Antelope Big Sky Ranch
8765U West Avenue J, Lancaster, CA 93536Plant Summary Information
Antelope Big Sky Ranch is ranked #170 out of 806 solar farms in California in terms of total annual net electricity generation.
Antelope Big Sky Ranch generated 8.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Antelope Big Sky Ranch |
---|---|
Utility Name | AES Distributed Energy |
Location | Los Angeles County, CA |
Initial Operation Date | August 2016 |
Last Update | Dec 2023 |
Annual Generation | 45.8 GWh |
Annual Consumption | 163.5 k MMBtu |
Ranked #4,015 out of 11,949 Power Plants Nationwide | |
Ranked #850 out of 5,739 Solar Power Plants Nationwide | |
Ranked #497 out of 1,577 California Power Plants | |
Ranked #170 out of 806 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Sustainable Power Group, LLC (2015 to 2020) AES Distributed Energy (2021 to 2023) |
Map of Antelope Big Sky Ranch
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Antelope Big Sky Ranch.
Monthly Net Generation for Antelope Big Sky Ranch
Antelope Big Sky Ranch Details
Summary Information | |
---|---|
Plant Name | Antelope Big Sky Ranch (60279) |
Plant Address | 8765U West Avenue J, Lancaster, CA 93536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 34.69484, -118.28769 |
Generation Dates on File | Aug 2016 to Dec 2023 |
Initial Operation Date | August 2016 |
Annual Generation | 45.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator ABSR Details Operating August 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 19 MW |
Winter Capacity | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Antelope Big Sky Ranch Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#840 | Simcoe Solar | Mountain Home, ID | 47.1 GWh |
#841 | Antelope Expansion 1B | Lancaster, CA | 46.9 GWh |
#842 | CED Ducor 4 | Ducor, CA | 46.9 GWh |
#843 | Corcoran Solar 2 | Corcoran, CA | 46.8 GWh |
#844 | Atwell Island West Solar | Alpaugh, CA | 46.5 GWh |
#845 | Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh |
#846 | Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh |
#847 | RE Gaskell West 3 LLC | Rosamond, CA | 46.3 GWh |
#848 | Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh |
#849 | SR Arlington I | Arlington, GA | 45.9 GWh |
#851 | Bayshore Solar C, LLC | Lancaster, CA | 45.6 GWh |
#852 | Algonquin SKIC20 Solar LLC | Taft, CA | 45.5 GWh |
#853 | EE Waianae Solar Project | Waianae, HI | 45.5 GWh |
#854 | Mocksville Solar | Mocksville, NC | 45.4 GWh |
#855 | TA-High Desert LLC | Lancaster, CA | 45.4 GWh |
#856 | White River Solar | Alpaugh, CA | 45.3 GWh |
#857 | Gaston Solar Power Plant | Cherryville Township, NC | 45.3 GWh |
#858 | Catalina Solar 2, LLC | Rosamond, CA | 45.0 GWh |
#859 | Little Bear 4 | Mendota, CA | 44.9 GWh |
#860 | Bayshore Solar B, LLC | Lancaster, CA | 44.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Antelope Big Sky Ranch.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope DSR 2 | Lancaster, CA | 12.6 GWh | 1.5 mi |
Bayshore Solar A, LLC | Lancaster, CA | 47.4 GWh | 2 mi |
Bayshore Solar B, LLC | Lancaster, CA | 44.9 GWh | 1.4 mi |
Bayshore Solar C, LLC | Lancaster, CA | 45.6 GWh | 1.8 mi |
Central Antelope Dry Ranch B LLC | Lancaster, CA | 7.2 GWh | 1.1 mi |
Central Antelope Dry Ranch C | Lancaster, CA | 28.8 GWh | 1.9 mi |
Horn | Lancaster, CA | 2.9 GWh | 1.2 mi |
Lancaster Dry Farm Ranch B | Lancaster, CA | 9.4 GWh | 1.5 mi |
Portal Ridge Solar B, LLC | Lancaster, CA | 38.6 GWh | 1.5 mi |
Portal Ridge Solar C, LLC | Lancaster, CA | 17.1 GWh | 1.5 mi |
Rodeo Solar C2 | Lancaster, CA | 3.5 GWh | 1.3 mi |
Rodeo Solar D2 | Lancaster, CA | 3.5 GWh | 1.3 mi |
Summer North Solar | Lancaster, CA | 11.1 GWh | 2 mi |
Summer Solar A2 | Lancaster, CA | 3.4 GWh | 2 mi |
Summer Solar B2 | Lancaster, CA | 3.2 GWh | 2 mi |
Summer Solar C2 | Lancaster, CA | 1.8 GWh | 2 mi |
Summer Solar D2 | Lancaster, CA | 2.0 GWh | 2 mi |
Summer Solar LLC | Lancaster, CA | 40.9 GWh | 1.9 mi |
TA-High Desert LLC | Lancaster, CA | 45.4 GWh | 1.4 mi |
Western Antelope Dry Ranch | Lancaster, CA | 22.2 GWh | 1.9 mi |