 TWh |
#298 | Higgins Generating Station | Primm, NV | 2.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Apex Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Solar PV Power Project | North Las Vegas, NV | 49.7 GWh | 1.9 mi |
Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh | 7.1 mi |
Chuck Lenzie Generating Station | Apex, NV | 6.9 TWh | 3.1 mi |
Dry Lake Solar Energy Center | Moapa, NV | 165.8 GWh | 4 mi |
Gemini Solar | Unincorporated, NV | 1.0 TWh | 9.3 mi |
Harry Allen | Las Vegas, NV | 2.4 TWh | 3.4 mi |
Harry Allen Solar Energy LLC | Apex, NV | 287.9 GWh | 1.5 mi |
IGS VGT | North Las Vegas, NV | 86.0 MWh | 11.1 mi |
Las Vegas Generating Station | North Las Vegas, NV | 410.0 GWh | 15.6 mi |
Moapa Southern Paiute | Moapa, NV | 604.0 GWh | 13.2 mi |
Mountain View Solar | North Las Vegas, NV | 53.8 GWh | 1.8 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh | 12 mi |
Nellis Solar PV II | North Las Vegas, NV | 38.0 GWh | 15.2 mi |
Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 421.0 GWh | 5.5 mi |
Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 454.0 GWh | 14 mi |
Playa Solar 1, LLC | North Las Vegas, NV | 187.9 GWh | 3 mi |
Playa Solar 2 | North Las Vegas, NV | 245.8 GWh | 3 mi |
Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh | 6.2 mi |
Silverhawk | North Las Vegas, NV | 2.8 TWh | 0.6 mi |
Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh | 13.8 mi |