Antelope Expansion 3B
TBD, Lancaster, CA 93536Plant Summary Information
Antelope Expansion 3B is ranked #288 out of 799 solar farms in California in terms of total annual net electricity generation.
Antelope Expansion 3B generated 2.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Antelope Expansion 3B |
---|---|
Utility Name | AES Distributed Energy |
Location | Los Angeles County, CA |
Initial Operation Date | June 2021 |
Last Update | Dec 2023 |
Annual Generation | 11.4 GWh |
Annual Consumption | 40.8 k MMBtu |
Ranked #5,687 out of 11,835 Power Plants Nationwide | |
Ranked #1,417 out of 5,643 Solar Power Plants Nationwide | |
Ranked #806 out of 1,569 California Power Plants | |
Ranked #288 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Antelope Expansion 3B, LLC (2018 to 2019) AES Distributed Energy (2020 to 2023) |
Map of Antelope Expansion 3B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Antelope Expansion 3B.
Monthly Net Generation for Antelope Expansion 3B
Antelope Expansion 3B Details
Summary Information | |
---|---|
Plant Name | Antelope Expansion 3B (62674) |
Plant Address | TBD, Lancaster, CA 93536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 34.72016, -118.32253 |
Generation Dates on File | Jun 2021 to Dec 2023 |
Initial Operation Date | June 2021 |
Annual Generation | 11.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator ANX3B Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 6.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Antelope Expansion 3B Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1407 | RE McKenzie 4 LLC | Galt, CA | 11.5 GWh |
#1408 | RE McKenzie 2 LLC | Galt, CA | 11.5 GWh |
#1409 | Flemington Solar | Flemington, NJ | 11.5 GWh |
#1410 | Coogee Solar | Grantsboro, NC | 11.5 GWh |
#1411 | JMB Mcguire-Dix-Lakehurst Solar Project | McGuire AFB, NJ | 11.5 GWh |
#1412 | RE McKenzie 5 LLC | Galt, CA | 11.4 GWh |
#1413 | Wyandot Solar Farm | Upper Sandusky, OH | 11.4 GWh |
#1414 | NorWest Energy 9 LLC | Pendleton, OR | 11.4 GWh |
#1415 | RE McKenzie 6 LLC | Galt, CA | 11.4 GWh |
#1416 | Kinsley Landfill Solar | Sewell, NJ | 11.4 GWh |
#1418 | Crawfordsville 2 Solar Park | Crawfordsville, IN | 11.4 GWh |
#1419 | Urtica Solar Project | Ellensburg, WA | 11.4 GWh |
#1420 | SunE Alamosa | Hooper, CO | 11.4 GWh |
#1421 | Alamogordo Solar Energy Center | Alamogordo, NM | 11.3 GWh |
#1422 | Griffin Solar | Robinson, TX | 11.3 GWh |
#1423 | Imclone Solar Electric Facility | Branchburg, NJ | 11.3 GWh |
#1424 | RE Kammerer 3 LLC | Elk Grove, CA | 11.3 GWh |
#1425 | RE Kammerer 1 LLC | Elk Grove, CA | 11.3 GWh |
#1426 | RE Kammerer 2 LLC | Elk Grove, CA | 11.3 GWh |
#1427 | SCE&G Springfield CSG | Springfield, SC | 11.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Antelope Expansion 3B.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope DSR 3 | Lancaster, CA | 36.2 GWh | 1.6 mi |
Antelope Expansion 2 | Lancaster, CA | 245.7 GWh | 1.9 mi |
Antelope Expansion 3A | Lancaster, CA | 34.7 GWh | 0.6 mi |
Central Antelope Dry Ranch B LLC | Lancaster, CA | 7.2 GWh | 1.6 mi |
Central Antelope Dry Ranch C | Lancaster, CA | 28.8 GWh | 1.3 mi |
Elevation Solar C | Lancaster, CA | 97.4 GWh | 1.3 mi |
Lancaster Dry Farm Ranch B | Lancaster, CA | 9.4 GWh | 1.9 mi |
North Lancaster Ranch | Lancaster, CA | 28.9 GWh | 0.5 mi |
Rodeo Solar C2 | Lancaster, CA | 3.5 GWh | 1.9 mi |
Rodeo Solar D2 | Lancaster, CA | 3.5 GWh | 1.9 mi |
Sierra Solar Greenworks | Lancaster, CA | 33.9 GWh | 1.3 mi |
Summer North Solar | Lancaster, CA | 11.1 GWh | 1.9 mi |
Summer Solar A2 | Lancaster, CA | 3.4 GWh | 1.9 mi |
Summer Solar B2 | Lancaster, CA | 3.2 GWh | 1.9 mi |
Summer Solar C2 | Lancaster, CA | 1.8 GWh | 1.9 mi |
Summer Solar D2 | Lancaster, CA | 2.0 GWh | 1.9 mi |
Summer Solar LLC | Lancaster, CA | 40.9 GWh | 0.8 mi |
TA-Acacia, LLC | Lancaster, CA | 53.4 GWh | 2.1 mi |
TA-High Desert LLC | Lancaster, CA | 45.4 GWh | 1.3 mi |
Western Antelope Blue Sky B | Lancaster, CA | 49.3 GWh | 1 mi |