Androscoggin Energy Center
Gate 15 Riley Road, Jay, ME 4239Plant Summary Information
Androscoggin Energy Center is ranked #36 out of 161 power plants in Maine in terms of total annual net electricity generation.
Androscoggin Energy Center is comprised of 3 generators and generated 21.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Androscoggin Energy Center |
---|---|
Utility Name | JGT2 Energy LLC |
Location | Franklin County, ME |
Initial Operation Date | October 1999 |
Last Update | Dec 2023 |
Annual Generation | 82.0 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #3,410 out of 11,852 Power Plants Nationwide | |
Ranked #962 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #36 out of 161 Maine Power Plants | |
Ranked #5 out of 12 Maine Natural Gas Power Plants | |
Fuel Types | Natural Gas : 96.1% Distillate Fuel Oil : 3.9% |
Previous Operators |
Verso Paper Androscoggin LLC (2013 to 2019) Pixelle Androscoggin LLC (2020 to 2022) JGT2 Energy LLC (2023 to 2023) |
Map of Androscoggin Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Androscoggin Energy Center.
Monthly Net Generation for Androscoggin Energy Center
Androscoggin Energy Center Details
Summary Information | |
---|---|
Plant Name | Androscoggin Energy Center (55031) |
Plant Address | Gate 15 Riley Road, Jay, ME 4239 |
Utility | JGT2 Energy LLC (66314) |
Latitude, Longitude | 44.50632, -70.24231 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | October 1999 |
Annual Generation | 82.0 GWh |
Fuel Types | Natural Gas : 96.1% Distillate Fuel Oil : 3.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 96-114-000; 96-114-001; 96-114-002; 96-114-003 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Paper Manufacturing (322) |
Sector | Industrial CHP (7) |
Water Source | Self Supply- Androscoggin Rvr |
Ash Impoundment | No |
Transmission / Distribution Owner | Central Maine Power Co (3266) ME |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | PORTLAND NATURAL GAS TRANS SYSTEM |
Natural Gas Storage | No |
Generator CT01 Details Out of Service October 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 13703 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 13703 |
Nameplate Capacity | 54.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 48.9 MW |
Winter Capacity | 55.5 MW |
Minimum Load | 38 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | October 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 51.2 MW |
Net Winter Capacity With Natural Gas | 58.38 MW |
Net Summer Capacity With Oil | 51.2 MW |
Net Winter Capacity With Oil | 58.38 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT02 Details Out of Service November 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 13704 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 13704 |
Nameplate Capacity | 54.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 40.7 MW |
Winter Capacity | 55.1 MW |
Minimum Load | 38 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | November 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 40.7 MW |
Net Winter Capacity With Natural Gas | 56.3 MW |
Net Summer Capacity With Oil | 40.7 MW |
Net Winter Capacity With Oil | 56.3 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT03 Details Out of Service July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 13705 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 13705 |
Nameplate Capacity | 54.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 40.6 MW |
Winter Capacity | 54 MW |
Minimum Load | 38 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 44.1 MW |
Net Winter Capacity With Natural Gas | 55.25 MW |
Net Summer Capacity With Oil | 44.1 MW |
Net Winter Capacity With Oil | 55.25 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Androscoggin Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#952 | West Marinette 34 | Peshtigo, WI | 82.9 GWh |
#953 | Generate Colchester Fuel Cells, LLC | Colchester, CT | 82.3 GWh |
#954 | Pinelawn Power LLC | West Babylon, NY | 81.7 GWh |
#955 | Elk Hills Cogen | Tupman, CA | 80.7 GWh |
#956 | Carson Ice-Gen Project | Sacramento, CA | 80.7 GWh |
#957 | Clearwater Paper IPP Lewiston | Lewiston, ID | 371.6 GWh |
#958 | Garden City | Garden City, KS | 79.5 GWh |
#959 | Phillips 66 Rodeo Refinery | Rodeo, CA | 291.0 GWh |
#960 | Chanute 2 | Chanute, KS | 79.2 GWh |
#961 | Lakefield Junction | Trimont, MN | 79.0 GWh |
#963 | Colbert | Tuscumbia, AL | 78.7 GWh |
#964 | Rokeby | Lincoln, NE | 80.3 GWh |
#965 | CP Kelco San Diego Plant | San Diego, CA | 78.1 GWh |
#966 | Cleveland Works | Cleveland, OH | 232.6 GWh |
#967 | DeRidder Mill | DeRidder, LA | 389.0 GWh |
#968 | Chino Mines | Hurley, NM | 77.4 GWh |
#969 | Sowega Power | Baconton, GA | 77.2 GWh |
#970 | Wolf Hills Energy | Bristol, VA | 77.1 GWh |
#971 | Fountain Valley Power Facility | Fountain, CO | 77.0 GWh |
#972 | Cargill Corn Milling Division | Eddyville, IA | 76.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Androscoggin Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Androscoggin Mill | Jay, ME | 69.3 GWh | 0.1 mi |
Canton Mountain Wind | Canton, ME | 50.1 GWh | 3 mi |
Farmington Solar | Farmington, ME | 126.4 GWh | 12.4 mi |
International Paper Jay Hydro | Jay, ME | 7.1 GWh | 1.1 mi |
International Paper Livermore Hydro | Livermore Falls, ME | 10.2 GWh | 3.7 mi |
International Paper Riley Hydro | Jay, ME | 5.9 GWh | 0.4 mi |
Livermore Falls CSG | Livermore Falls, ME | 5.0 GWh | 4 mi |
Mainely Solar (Wyman Hill Solar LLC) | Rumford, ME | 3.9 GWh | 13.6 mi |
Merrill Road Solar | Lewiston, ME | 5.6 GWh | 24.2 mi |
Otis Hydro | Livermore Falls, ME | 30.3 GWh | 2.8 mi |
Pleasant Street | Wilton, ME | 98.0 MWh | 8.3 mi |
Record Hill Wind | Roxbury, ME | 110.9 GWh | 20.9 mi |
ReEnergy Livermore Falls | Livermore Falls, ME | 222.7 GWh | 6.5 mi |
RoxWind | Roxbury, ME | 10.4 GWh | 19.9 mi |
Rumford Cogeneration | Rumford, ME | 410.8 GWh | 15.1 mi |
Rumford Falls Hydro Facility | Rumford, ME | 290.2 GWh | 19.2 mi |
Rumford Power LLC | Rumford, ME | 403.4 GWh | 13.9 mi |
Saddleback Ridge Wind Farm | Carthage, ME | 82.5 GWh | 9.1 mi |
Spruce Mountain WInd | Bryant Pond, ME | 52.9 GWh | 16.9 mi |
Treasure Lane Solar 1 | Manchester, ME | 1.0 GWh | 23.1 mi |