Apache Solar 1
3800 N HIghway 191, Cochise, AZ 85606Plant Summary Information
Apache Solar 1 is ranked #32 out of 102 solar farms in Arizona in terms of total annual net electricity generation.
Apache Solar 1 generated 10.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Apache Solar 1 |
---|---|
Utility Name | Arizona Electric Pwr Coop Inc |
Location | Cochise County, AZ |
Initial Operation Date | October 2017 |
Last Update | Dec 2023 |
Annual Generation | 55.3 GWh |
Annual Consumption | 197.7 k MMBtu |
Ranked #3,749 out of 11,835 Power Plants Nationwide | |
Ranked #747 out of 5,643 Solar Power Plants Nationwide | |
Ranked #75 out of 155 Arizona Power Plants | |
Ranked #32 out of 102 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Apache Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Apache Solar 1.
Monthly Net Generation for Apache Solar 1
Apache Solar 1 Details
Summary Information | |
---|---|
Plant Name | Apache Solar 1 (60964) |
Plant Address | 3800 N HIghway 191, Cochise, AZ 85606 |
Utility | Arizona Electric Pwr Coop Inc (796) |
Latitude, Longitude | 32.06814, -109.89038 |
Generation Dates on File | Oct 2017 to Dec 2023 |
Initial Operation Date | October 2017 |
Annual Generation | 55.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Arizona Electric Pwr Coop Inc (796) |
Grid Voltage | 69.00 kV |
Energy Storage | Yes |
Generator AEPS1 Details Operating October 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 24.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Apache Solar 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Sierra Southwest Cooperative | 1000 S. Highway 80, Benson, AZ 85602 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#737 | Sunray 2 | Daggett, CA | 56.7 GWh |
#738 | Webberville Solar Project | Manor, TX | 56.4 GWh |
#739 | Baxley | Baxley, GA | 56.3 GWh |
#740 | Oberon IB | Odessa, TX | 56.3 GWh |
#741 | Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh |
#742 | Bonnie Mine Solar | Bartow, FL | 56.2 GWh |
#743 | Marine Corps Logistics Base Solar | Albany, GA | 55.7 GWh |
#744 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 56.1 GWh |
#745 | Castle Solar, LLC | Huntington, UT | 55.6 GWh |
#746 | Kingbird B Solar, LLC | Rosamond, CA | 55.6 GWh |
#748 | Fort Gordon Solar Facility | Fort Gordon, GA | 55.0 GWh |
#749 | Adelanto Solar, LLC | Adelanto, CA | 54.9 GWh |
#750 | Orion I Solar Project | Burlington, TX | 54.6 GWh |
#751 | Ripley | La Plata, MD | 54.0 GWh |
#752 | Mountain View Solar | North Las Vegas, NV | 53.8 GWh |
#753 | Axium Modesto Solar | Modesto, CA | 53.7 GWh |
#754 | TA-Acacia, LLC | Lancaster, CA | 53.4 GWh |
#755 | Sulphur Springs | Cochise, AZ | 53.3 GWh |
#756 | Mechanicsville Solar | Mechanicsville, VA | 53.1 GWh |
#757 | Cascade Solar | Joshua Tree, CA | 53.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Apache Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Actus Lend Lease DMAFB | Tucson, AZ | 3.0 GWh | 57.5 mi |
Amazon TUS2 | Tucson, AZ | 5.3 GWh | 55.7 mi |
Apache Station | Cochise, AZ | 2.2 TWh | 0.6 mi |
Cogenra - TEP | Tucson, AZ | 2.1 GWh | 54.1 mi |
Douglas | Douglas, AZ | 90.0 MWh | 52.5 mi |
Fort Huachuca Solar PV Project | Sierra Vista, AZ | 37.2 GWh | 44.5 mi |
FRB Solar Farm | Tucson, AZ | 4.1 GWh | 54.8 mi |
Gato Montes Solar, LLC | Tucson, AZ | 6.2 GWh | 54.5 mi |
Iron Horse Battery Storage Hybrid | Tucson, AZ | 4.6 GWh | 54.4 mi |
Pima Community College | Tucson, AZ | 2.4 GWh | 54.6 mi |
Prairie Fire | Tucson, AZ | 7.5 GWh | 54.5 mi |
Raptor Ridge | Tucson, AZ | 33.5 GWh | 58.1 mi |
Red Horse 2 | Willcox, AZ | 198.7 GWh | 19 mi |
Red Horse III | Wilcox, AZ | 48.1 GWh | 10.5 mi |
SR McNeal | McNeal, AZ | 38.7 GWh | 37.1 mi |
Sulphur Springs | Cochise, AZ | 53.3 GWh | 1.7 mi |
Tech Park Solar | Tucson, AZ | 13.7 GWh | 54.2 mi |
UASTP I | Tucson, AZ | 403.0 MWh | 53.9 mi |
Valencia Solar | Tucson, AZ | 26.2 GWh | 57.4 mi |
Wilmot Energy Center LLC | Tucson, AZ | 239.2 GWh | 58.7 mi |