Amistad Dam & Power
670 Texas Spur 349, Del Rio, TX 78840Plant Summary Information
Amistad Dam & Power is ranked #5 out of 20 hydroelectric power plants in Texas in terms of total annual net electricity generation.
Amistad Dam & Power is comprised of 2 generators and generated 16.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Amistad Dam & Power |
---|---|
Utility Name | International Bound & Wtr Comm |
Location | Val Verde County, TX |
Initial Operation Date | June 1983 |
Last Update | Dec 2023 |
Annual Generation | 87.6 GWh |
Annual Consumption | 322.0 k MMBtu |
Ranked #3,331 out of 11,852 Power Plants Nationwide | |
Ranked #387 out of 1,371 Water Power Plants Nationwide | |
Ranked #465 out of 754 Texas Power Plants | |
Ranked #5 out of 20 Texas Water Power Plants | |
Fuel Types | Water |
Map of Amistad Dam & Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Amistad Dam & Power.
Monthly Net Generation for Amistad Dam & Power
Amistad Dam & Power Details
Summary Information | |
---|---|
Plant Name | Amistad Dam & Power (6128) |
Plant Address | 670 Texas Spur 349, Del Rio, TX 78840 |
Utility | International Bound & Wtr Comm (9339) |
Latitude, Longitude | 29.44983, -101.06011 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1983 |
Annual Generation | 87.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Rio Grande |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 2 Details Operating October 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 33 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 29 MW |
Winter Capacity | 29 MW |
Minimum Load | 27 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 1 Details Operating June 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 33 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 29 MW |
Winter Capacity | 29 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Amistad Dam & Power Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#377 | Control Gorge | Bishop, CA | 91.0 GWh |
#378 | Lookout Shoals | Statesville, NC | 90.3 GWh |
#379 | Wallenpaupack | Drumore, PA | 90.2 GWh |
#380 | Monroe Street | Spokane, WA | 89.1 GWh |
#381 | Lake Dorothy Hydroelectric Project | Juneau, AK | 88.6 GWh |
#382 | Lemolo 1 | Idleyld Park, OR | 88.5 GWh |
#383 | High Falls - Saranac NY | Town of Saranac, NY | 88.5 GWh |
#384 | Weston Hydro | Skowhegan, ME | 88.4 GWh |
#385 | Drum 1 | Alta, CA | 88.2 GWh |
#386 | Upper Salmon B | Hagerman, ID | 87.8 GWh |
#388 | Horse Mesa | Apache Junction, AZ | 87.3 GWh |
#389 | Oxford Dam | Conover, NC | 87.3 GWh |
#390 | Copco 2 | Hornbrook, CA | 87.0 GWh |
#391 | Dearborn | Great Falls, SC | 86.9 GWh |
#392 | Allegheny Hydro No 9 | Cowansville, PA | 86.7 GWh |
#393 | Lake Lynn Hydro Station | Lake Lynn, PA | 86.5 GWh |
#394 | Schaghticoke | Schaghticoke, NY | 86.4 GWh |
#395 | Bucks Creek | Storrie, CA | 84.5 GWh |
#396 | River Mill | Estacada, OR | 83.8 GWh |
#397 | St Croix Falls | St Croix Falls, WI | 83.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Amistad Dam & Power.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anacacho Wind Farm, LLC | Brackettville, TX | 316.4 GWh | 53.4 mi |
AP Sunray LLC | Knippa, TX | 62.9 GWh | 87.9 mi |
Bandera Electric Coop PV | Leakey, TX | 3.4 GWh | 79.6 mi |
Buckthorn Westex | Ft. Stockton, TX | 375.1 GWh | 118.4 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 118.5 mi |
Eagle Pass | Eagle Pass, TX | 37.8 GWh | 52.7 mi |
Elara Solar | Pearsall, TX | 240.1 GWh | 120.1 mi |
Langford Wind Power | Christoval, TX | 587.5 GWh | 115.3 mi |
Live Oak Wind Project | Eldorado, TX | 729.6 GWh | 113.5 mi |
OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh | 82.5 mi |
Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh | 82.5 mi |
Rocksprings | Del Rio, TX | 455.5 GWh | 25 mi |
Santa Rita East | Barnhart, TX | 1.1 TWh | 121.5 mi |
Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh | 120.6 mi |
Shakes Solar | Carrizo Springs, TX | 397.8 GWh | 105.2 mi |
Shamrock Wind | TBD, TX | 645.2 GWh | 107.8 mi |
WAL447 | Del Rio, TX | 309.0 MWh | 10.3 mi |
WAL461 | Eagle Pass, TX | 299.0 MWh | 62.3 mi |
White Mesa Wind | Ozona, TX | 1.8 TWh | 101.6 mi |
Zier Solar | Brackettville, TX | 201.0 GWh | 30.7 mi |