7 Frankford Avenue, Anniston Army Depot, AL 36201Plant Summary Information
ANAD Solar Array is ranked #10 out of 10 solar farms in Alabama in terms of total annual net electricity generation.
ANAD Solar Array generated 1.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | ANAD Solar Array |
---|---|
Utility Name | Alabama Power Co |
Location | Calhoun County, AL |
Initial Operation Date | July 2017 |
Last Update | Dec 2023 |
Annual Generation | 10.7 GWh |
Annual Consumption | 38.1 k MMBtu |
Ranked #5,799 out of 11,852 Power Plants Nationwide | |
Ranked #1,466 out of 5,655 Solar Power Plants Nationwide | |
Ranked #70 out of 75 Alabama Power Plants | |
Ranked #10 out of 10 Alabama Solar Power Plants | |
Fuel Types | Solar |
Map of ANAD Solar Array
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ANAD Solar Array.
Monthly Net Generation for ANAD Solar Array
ANAD Solar Array Details
Summary Information | |
---|---|
Plant Name | ANAD Solar Array (60680) |
Plant Address | 7 Frankford Avenue, Anniston Army Depot, AL 36201 |
Utility | Alabama Power Co (195) |
Latitude, Longitude | 33.62673, -85.96948 |
Generation Dates on File | Jul 2017 to Dec 2023 |
Initial Operation Date | July 2017 |
Annual Generation | 10.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Alabama Power Co (195) AL |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating July 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 7.4 MW |
Summer Capacity | 7.4 MW |
Winter Capacity | 7.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
East West Fixed Tilt | No |
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 9.7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
ANAD Solar Array Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1456 | Winslow PV - BD Solar 2 LLC | Winslow, ME | 10.9 GWh |
#1457 | Buttercup Solar, LLC | Rose Hill, NC | 10.9 GWh |
#1458 | Oxford PV - BD Solar Oxford LLC | Oxford, ME | 10.9 GWh |
#1459 | IND Solar Farm (Phase IIA) | Indianapolis, IN | 10.8 GWh |
#1460 | RE Bruceville 1 LLC | Elk Grove, CA | 10.8 GWh |
#1461 | USPS PV | Los Angeles, CA | 10.8 GWh |
#1462 | Imeson Solar | Jscksonville, FL | 10.8 GWh |
#1463 | Overhill Solar | Clinton, NC | 10.8 GWh |
#1464 | Albertson Solar LLC | Albertson, NC | 10.8 GWh |
#1465 | Saw Solar | China Grove, NC | 10.8 GWh |
#1467 | Gliden (Op Zone) | Tyner, NC | 10.7 GWh |
#1468 | Ryland Road Solar | Tyner, NC | 10.7 GWh |
#1469 | RE Bruceville 2 LLC | Elk Grove, CA | 10.7 GWh |
#1470 | Grissom Solar, LLC | Enfield, NC | 10.6 GWh |
#1471 | Riverside Renewable Energy LLC | Gloucester City, NJ | 10.7 GWh |
#1472 | Chickasaw Nation Solar Farm | Davis, OK | 10.7 GWh |
#1473 | Butterfield Solar Farm | Durant, OK | 10.7 GWh |
#1474 | Bay Branch Solar | Chocowinity, NC | 10.7 GWh |
#1475 | Intel - Ocotillo Campus Solar | Chandler, AZ | 10.7 GWh |
#1476 | Richmond Solar Park 3 | Richmond, IN | 10.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ANAD Solar Array.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 83.0 MWh | 46.7 mi |
AMEA Peaking | Sylacauga, AL | 46.3 GWh | 36.6 mi |
Calhoun Energy Center | Eastaboga, AL | 328.2 GWh | 2.7 mi |
Chattahoochee Energy Facility | Franklin, GA | 3.3 TWh | 55.7 mi |
E C Gaston | Wilsonville, AL | 3.9 TWh | 38.6 mi |
H Neely Henry Dam | Ohatchee, AL | 196.7 GWh | 11.9 mi |
Harris Dam | Lineville, AL | 128.9 GWh | 32.6 mi |
Hillabee Energy Center | Alexander City, AL | 4.5 TWh | 43.4 mi |
Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh | 56.8 mi |
Lay Dam | Clanton, AL | 454.7 GWh | 55.7 mi |
Logan Martin Dam | Vincent, AL | 343.5 GWh | 25.3 mi |
Polk Cedartown | Cedartown, GA | 4.6 GWh | 48 mi |
Polk County GA S1, LLC | Cedartown, GA | 5.2 GWh | 52 mi |
Sand Valley Power Station | Collinsville, AL | 30.6 GWh | 49.9 mi |
Sewell Creek Energy | Cedartown, GA | 425.2 GWh | 45.6 mi |
Tenaska Georgia Generation Facility | Franklin, GA | 36.9 GWh | 59 mi |
U S Alliance Coosa Pines | Coosa Pines, AL | 139.3 GWh | 30.4 mi |
Wansley Combined Cycle | Franklin, GA | 8.3 TWh | 55.8 mi |
Wansley Unit 9 | Franklin, GA | 3.2 TWh | 55.6 mi |
Weiss Dam | Leesburg, AL | 183.2 GWh | 39.7 mi |