Antares-GRE 314 East Lyme LLC
20 Farm Meadow Road, East Lyme, CT 6333Plant Summary Information
Antares-GRE 314 East Lyme LLC is ranked #15 out of 65 solar farms in Connecticut in terms of total annual net electricity generation.
Antares-GRE 314 East Lyme LLC generated 1.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Antares-GRE 314 East Lyme LLC |
---|---|
Utility Name | MN8 Energy LLC |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | June 2014 |
Last Update | Sep 2024 |
Annual Generation | 4.1 GWh |
Annual Consumption | 15.1 k MMBtu |
Ranked #8,084 out of 11,852 Power Plants Nationwide | |
Ranked #3,089 out of 5,655 Solar Power Plants Nationwide | |
Ranked #85 out of 156 Connecticut Power Plants | |
Ranked #15 out of 65 Connecticut Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
GRE 314 East Lyme LLC (2014 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of Antares-GRE 314 East Lyme LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Antares-GRE 314 East Lyme LLC.
Monthly Net Generation for Antares-GRE 314 East Lyme LLC
Antares-GRE 314 East Lyme LLC Details
Summary Information | |
---|---|
Plant Name | Antares-GRE 314 East Lyme LLC (59495) |
Plant Address | 20 Farm Meadow Road, East Lyme, CT 6333 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 41.41694, -72.23444 |
Generation Dates on File | Jun 2014 to Sep 2024 |
Initial Operation Date | June 2014 |
Annual Generation | 4.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-782-000 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 14-782 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator GRE01 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Antares-GRE 314 East Lyme LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3079 | Blue Goose Solar CSG | Morrison, IL | 4.1 GWh |
#3080 | St Louis Solar | Gervais, OR | 4.1 GWh |
#3081 | POM Beverage Solar | Del Rey, CA | 4.1 GWh |
#3082 | Mendota Rich Dev CSG | Mendota, IL | 4.1 GWh |
#3083 | FRB Solar Farm | Tucson, AZ | 4.1 GWh |
#3084 | D'Arrigo Brothers - Phase 4 | Salinas, CA | 4.1 GWh |
#3085 | Calverton | Calverton, NY | 4.1 GWh |
#3086 | Shrewsbury Solar | Shrewsbury, MA | 4.1 GWh |
#3087 | Frenchtown I Solar | Frenchtown, NJ | 4.1 GWh |
#3088 | BQ - Psychedelic Site CSG | Swan Lake, NY | 4.1 GWh |
#3090 | SMUD at Fleshman | Galt, CA | 4.1 GWh |
#3091 | SSD Clackamas 4, LLC | Molalla, OR | 4.1 GWh |
#3092 | Bodega Avenue Solar LLC | Petaluma, CA | 4.1 GWh |
#3093 | Orange Coast College PH2 Solar Project | Costa Mesa, CA | 4.6 GWh |
#3094 | Berkley | Berkley, MA | 4.1 GWh |
#3095 | USS Sycamore Solar (CSG) | Sycamore, IL | 4.1 GWh |
#3096 | Gas City Solar Park | Gas City, IN | 4.1 GWh |
#3097 | Town of Burrillville Solar CSG | Burrillville, RI | 4.1 GWh |
#3098 | Acushnet- High Hill | Dartmouth, MA | 4.1 GWh |
#3099 | Iroquois Solar 1B LLC CSG | Watseka, IL | 4.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Antares-GRE 314 East Lyme LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 8.7 mi |
CMEEC - Bozrah | Bozrah, CT | 3.1 GWh | 11.3 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 8.2 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 8.5 mi |
CMEEC - Rogers Rd Solar | Norwich, CT | 1.6 GWh | 10.2 mi |
Conn Mun Electric Energy Coop | Norwich, CT | 1.3 GWh | 10.2 mi |
Connecticut College | New London, CT | 8.1 GWh | 7.2 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh | 9.5 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 701.0 MWh | 7.8 mi |
Lebanon Pines 1 & 2 | Lebanon, CT | 577.0 MWh | 10.5 mi |
Millstone | Waterford, CT | 16.0 TWh | 8.1 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 6.9 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 7.8 mi |
Norwich WWTP | Norwich, CT | 1.0 MWh | 10.8 mi |
Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh | 10.2 mi |
Pfizer Groton Plant | Groton, CT | 70.3 GWh | 10 mi |
Rand Whitney CHP Plant | Montville, CT | 133.7 GWh | 5.7 mi |
Subase Microgrid Project | Groton, CT | 34.2 GWh | 7.8 mi |
Water Treatment 1 & 2 | Groton, CT | 375.0 MWh | 11.1 mi |
Yale New Haven - New London | New London, CT | 14.6 GWh | 8.7 mi |