Anson Abenaki Hydros
3 Main Street, Madison, ME 4950Plant Summary Information
Anson Abenaki Hydros is ranked #19 out of 161 power plants in Maine in terms of total annual net electricity generation.
Anson Abenaki Hydros is comprised of 13 generators and generated 27.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Anson Abenaki Hydros |
---|---|
Utility Name | Eagle Creek Renewable Energy, LLC |
Location | Somerset County, ME |
Initial Operation Date | January 1950 |
Last Update | Dec 2023 |
Annual Generation | 145.1 GWh |
Annual Consumption | 541.1 k MMBtu |
Ranked #2,698 out of 11,835 Power Plants Nationwide | |
Ranked #273 out of 1,371 Water Power Plants Nationwide | |
Ranked #19 out of 161 Maine Power Plants | |
Ranked #7 out of 50 Maine Water Power Plants | |
Fuel Types | Water |
Previous Operators |
Madison Paper Industries Inc (2013 to 2016) Eagle Creek RE LLC (2017 to 2019) Eagle Creek Renewable Energy, LLC (2020 to 2023) |
Map of Anson Abenaki Hydros
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Anson Abenaki Hydros.
Monthly Net Generation for Anson Abenaki Hydros
Anson Abenaki Hydros Details
Summary Information | |
---|---|
Plant Name | Anson Abenaki Hydros (10186) |
Plant Address | 3 Main Street, Madison, ME 4950 |
Utility | Eagle Creek Renewable Energy, LLC (57280) |
Latitude, Longitude | 44.7975, -69.8867 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1950 |
Annual Generation | 145.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 81-1-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Kennnebec River |
Ash Impoundment | No |
Transmission / Distribution Owner | Town of Madison - (ME) (11477) ME |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | SUMMIT NATURAL GAS |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator AB7 Details Operating January 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1950 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AB5 Details Operating July 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1961 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AB2 Details Operating September 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1980 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator AB3 Details Operating April 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1983 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator AB4 Details Operating April 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1983 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AB1 Details Operating May 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1983 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator AN1 Details Operating September 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.6 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1984 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AN2 Details Operating September 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.6 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1984 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AN3 Details Operating September 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.6 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1984 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AN4 Details Operating September 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.6 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1984 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AN5 Details Operating September 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.6 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1984 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AB8 Details Operating August 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.2 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1989 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator AB6 Details Operating April 2008
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 4136 |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 2.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Anson Abenaki Hydros Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB1 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB2 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB3 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB4 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB5 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB6 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB7 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AB8 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AN1 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AN2 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AN3 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AN4 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator AN5 | 100.00% |
Eagle Creek Madison Hydro, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator STG1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#263 | North Fork | Estacada, OR | 155.1 GWh |
#264 | Forbestown | Forbestown, CA | 155.0 GWh |
#265 | Holt Dam | Tuscaloosa, AL | 154.5 GWh |
#266 | Boone Dam | Kingsport, TN | 153.2 GWh |
#267 | Big Creek 8 | Auberry, CA | 152.9 GWh |
#268 | Oak Grove | Estacada, OR | 152.1 GWh |
#269 | Carpenter | Hot Springs, AR | 150.6 GWh |
#270 | Chilhowee | Tallassee, TN | 146.9 GWh |
#271 | Butt Valley | Belden, CA | 146.5 GWh |
#272 | Kortes | Sinclair, WY | 146.2 GWh |
#274 | Fishing Creek | Great Falls, SC | 143.3 GWh |
#275 | Hauser | Helena, MT | 142.8 GWh |
#276 | Murray | North Little Rock, AR | 142.4 GWh |
#277 | Ocoee 3 | Benton, TN | 141.4 GWh |
#278 | Seminoe | Sinclair, WY | 140.7 GWh |
#279 | Fort Gibson | Fort Gibson, OK | 140.4 GWh |
#280 | Trenton Falls | Barneveld, NY | 140.2 GWh |
#281 | Cedar Creek | Great Falls, SC | 138.7 GWh |
#282 | Bankhead Dam | Northport, AL | 138.7 GWh |
#283 | Terror Lake Microgrid | Kodiak, AK | 137.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Anson Abenaki Hydros.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Athens AT01 | Athens, ME | 6.9 GWh | 15.5 mi |
Athens Energy | Athens, ME | 59.7 GWh | 15.1 mi |
Cenergy - Kiger | Embden, ME | 122.0 MWh | 11.5 mi |
Cenergy - Richards (CSG) | Fairfield, ME | 220.0 MWh | 17.4 mi |
Dynamic Madison | Madison, ME | 8.9 GWh | 7.3 mi |
Fairfield PV - BD Solar Fairfield LLC | Fairfield, ME | 8.2 GWh | 18.2 mi |
Farmington Solar | Farmington, ME | 126.3 GWh | 14.4 mi |
IOS - MEW Phase 1 | Madison, ME | 5.4 GWh | 2.4 mi |
ME Novel Lighthouse - Front St. Solar CSG | Skowhegan, ME | 1.4 GWh | 7.8 mi |
Messalonskee 2 (Oakland) | Oakland, ME | 12.9 GWh | 19.3 mi |
Messalonskee 3 | Oakland, ME | 7.3 GWh | 18.7 mi |
Oakland | Oakland, ME | 8.0 GWh | 18.3 mi |
Pleasant Street | Wilton, ME | 98.0 MWh | 19.2 mi |
River Road | Norridgewock, ME | 7.7 GWh | 7.2 mi |
Shawmut | Shawmut, ME | 36.7 GWh | 18.9 mi |
Somerset Plant | Skowhegan, ME | 485.5 GWh | 13.4 mi |
Waste Management Crossroads LFGTE | Norridgewock, ME | 19.5 GWh | 7.2 mi |
Weston Hydro | Skowhegan, ME | 88.4 GWh | 8.6 mi |
Williams Hydro | Solon, ME | 97.2 GWh | 11.2 mi |
Wyman Hydro | Bingham, ME | 501.6 GWh | 18.9 mi |